HomeMy WebLinkAbout04 SUMMARY OF PROJECTS.docx- 8 mfb AGENDA REPORT �sT MEETING DATE TO- FROM- SUBJECT: O:FROM:SUBJECT: AUGUST 25, 2015 PLANNING COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT SUMMARY OF PROJECTS RECOMMENDATION: That the Planning Commission receive and file this item. DISCUSSION: ITEM #4 The following report provides a summary of projects and activities since the prior Summary of Projects report was presented at the April 28, 2015, Planning Commission meeting. The report focuses on the status of projects that the Planning Commission, Zoning Administrator, or staff approved; major improvement projects; Certificates of Appropriateness; Code Enforcement activities; and, other items which may be of interest to the Commission. Old Town Updates • Tustin Grille (405 EI Camino Real): A new restaurant is currently completing tenant improvements in the former Quinn's Old Town Grill location. It is anticipated to open in the near future. • New Restaurant (217 EI Camino Real): An application has been received by staff to expand the building, which is currently an office, into an approximately 3,500 square -foot restaurant with outdoor seating. The restaurant is being developed by the owner of Gabbi's Mexican Kitchen in Orange, and is anticipated to open in the Spring of 2016. Tustin Grille Planning Commission Report Summary of Projects August 25, 2015 Page 2 • American Grub Burgers & Sandwiches (365 EI Camino Real): A new restaurant is proposed to open next to The Swinging Door at the former Fred & Daffy's Antiques location. This restaurant anticipates incorporating outdoor seating, as well as a "pass-through" window to provide food for patrons in The Swinging Door. Currently, interior demo work is in progress and the restaurant is anticipated to open in Fall 2015. American Grub • Music Store (130 W. Main Street): A new music and instrument repair store has been issued permits to begin interior tenant improvements to the existing location. • Downtown Commercial Core Plan: The goal of the Downtown Commercial Core Plan (DCCP) is to develop a document that would facilitate a greater understanding and "sense of place" for the traditional center of Tustin; define strategies to enhance Old Town; create a pedestrian oriented community; revitalize the City's commercial core, protect community resources; improve connectivity and access roads; and, attract new businesses. City staff is currently reviewing the plan documents, and a third workshop will be set in the near future to present the overall plan for the area. Tustin Legacy Updates • Regency Centers (Kensington Park Dr. / Edinger Avenue). The City Council approved an Exclusive Agreement to Negotiate with Regency Centers for a commercial development at Disposition Parcel 1C located at the southeast corner of Kensington and Edinger Avenue. Regency Centers has submitted an application for design and development of the center, which is being considered by the Planning Commission on August 25, 2015. Planning Commission Report Summary of Projects August 25, 2015 Page 3 • Greenwood in Tustin Legacy (250 Downs Road): A total of 375 detached homes will be built at Disposition Parcels 1B and 6 by Standard Pacific. Construction of the model homes is complete, and Standard Pacific hosted a ribbon cutting event for the models in May. Construction of the for -sale homes is well underway currently in the framing and dry -wall phases. Stafford model homes • Victory Park (3300 Park Avenue): As part of the Anton Legacy Apartments Development Agreement, St. Anton Partners has constructed this 4.7 acre public park. Located at the corner of Park Avenue and Victory Road, the park features a variety of amenities such as orchards, picnic areas, and a play area which is reflective of the history of the Tustin Legacy area and the hangars. The park is anticipated to open on August 25, 2015. Victory Park • Greenwood Park (250 Downs Road): This six (6) acre public park is part of Standard Pacific's development of the Greenwood community. The park has features such as a community plaza, playgrounds, main lawns for recreation activities, and other amenities such as bocce ball and basketball courts, and a picnic area. The park was recently opened as part of the ribbon cutting for the Greenwood model homes. Greenwood Park Planning Commission Report Summary of Projects August 25, 2015 Page 4 • Veterans Sports Park (Valencia Avenue): This approximately 30 -acre park is designed as a community/sports park and will accommodate large group activities and offer a wide variety of facilities including: four (4) lighted soccer fields; three (3) lighted ball fields; four (4) lighted tennis courts; two (2) lighted basketball courts; two (2) lighted sand volleyball courts; eight (8) lighted pickleball courts; a skate park; and, a veterans memorial. The veteran's plaza and memorial area, designed as a place of honor, will be located at the west side of the park. The park is currently in the final stages of design with bids anticipated to be gathered in Fall 2015. • Tustin Legacy Linear Park (Barranca Parkway/Red Hill Avenue): This 26 - acre portion of the linear park is considered the "anchor" to the linear park which is anticipated to run throughout the Tustin Legacy area in the future. The park incorporates the Barranca Detention Basin within its concept plan. This park is also in the final stages of design and is anticipated to go out to bid for construction in Fall 2015. • Cornerstone 1 (Barranca Parkway/Red Hill Avenue): On June 2, 2015, the City Council approved an Exclusive Agreement to Negotiate with Lincoln Property Company for the development of a creative office complex. The development proposed includes a variety of uses such as: research and development; professional office; specialized employment; retail; a food hall; and, restaurant uses. Lincoln Property Company is currently working on a Concept Plan for this project. . .� hil�oad aaE Pr'kin8. a. 3A9PA%CA �kA.i hAti EXHIBrrf2CONCEF lALSITEOVERVIEW (not to scale) Cornerstone 1 Site Overview Planning Commission Report Summary of Projects August 25, 2015 Page 5 • Tustin Legacy New Vision Plan: The New Vision Plan will incorporate mixed- use, transportation oriented development, and a main -street concept. City Staff continues to work with Placeworks on the plan for the area. An Initial Study for the Tustin Legacy Specific Plan has been released for public review and comments which were due May 4, 2015. Staff and Placeworks are currently working on the amendments to the MCAS Tustin Specific Plan and Supplemental FEIR/EIS. • Army Reserve Land Exchange/Relocation: The U.S. Army will be relocating from their current Army Reserve Center located on Barranca Parkway adjacent to The District shopping center, to the future location at the north east corner of Red Hill Avenue and Warner Avenue. The relocation would benefit both the U.S. Army and the City of Tustin. Currently, grading has commenced at the site, and construction of the new Reserve Center is anticipated to be complete in approximately two (2) years. For further information on projects within the Tustin Legacy area, please see Attachment A which includes a map and a table providing additional information on projects approved, in progress, and proposed for the area. Zoning Administrator Actions • Temporary Haunted House (2856 EI Camino Real): On July 6, 2015, the Zoning Administrator approved a request to establish a temporary haunted house within an existing tenant space in The Market Place (next to Party City). The haunted house is proposed to operate from September 29, 2015 through November 1, 2015. Tenant improvements to the existing space are currently in plan check. Temporary haunted house tenant space Planning Commission Report Summary of Projects August 25, 2015 Page 6 • Groundwater Remediation (13872 Red Hill Avenue): On July 6, 2015, the Zoning Administrator approved a request to establish a temporary groundwater remediation system within the parking lot of the Mobile Gas Station at the subject location. • Oak Tree Plaza Parking Amendment (17582-17612 17t" Street): On July 14, 2015, the Zoning Administrator approved a Conditional Use Permit amending CUP 88-8 to revise the parking standards for the retail portion of Oak Tree Plaza to utilize the standards within the City of Tustin Parking Ordinance and also amend outdated conditions of approval related to the shopping center at the subject location. Other Updates • Density Workshop: A joint City Council and Planning Commission workshop was held on July 6, 2015. The City of Tustin received a development application to increase the current maximum residential density of 25 dwelling units per acre allowable within the City's General Plan to up to 60 dwelling units per acre. The intent of the workshop was to: discuss and graphically convey what a project of a particular density may look and feel like within a community; discuss the associated land use and other impacts with increased density; and receive general policy direction on the desirability of increasing residential density in the City. • Veterans Housing (14741 & 14751 Newport Avenue): The City of Tustin recently sold two (2) city -owned fourplexes to the Orange County Rescue Mission which will provide 32 homeless veterans with housing at the site. Each fourplex has two (2) three-bedroom units, one (1) two-bedroom, and one (1) one - bedroom unit. After renovations are made to the units by the Orange County Rescue Mission, they will be made available for housing homeless veterans. • Habitat for Humanity Housing (140 S. A Street): Habitat for Humanity is proposing to construct two (2) housing units which will give preference to veterans for housing. Habitat for Humanity also recently held a special event in the Tustin hangar in which they constructed the frames for six (6) affordable homes. • Condominium Development (1872 San Juan Street): In October 2014, the Planning Commission approved a request to subdivide an approximately 2.25 acre site for condominium purposes and to construct 26 single-family residences. Currently, plans are under review by staff for grading at the site. Planning Commission Report Summary of Projects August 25, 2015 Page 7 • Office Remodel (15771 Red Hill Avenue): A Design Review was recently approved giving authorization to remodel an existing 79,424 square -foot industrial office building. The remodel will include: new parking spaces; exterior modifications; skylights; interior partitions; and, the addition of a mezzanine area. Design of the office remodel at 15771 Red Hill • Avid Bioscience (14191 Myford Road): A pharmaceutical manufacturer is working on two (2) phases of tenant improvements to the office at the subject location. The first phase, including a clean room and storage, is complete. They are currently in plan check for build -out of the offices and labs. • Wayback Burgers (1631 Edinger Avenue): A new restaurant is proposed to locate in the existing tenant space. Plans for tenant improvements are currently in plan check, and the applicant has submitted a permit application for an ABC license at the location. • Xpress Urgent Care (17612 17th Street): Plans for tenant improvements are currently in plan check for a new urgent care facility to locate in the existing tenant space. Xpress Urgent Care is anticipated to open in Fall/Winter 2015. • New Creative Office (14201 & 14717 Franklin Avenue): An application has been submitted to remodel the existing industrial/laboratory building converting it to creative offices at subject location. Plans for the interior and exterior improvements, which includes improvement of the existing adjacent vacant parcel into new parking lot, are under review by staff. Planning Commission Report Summary of Projects August 25, 2015 Page 8 • Grower's Direct Flowers (155 W. First Street): Construction is nearly complete on a new mixed-use structure which has been proposed to open as a florist shop. Grower's Direct is anticipated to finish construction of their building in the near future. • Wokcano (3015 EI Camino Real): Wokcano is a new sushi/fusion restaurant which will be opening in The Market Place in December, adjacent to Jared Jewelers. They are currently under construction, with the shell of the building nearly complete. 201-225 W. Main 230 S. A Street 455 Pacific Street 305 W. Sixth Street 365 EI Camino Real 560 EI Camino Real Wokcano (left) E: Leaf N Cream (right) 4/10/15 Replace A/C Units on roof 4/28/15 5/6/15 5/14/15 Replace and add 2 -story _ deck New A/C unit Second floor addition A 5B1 Non -Contributing Non -Contributing 5/18/15 Interior demo 5B1 5/26/15 Wall Sign C 230 S. Prospect 6/4/15 190 EI Camino Real 6/5/15 Reconstruct fire -damaged residence Re -roof 5D1 Non -Contributing Planning Commission Report Summary of Projects August 25, 2015 Page 9 Rating System for Certificates of Appropriateness: A Obvious examples of historically significant architecture and structures that were significant in local history. B Unusual or distinctive buildings in terms of age and architecture. C Pre -1940 buildings with much of the original architectural style. D Pre -1940 buildings with substantial alteration or no significant architecture style. 5B1 Eligible for local listing only 5D1 Eligible for local listing only; contributor to District listed, or eligible under local ordinance Non-contributing Buildings: Buildings that are located in the Cultural Resources District but do not fall under any of the above categories. Code Enforcement Updates • Graffiti: The chart below displays the number of graffiti incidents from the prior three (3) fiscal years, through the year-to-date. 500 450 400 350 300 250 200 150 100 50 0 Number of Graffiti Incidents - City of Tustin n FY 2012 - 2013 J o��` ��� pec JatJ �atJ atr �t� �aJ Jae p q29 • Water Quality: 0 F 2013-2014 ❑ FY 2014 - 2015 ❑ FY 2015 - 2016 National Pollutant Discharge Elimination System (NPDES) inspections are separated into categories based on a business' use, and the intensity each use has on water quality. The two (2) categories are industrial and commercial and are separated into high, medium, and low priority. Each year, Code Enforcement Officers conduct inspections based on the priority of a project. o Industrial NPDES Inspections: During the 2015-16 fiscal year, Code Enforcement Officers are focusing on high and medium priority inspections. They are anticipating completing 50 such inspections by the end of the fiscal year. Planning Commission Report Summary of Projects August 25, 2015 Page 10 o Commercial NPDES Inspections: This year, Code Enforcement Officers are focusing on high and medium priority inspections, and are anticipating completing 63 inspections for the current fiscal year. The goal of the Water Quality Management Plan (WQMP) is to develop and implement practical programs and policies to minimize the effects of urbanization on site hydrology, urban runoff flow rates or velocities, and pollutant loads. Developers are required to submit a WQMP for any new development or significant redevelopment which increases the impervious surface of a developed site. The WQMP is required to include Best Management Practices (BMPs) for source control, pollution prevention, and/or structural treatment BMPs. o WQMP's: There are 118 properties that have a WQMP in place. Of those 118 properties, six (6) new WQMP's are currently under review by staff. Public Works Department Updates (Public Improvements) • Roadway Rehabilitation & Sidewalk Repair (CIP No. 70014 FY 2014-2015): This project is bounded by the North City Limit to the north, Newport Avenue to the west, EI Camino Real to the south and Browning Avenue to the east. The project includes removal of damaged curbs and gutters, sidewalk, and replacement of non- conforming PCC access ramps adjacent to the new asphalt improvements. This project has been awarded to RJ Noble Company, and construction has begun in July 2015, and is anticipated to be complete in December 2015. Traffic Signal Battery Backup Systems (BBS's), (CIP No. 40079) and Traffic Signal Controller Upgrades/ Replacements, (CIP No. 40080): CIP No. 40079 was implemented in four (4) phases and CUP No. 40080 in three (3) phases. With the recentLocation scheduled for curb , completion of Phase IV in June 2015, all city traffic replacement signals are now equipped with BBS's. Phases I and II of the Traffic Signal Equipment Upgrades/Replacement Project have been completed and the scope of work for Phase III is currently being developed. • Detention Basin Landscaping and Water Quality Installation at the Corner of Red Hill Avenue and Barranca Parkway (CIP No. 50038): This ecological park facility including a detention basin is partially funded by an OCTA Measure M2 Environmental Cleanup Program Tier 2 grant. The project is currently in design phase with construction anticipated to begin in early 2016. Planning Commission Report Summary of Projects August 25, 2015 Page 11 • Armstrong Avenue (CIP No. 70201) and Warner Avenue (CIP No. 70202): This project involves a roadway extension, wet and dry utilities installation, sidewalk and street lights installation, and median landscaping on Armstrong Avenue from Warner Avenue to Barranca Parkway, and Warner Avenue from Red Hill Avenue to Tustin Ranch Road. Both extensions of Armstrong Avenue and Warner Avenue are open to the public. The Armstrong Avenue and Warner Avenue extensions are now open • Edinger Well Phase II Equipping Project (CIP No. 60165): The project is located near the intersection of Edinger Avenue and Newport Avenue, adjacent to the Residence Inn and Fairfield Inn & Suites. The Phase I Well Drilling Project was completed in August 2013 in conjunction with construction of the hotels. The Phase II Equipping Project consists of constructing the wellhead, building, associated site facilities/equipment, and standby generator. Bids have been received and the contract is scheduled to be awarded soon with construction commencing thereafter. The project is funded with 2011 Water Bond Funds. Planning Commission Report Summary of Projects August 25, 2015 Page 12 • Simon Ranch Reservoir, Booster Pump Station and Pipeline Replacement Project (CIP 60114): The project is located at the intersection of Valhalla Drive and Outlook Lane in North Tustin. The project will replace the existing buried, gunite lined, earthen reservoir with a new circular, pre -stressed concrete tank. The project will also replace the existing booster pump station and approximately 1,600 feet of pipeline feeding the new pump station and reservoir. Design is underway and construction is planned to begin in FY 2015-16. The project is funded with 2013 Water Bond Funds. • Peters Canyon Wash Water Capture and Reuse Pipeline (CIP No. 50040): This is a joint project with the City of Irvine, City of Tustin, Caltrans, Orange County Flood Control, and Irvine Ranch Water District. The pipeline will capture and divert discharges of selenium laden groundwater via an underground pipeline to Orange County Sanitation District. The flows will be captured from two (2) locations in Tustin: Edinger Circular drain and Moffett Avenue. The project will be managed and maintained by IRWD and is being partially funded by a grant from SAWPA and OCTA. The project went to bid in March 2015, and E.J. Meyer was selected. Construction began in July 2015, and is anticipated to be completed in August 2016. 4 • VrAgo 4"10 Construction has commenced on the pipeline project • Biofiltration Retrofit — Edinger/Red Hill/Valencia/Kensington Park Quadrant (CIP No. 50041): Retrofit the existing 29 catch basins along Valencia Ave, Kensington Park Drive, Armstrong Avenue, Severyns Road, & Lansdowne Road with a modular wetland BMP. The project is partially funded by an OCTA Measure M2 Environmental Cleanup Program Tier 2 grant. The project was awarded to Beador Construction Co. and construction is anticipated to begin in August 2015. Planning Commission Report Summary of Projects August 25, 2015 Page 13 • Roadway Extensions (Various): The Public Works Department is currently in progress with a number of roadway extensions in the Tustin Legacy area. The extensions include: Moffett Drive from Park Avenue east of Peter's Canyon Channel; Park Avenue from Moffett Drive to Victory Road; and, Bell Avenue from Red Hill Avenue to Armstrong Avenue. The Moffett Drive and Park Avenue extension projects have been awarded to KEC Engineering and are anticipated to commence in Summer 2015. • Peters Canyon Channel Widening (CIP 50040): Design engineering is underway with the expected construction in Spring 2016. • Moffett Drive bridge construction over Peters Canyon Channel (CIP 70224): Design is underway with the expected construction in Summer/Fall 2016. Attachments: A. Tustin Legacy Map and Project Table B. Certificate of Appropriateness Documentation ATTACHMENT A I— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — N 8 V LU v 0 Im W Z ui a4 < U z on M M U w m c U C: 0 c ko CX 0 C3� Q) ko 01, 00 0 0 0 o o do .!s a u t a M ri a) m u 0 m on t m 1-4 r4 :3 rn (v m u -0 ca zm 0- V) o w oa E Ln > CL 0 0 0 0 5 -C :3 CL W 4- cc W cc cr c — 0 N C V) M u -" a w m 0 0 0 C, m C: m - :2 m m V Ln w 0. :Ll E 0 Q) 0 Oj 0 U fu C bD = = .- to u 41 C -0 , C3 W IZ t- to o Z C U u m Ln W 0 Et:� _a M 0 < CL V, -E -6 iZ iz M -6 0 U u CU -C m 0 Ln , I w th I= C4 U - a) aj E Z VN -E c C =3 . 4z (U :z tw =, 'r- m 0 a) " a) to c S S E Z :3 z UJ u LU w u u 0 0 r 0 w M E z CL E LL =3 =3 u u U V3 cr 0 Lj- z z Ln E < cu m F- u F- uj 0) 8 m m :3 00 :3 C5 .4 C4 vi 4 Lli o cd m ci CL c; Qj i V4 (4 m -4 LL ui %6 r4 u LL Im co (n ca V-4 cc rl V-4 ;5i V-4 �q r4 u cc �q v-4 CC v-4 I (-D v-4 < CC N Q ------------------------------------------------------ r4 C -i cu mi N CC N 0: C4 0: N OW-H r4 ^� air r.�,� rt�i � � � ®,.... J2 00 a. rn N 8 V LU v 0 Im W Z ui a4 < U z on M 1-0 I -C - ..L -a -0 U) (1) (1) (1) c (III) C _g_- 0 (j) (j) U) -111 c c .— Cli (1) cri 4- >% =) cu to 46 4- C to 4- E cli -0 a) N M CD :t - r -C 2: 2 a) a) 0 a) CU — > -ia QCL - c Cl) E a) 0 a) -0 CO as -0 cn co C.) > Co CY) 0 0 ID` E -C c 2 v) 2 Q C13 c c 0 0 co 0 -C 0 C 4- 0-0 CO co a) E ca 0 -C a) :3 -0 a) 0 Cl) (D 0 a) Cn 0 C a "S a3 -0 -C O >, I-- 4- C) :3 U) cu LO - .-- 1- co a) 0— T C15 C) a) -0 U) cl) cu — C.) 0 -C 4.. 0 'R t5 co 70 -0 (31 16 C +- CL to CO a) :3 -0 CL a) 0. 2 a) a cu -0 co E —c" CL L.L a) a) CO a) c 0 CL -C -C CO C 0 0) 0 to 4- -C CIO a) 4- 1 :,� 4 14- (D c co a) LO A-- 0-0 0 E CO -C a) Q) -o , a) a) -a ,- c cn c -C t c 0 .0 4- > c I M =3 0 a).r- E a) < 0)(0 Z >% CO ti a) 0 E cu -0 :t-- CU 0 .55 0 0) CIO co E co- a) 0 0 2 C Im a) 2 o -C cl 0) cz 4- 0 w m co 0 CL c 0 0 t LL.cn ui 0 0-0 =3 N(n - 0 (D -0 0 0 m N CO 01 U) 0 a) .0 cp-o— is a) a) -a -0 C 'D — 0 0 u) co 075 a) co M 0 -C -a:5 41 =3 0 p 0 =3 (D a) >1 E c -0 CL 'a -0 2 40- — 20 CM (n E C w 0 a) m a) E w a) CD < C- >, CL Co 0 L- CU 2 4- Ir- Cr z .G as Y a- co Ao * E r = CIO 0 r co >4 0.-.- 0, *-5 CL -C :3 > fn 0 •Q U) 4- 0 Z5 < r - co cu CIO c c W E 0 Z, F- CC CIO ca a.- 2 C- io a) .- 0 0 C U) 0 0 a) CO " C: a) 4- :3 () :3 Im .0- co 0 E a) I- o C: CO U - o w t 5 c L- -C CIO :3 0 cz Co C -0 a) 0 CD C.) 00 --ow —CF) =01 2 4"- 0 a 0 c U) C: C.) (Z cp .= 0 c LU :3 0 a) o 00 0 cn cs= w a2$ 0 crJ E =3 as .2 cc$ U- (D �5 = '- 0 -0 C-) ca ch 4- 0 4- 0 :3 L) -I..- r- >-, .0- 1 15 "a cc >.-a 0 a 0 +6 CD C: 0 c 1) 0) c -- —a) — — U) o - 0 CU 0 cn m a) CD 0 (1) co "0 EL >'O 0) cz -0 E C)) E > C 70 :3 (1) .0 a) 0 70 (D cz 0 Z E E cf) C: 0 cz 4- 0 §s -0 ca U) (D 02 -0- -C a) cu E as: as a) (D 0) Cl 0 -C o 4- r- CL -C E CL 2 CIO 2 cu a) 0 CD :3 U) co a. c0 o Hcuco < F- (1) CD co 0 CO w 0 (D ct$ = := Cf) C.) C ca 0 0 w CES CL C .2 cu U - >N vi N cf) 0 47- C 0) D) co r (1) CIO C.) Co 0 0 An C: 0 LL (.) � LL a) r- 0 E CC,-$ U) a) w -C 0 CY)U) c)) 0 C as cLo- 4- 4- C: M a) T 0 :3 C-) ir = > U- E2 0 0 C\j cr) Itt LO (0 1- 00 a) L -(f O U (D - co co -o 0 E ( ro U o 'c CL O c O CL CL O E L a d O C > o c� 0 J a) a) t -O O U CN �= X O U U CD co Za)� � a) OcnL ca C O 3 E �� C N�Ua) i) a) N E•. Q 4) Q co E (norma O N U a W a)NU > 'i m Q -O > to rn C_ 3 U c O T a) y •� 7 > ca E o E O Z5 a E C a) U N cci � •U O N 0 0 O� > O a) U G O O� G a O U m > w Q7 o � O cu O Ca yO a$ N � a) _ o a) N C O O o C m O _ t,L L U N Or _a ~ Q E co 20- C: dC O O > 0-- E CE c rY c i a) O _� (TS � U W crj 0.2 7 Q O N �: C ,T C U0 C co a) Q C al CL O () NU) Lw Cl) f0 � cis Q a) O - N eco mia z°U�•s C U C O U O O O w 0) = CO aU CD a)Cc E a)ma)oo a) -Cc U rn m � rn Q (G > L C C ¢ Zj C lCG co E 0)V d Ua � � N X 0-0 CC W 75 W cG O N O 0) O C C y c — CO () co 0 U O 0 C > a) CD o E «. o CLE v) 0 CO UY Ca) aS O O 0 O V N w L Q- w co ca)c�a :3L 5 Ua)oCUc U cd Mn Ct$Uc`a) a))�t5 NZ E a) a) a) O 'O _ � y y a � a O ca ca 0 U O m O —U -0 -00- 0 o 45 CL Q_a o a C O� L a) 50-0 O w m C 'Ca c6 -0 -0 Co � O L 00 CO CIS o Q o E uz a C O O U O U Q- O ui U Y a)Q O (C .a 0) O C: r 0)L N of O Q pZa a) o:F e 0)'o 3� U c Q - O OL � I— co O L U) N m O as a (D aY N Q] is E N co C as iJ Q C U O co co D)U (D O N C Y I— N m � L Q O M C f0 0.75 .LO O L Cc$ N E O L F— ca CR r C 0) O 7 N c 0 N c > C c co N O T U co LD M > c(D O N D) ca T O M— Q)- O � C3 E U) Co Q a) o c a a) Ln C � ca CI CD Q CLU �+ to :3 EY O C U 3 N 0) N C'j 3 O C C U r E E U C 0 E r - N a ca J ca a) CM C CIS J N U L� L F N C _ U V N L L 0 T C n ~ O O U m O U C to co L C � 3 I r rn (� �r �r �I- m to CV a) as r, co L a) T Y O O ❑ 2 Y C C C c N 7 0 Uo U E o O U) 0 U od U O r :3 czT c o' n Qc �E m • C: C3) cE _ U U U a) oCD 0 oca LLZU ¢ I r rn (� �r �r �I- m to C: M Cl) as -2 'r- Cu CL V) CO) Cl) 0 = < CU 0) Cu ED Ca c .6- 0 46 Q c E Wi > z5 > C-) 0 45 =3 c C La) N CL C a) E c (oO CD a) Cq 0 :3 a cz 2 E (1) C C LO rl- a) (D Cc -C 0 a) 4- CO > C)) a) c W- 0 -C Co " 0 'FD E "Do Fz c E (n C (D La-) _C c -- 0 Cz C.) a) Co CY) E = 0 r 0-0 a) c c c 0 LO 0-0 L- 0 CL a) � =3 C13 0 a) -0 Cz An - C) 0 Co C to CO C\l Ca >to 0 a) c — 0 *- CO CL -Fz -0 a) 0 a) 0) C.) 0 > 2 U- c 0 4- E LO t5 - (D 0 0= 0 Cu c C T- a) 4- -P- (D 4- 0 a) o a) 00 a) C\j CL, a) a) CL a) CL 0 C: M C;) CU 0-6 Co IZ (D E cd Ld 4- a) to E E E a) c co — a) CL a a) - > 0 CL 0) 0< ID Z5 E as 0 Q 0 c.) 0 0 a) (On L 0 0 04- L- (D a) >% (D .2 9) o o o o c CL E "Fz cu as > =3 0 CZ 0 M CD < 0 a) >% An Coto Jc _j 0 0 1--- a) Co (z Iz (D 0 Co c 0 0 0 Co Cu > CL 0-0 c 0 4- t: 4--o CL 'Fn 0 Z Cr co —(D EO cz < a) o e - 5 . DO cc CL w 0 C: 42.0-0 < 6 a) = 4- a) 4- a a) C a) c 0 (D 0 0 a) 4- Cn 0 Ca -a -- -0 -- -0 -- (a 2 Cz E U tai 0 C Cz - *2 Lo Ca CoL 0) CD L m L LO V5 (D c 0 4- 0 U) -1..; CL C c N 0 c a) _j P- M 00 (D 0 0 C: -0 0 L>, 0 0 t5 V5 :3 — ? Co 05 Co 'a -D 2 a) cnd -�e a) — Ca 02 I- Cz Co 0) U- 0,60- c c CL 'L- a) r c a) C 0 a) E! E T5 -j 5 0 acts 0) < CaV- a) H o w LQ) J < a- C 0 :3 00 N Cm Cm N Cm l 1 � I 6N Pkvrrp--ry LINE ( E OLOV ail , Cent Aw pimmym Comm�nny 0�@v �'! wwn..a via lum 14+wc+wra e p r l ,s wo,a r,.awr f wninCMbie aTurw / r) 7 -or In mw&d� rwm °.fir nM,c� tS11Pr�rl1 �M1Y art +,nr t-Vr� ND. 1001. tlM Colm,p�yn�m'��R+1 p� Atm, The pr6,wIly Catl1 roc • rwer�s . y,Fn°c m the dao vnn >... aprn ' a .{p,e w wkual 11la0uleS^MAh di h°e4?'^"� •'� rx,►t-,y v,� In palm T, pra n a wah 'nuaroi�, Ilidi. h�`x„ PdR ur! rv6� ut nep ap y�y ¢ W%=A WL -0% id d rYrn4x _ srd ruuchxri Ibu ',• IE V] Community DevcloyimenL Department 1, . APRIL 28, 2015 . V1 230 S A STREET TUST(N I A MsTopcy BUILDING OUR FUTURE HONORING OUR PAST The project is for the construction of upper and lower level deck with stairs along the west and south elevations of the house located at 230 S A Street. The project site is located within the Cultural Resources Overlay District (CR) and the main house is listed on the City's 1990 and 2003 Historic Resources Survey. The National Register of Historic Places (NRNP) status code (5131) indicates that the structure, constructed in 1895, is a property Recognized as Historically Significant by Local Government as follows: Locally significant both individually (listed, eligible, or appears eligible) and as contributor to a district that is locally listed, designated, determined eligible, or appears eligible through survey evaluation. The City of Tustin Historical Resources Survey (1990) described the site as follows: This two-story house is significant as an example of the transition from the Victorian to the Craftsman style in Tustin. During the Craftsman Period, the house was remodeled, with wider double -hung windows installed in the place of many of the original windows, a side porch added, the front porch redesigned, and the piers, concrete steps and urns built. Although the house is no longer Victorian in style, the Craftsman -style alterations appear to have been made more than fifty years ago and are considered part of the historic fabric. The building is also important because of its association with early Tustin residents. It is believed that the house was built for George W Diffenderfer in 1895. Mr. Diffenderfer owned the land and home from 1894-1904, as well as several different parcels in the neighborhood. An 1897 photograph of the house shows that it originally had a large front porch and a round turret, typical of the Victorian styles of the era. The proposed deck would include replacing the existing rear deck and small side deck with Trek engineered decking material (made of recycled materials including wood, sawdust, and plastic packaging) and adding a connecting deck at the lower level in the same material. The existing two-level deck is located at the rear of the property along the west elevation and serves the first and second story separately. There is a small deck on the south side with three steps leading to the yard. The new deck will replace the existing upper deck and will be expanded at the lower deck to accommodate a new stair way and will extend along the first level south elevation to connect the two decks. The engineered decking will include three different color materials (top railing, border, and deck) all in different natural wood shades. A color sample is attached hereto (attachment). 100 Centennial Way, Tustin, CA 92780 (714) 573-3100 71-1) X73-31 1 tiv\vw t[1qij1C,1 Certificate of Appropriateness 230 S A Street April 28, 2015 The main residence will be painted in a muted green with darker green trim and off white on the overhang. Windows will be painted in a dark brown semi -gloss with hints of red. A color sample is attached hereto (attachment). In accordance with TCC 9252h, the following required findings for construction can be made as follows: Construction of improvements in the CR District. (a) The proposed work conforms to the Municipal Code and design standards which may be established from time to time by the Historic Resources Committee. The proposed improvements conform to the Tustin City Code and any applicable design standards in that the proposed project meets Zoning Code, Building Code requirements, and Residential Design Guidelines (Permit # B2015-0104). (b) The proposed work does not adversely affect the character of the district or Designated Cultural Resources within the district. The proposed deck will replace the existing deck and be expanded at the first level. The material will be consistent with the wood appearance of a natural deck and the lower level deck will be minimally visible from 3rd Street The design is appropriate for the Craftsman style home. (c) The proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. The proposed deck will be constructed of quality materials which will maintain the original color and stability over time. The height, setback and placement of the decking is consistent with zoning and building code requirements. The placement of the decking is appropriate in scale and relation to the existing buildings. The proposed work is hereby approved, subject to the following conditions: 1. Prior to the start of any work, the applicant shall obtain a building permit and pay all applicable plan check and permit fees. 2. Prior to project final, field inspection shall be conducted to verify consistency with to the approved set of plans. Certificate of Appropriateness 230 S A Street April 28, 2015 3. The property is zoned for Single Family Residential use. Any other use than Single Family Residence shall be prohibited and the property owner shall ensure compliance with all applicable zoning and building laws. Elizabeth A. Binsack Community Development Director O\, Vq(2rV6 6wv\-k--- ji, a 11 n*4jwjj" 4 DECKING & RAILING :-w, IS A. f. ` , r L. � , r 14 Y ' dQe�i.93F;C,aY� TRANSCEND DECKING High performance » Engineered w=th urrivaled fade, stain, scratch and mold resistance » Hassle -free maintenance takes the workout of the weekend Perennial beauty » Designed in a range of rich colors with a natural -looking grain pattern » Available in two distinctive styles—premium tropical colors and rich classic earth tones » Pairs with Trex Transcend railing in coordinating colors, .plus Classic White and Charcoal Black Trex through and through » Made from 95% recycled materials » Backed by the industry-leading Trex 25 -Year Limited Residential Fade & Stain Warranty TRANSCEND (RAILING High performance » Stands firm with a strong, sturdy look and feel » Built with the same incredible durability as Transcend decking—won't rot, warp or splinter Perennial beauty » Modular components let you mix and match your custom zed look with any Trex railing line » Pairs perfectly with Transcend decking—also compatible with any decking line Trex through and through » Contains a minimum of 40% recycled material » Backed by the Trex 25'Year bruited Residential Warranty Ic . It Ask 1owriar m m St3te of Cartfomia —The Rescwo4m Anency Nmary # CEPARTMENT CE PARKS AND RE-CREATEN H�_* BUILDING, STRUCTURE, AND OBJECT RECORD Pml of 2 Bl- uric Name - B2_ +c Name: 133- Orig" Use: Residetaid B4_ Present Use: RAWmwial tBS- Afftibectmr3d Sty -%rrtocim *B6- CGUs5 MC603 HiiSftrr. ( . Ccwb==dxbaaba-&mi,=dd=d*=ticm) TE a bAM=g was constructed in I S9 S. ***-M stoma Code: SBI *Resomrce Name or # (46):230 A Sint (S) *B?. Moved?. X No, Chres Dral mown age: _ orj#W Loc.1tiom: tEM RehWFeatom: B91L 311hitect Unknown b. BmIder- urlmolam *13M Significance: Tlem Res:�t'alkd&emn -Um- Sam Ana-Thstim, CIA Period of Sipi5rance: 1870-1399 Property Tyff. R&ddantial, .Affbr" Criteris: C (riwml =wr=w4in s Cih'.Xeinlor nehiWctml "zbW &t, dagno4 by pmo4 andamcgaphk uzp& AL* uLbwz%wvFv�%) Ths mo-swy bwase is nmt&an as an example of the traasirion from the Mkiman. to the CAffman site m Tu=, Du=,v the Craftimm period, the house was remodeled. with wule double4rung windows msalled in rite place of many of the onmnal wmdom, a side pmr-b added. the front porch redemied, and the jaem cDnaete steps and -am biah- Although the house is, on lot>m victoriam in style. be Cralmm-style altervmw appear to hwe t*m made, mune thm Up)wrz ago and me considered part of the h=aic 6bnc. f The mntdmg Is 11-50 LuPcr= because Of its aswcman Y111h eady Ta-mim. residents. It is bealin-ed dW the house was Indt ki George W Di mder:kyimIS(.)-5. Mr. DMimular5er O-Amed the Ind and how from I SM -1904, as %vl as several di Tzm parcels in the meigUtchood An IS97 pbawgraph of the bmie showss. than It origirally had a kL-,e bw parch and around tm% typical of rhe Wtoxim vy3ffi of teen. Large am IBM a m=ature onap gram and flowers cover rite large yul 811. Mdibmg Resmwce MtributeE: (HF.)--Sme�e Family Rope *812. RAknwes- 0gr grTimM Mrxmics) &ave), tillifilh street xrd3irs inc- June IM Fiat Amencm Iffle CompmyRecords. Check referv-nees. RU. Ran arts I *81AL EviI=WrTBA WCJorlon *1)2t* of Et; Ort."CO2 (This space re,:,:r, fcr cf-Ficial 7cr­netfts.p I - PR 52:3811195) t3ketch M 2 w4h north arrow required_) 10 Im VA id 3 uo_ L"J6 'Required infom.Lrbi(m TUSTIN CITY CODE ZONING 9252 11. Amendment, revision or deletion of a designation may be accomplished by following the above procedures. f Certificate of Appropriateness: Required 1. A Certificate of Appropriateness shall be required prior to: (a) Alteration of the exterior features of a building or site within a designated Cultural Resource District, or alteration of a Designated Cultural Resource, or construction of improvements within a designated Cultural Resources District requiring a City building permit. (b) Demolition or removal of any Designated Cultural Resource or of any improve- ments in a Cultural Resource District. (c) A certificate of appropriateness shall not be required for the following: (1) ordinary maintenance or repairs that do not involve a change in design, exterior material or original appearance of an improvement, nor (2) any construction, reconstruction, alteration or removal of any feature which has been determined by the Building Official to be necessary to protect the public health or safety due to an unsafe or dangerous condition provided the Building Official certifies such action. g Procedure for Certificate of Appropriateness 1. Application fora Certificate of'Appropriateness shall be made on farms provided by the Community Development Department and shall contain whatever detailed informa- tion (plans, drawings, agreements, photographs, etc.) as is determined by the Com- munity Development Department to be necessary for the Department to act on the request. Where the proposed protect requires other discretionary approvals such as a tentative tract map, they background information shall also he concurrently submitted to the: Department on each of these applications. 2, Applications firr Certificate of Appropriateness shall comply with the California Environmental Quality Act (CEQA). :l. The Community Development Director shall have the authority to approve, approve with conditions, or deny Certificates of Appropriateness for improvements requiring n City building permit. In reviewing applications firr a Certificate of Appropriateness, the Community Development Director may consult with an(] receive the advice and recommendation of the Planning Commission, in their capacity as the Historic Resource Committee, prior to rendering a decision. (Ord. No. 1429. Sec. 11.27, 5-2I-13) 4. Any person may appeal any decision of the Director of Cornmunity Development or [Tanning Commission in accordance with Section 9294 of this Code (Appeals(. 5. A Certificate of Appropriateness shall lapse and become void one (1( year following the (Inte on which the certificate was approved unless; the conditions of the apfrroval specify a lesser or greater t.inie or unless, prior to ;uch expiration datea building TUSTIN CITY CODL ZONING 9252, i Findings and Additional Permit Procedures for Demolition, Removal or Relocation of Designated. Structures or Structures Constructed Prior to 1940: 1, A Certificate of Appropriateness for the demolition of a Designated Cultural Resource shall not be approved unless the Community Development Director or, on appeal, the City Council finds that one (1) or more of the following conditions exist: (a) The structure/site is a hazard to public health or safety and repairs or stabiliza- tion are not physically possible. (b) The site is required for a public use which will be of more benefit to the public than the Cultural Resource, and there is no feasible alternative location for the public use. (c) For a Designated Cultural Resource only: (1) It is not feasible to preserve or restore the structure, taking into consider- ation the economic feasibility of alternatives to the proposal. (2) The proposed replacement structure does not detract from the neighbor- hood. (d) Reconstruction or restoration is not economically feasible or practical. 2. No person shall carry out or cause to be carried out any demolition, removal or relocation of a Designated Cultural Resource or structure within a Cultural Resource District built prior to 1940 without first receiving a demolition or relocation permit. from the City. Such permit shall not be issued unless one of the following events has occurred and in the case of a demolition the applicant has complied with i.3 below: (a) A Certification of'Appropriateness has been approved by the Community Devel- opment Director or by the City Council on appeal; or #; (b) A period of 180 days has expired from the date of the Community Development Director's denial ofthe Certificate of Appropriateness, and there has been no City Council appeal. (c) A period of 180 days has expired from the date of City Council denial of a Certificate of Appropriateness;. :3. In addition to the above requirement, no demolition permit or relocation permitshall be issued for• the demolition or relocation of a Designated Cultural RctsourcC nr structure within a Cultural Resource: District built prior to 1940 until n Certificate of Appropriateness and City building permit has been issued for a replacement structurO or as otherwise approved by the Director of Community Development. (Ord. No. 1129. Sec. 11.28, 5-21-13) ItI',V. G 1201;1 1,11-2 �i•1,:� ct I Nj 13 Community Development Department T U S T I N daCERTIFICATE OF APPROPRIATENESS HISTORY MAY 13, 2015 BUILDING OUR FUTURE 305 WEST SIXTH STREET HONORING OUR PAST PROPOSAL: The property is developed with an existing, single story "Non- rated," single-family detached dwelling and detached two -car garage with a second floor bonus room and is located in the Cultural Resources Overlay District. The residence and garage were built in 2000 and 1997, respectively. The second floor bonus room was completed in 2011. The proposed project is a second floor addition of 957 square feet with a balcony of 230 square feet above the existing residence and porch. The proposed addition will be constructed to be compatible with the existing residence in terms of exterior wall and roof materials, windows, and exterior color. In accordance with Ordinance No. 1001 which was adopted June 20, 1988, by the Tustin City Council, the Community Development Director has the authority to approve, approve with conditions, or deny Certificates of Appropriateness for improvements requiring a City building permit for property located within a Cultural Resource District. The structure is "Non -rated" per the Tustin Historical Resources Survey. The Community Development Department finds and determines as follows: A. The proposed work conforms to the Municipal Code and any applicable design standards in that the proposed project meets zoning code requirements and would match the exterior colors and materials of the existing residence. B. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District in that: the existing residence is "Non -rated;" and the proposed second floor addition is setback at least 19 feet from the front of the existing residence, thereby maintaining the character of the District. C. The proposed work is harmonious with existing surroundings in that the proposed project is a new addition that is proposed to match the existing residence in terms of exterior materials and colors, and will not conflict with the architectural style of other surrounding structures. 300 Centennial Way, Tustin., CA 92780 171-4) 573-3100 (714) 57/3-31 13 * \VWWAL1tit111Ca.01_U Certificate of Appropriateness 305 W. Sixth Street May 13, 2015 The proposed work is hereby approved, subject to the following conditions: I Prior to the start of any work, the applicant shall obtain a building permit and pay all applicable plan check and permit fees. 2. Any replacement or repair of any part of the existing structure shall match the existing exterior materials, finish, and colors of the existing structure. 3. Prior to project final and occupancy, field inspection shall be conducted to verify consistency with the approved set of plans. Elizabeth A. Binsack Community Development Director SACMNScoffiCertificate of Ap prop riateness\C oA 305 W 6th St Second Floor Addition.doc \RLIN 10 ,IGN @ 75 LBS 404-1 1LL AWrow7'-- proposed WOM C." CJIAII-Cdtd ul Appiropir olwom T TUBE WELDED L PLATE qNECTION DETAIL I QI'lililln .. oil -- 11-nill a fj la,ripire kw Woo in the CNV No *"mwn D",vowl ffriM .M eMsbUsned design, (=W of the diUrid Of wKings in wirm of a and use .1 a now 04 dmdLwm Ow do DW9,. V-4113 111"), Pero','�t -* S zo IL -00(41 Slov,k Ma,M17f t G1 SOr— The proposed work Involves IMOW4~ LO StMaWe(S) ti It of Tustin Hiskwical Res"'" A v N Yol. stmatweis) Style' Rating In Wo&dafM wdh O(dmnco No. 1001, OW CWWAMY 1 dg*mWi" that: 7 the orop*sod work oorfams to the Mw*001 Coe appwabw Tt* proposed work doesnot aW nsaM jeo we c w DG&Vutod Ctjmaj Reswces within the dtiilrkl Ttw proposed work to hwmw*m wo oub"W&V sur PER PLATE .MxoV4ftft,i,s ol ffmMW& scakh sko. h6VC p WA&VOISMAMMIn.04iftM -00311�hiik swoundivig mitw%. Ap¢munn by EEL PLATE T TUBE WELDED L PLATE qNECTION DETAIL I QI'lililln .. oil -- 11-nill a fj la,ripire kw Woo in the CNV No *"mwn D",vowl ffriM .M eMsbUsned design, (=W of the diUrid Of wKings in wirm of a and use .1 a now 04 dmdLwm Ow do DW9,. V-4113 111"), Pero','�t -* S zo IL -00(41 Slov,k Ma,M17f t G1 SOr— Community Development Department TUSTIN CERTIFICATE OFAPPROPRIATENESS JUNE 3,2015 230 S PROSPECT AVENUE BUILDING OUR FUTURE The project kafor the partial demolition offire damaged areas and [estVr8tioexisting residential structure (rated 01) and detachedsingle-car garage at 230 S. Prospect /\VeDUe. The projectaite is located within the Cultural Resources Overlay District (CR) and the main house ielisted onthe <�ib/'e10BOand 2003Hiotohc��asounceoSurvey. The Nati`-na'Register ofHiatohoPlaces (��RHP)atet' ocode (5D1\indioat�athat the structure, conotru�edi1--15is not eligible for National F{egiaterbut oflocal i � atbeuauoethoneeourue: ' Isacontributor bo a fully documented district that is-tedura���h��o��a�naaa�c� historic Oex�dnQ~��ordinance- o/~ -procedure. The City of Tustin Historical Resources 8unxsy (1090) described the site as follows: The single storied building,low pitched roof, front gable, /� significant an n7 mxao6euf&heco/on��/rouh/a/ntv6e/n Tustin. facing The building's character defining features include, but are not limited to: • Low pitched front facing gable • Porch which extends the full length ofthe front fagadeand has columns with n3ilincmand balustrades~ • Door and series ofwindows that are framed with wood trim and mouldings ° Narrow, horizontal siding • Vent located above the symmetrically placed eaves ofthe front fagade Consistent with the original atructun*, the architectural design of the proposed rebuild of the residence is Late Colonial Revival and will include o |ovv pitched roof and o front facing gable. The existing porch with co|UnlD8 and railing with balustrades which extend the full length of the frontfaggde will be repaired in kind. The existing horizontal narrow siding will be repaired and reused vxhmna salvageable. The proposed colors are consistent with the existing residence in e sage green color (Twig Basket 74OD-5 Behr Premium Plus) with off-white trim. In accordance with TCC 9252h, the following required findings for construction can be made as That in accordance with TCC 9252h Required Findings for Construction or Alteration, e Certificate of Appropriateness is required prior to construction of inOp[OVenOenta within a designated Cultural Resources District requiring e City building permit. The required findings for both the resource and district shall bemade, 300(enucnnia|\%6` Tustin, C&92780 ° P.(7l4)573-3|O0 * [(7{4)579 3113 w wwWAushnca*qg 1. Alteration nfadesignated culture resource: a) The proposed work will not detrimentally alter, destroy ormdve��a��the r�u�o�.��e c��a�m��.��m�b|e with the architecturaladversely style of the existing structure. The proposed reconstruction will not adversely affect the resource in that the structures (residence and single -car garage) have been designed in the same Late Colonial Revival architecture as the original residence andgarage. Materials and colors proposed for the structures are high quality and are consistent with the existing residence. Thenefona, the reconstruction will not adversely gffaot the resource. b) The proposed modification will retain the essential elements which make the structure, site or feature culturally significant. The proposed reconstruction will retain the essential elements which make the structure culturally significant inthat the fsgadeand front entry qfthe residence was saved from the fire. Theme elements, including the low pitched roof and efront facing gab|e, the existing porch with columns and railing with balustrades which extend the full length of the front tnVade will be repaired in hind. The existing horizontal narrow aiding will be repaired and reused where salvageable. Therefore the essential elements will remain on the structure thereby preserving the cultural resource. 3. Construction ofimprovements inaCultural Resource District. a) The proposed work conforms tothe Municipal Code and des'n��a�o�i� m�be���ished1�m�me��me�U�H��c��ur� -mmittee. The reconstruction conforms to the City's Cultural Resource District Residential Design Guidelines. The following excerptsapply to the reconstruction of the efforts should retain and restore original elements of the house. If damage or deterioration is too sevena, the element might be recreated using materials which match the design, color, texture and other important design features". "Colonial Revival - Types of siding and all birn, vindoxva, and other decorative elements may bepainted inowide array ofcolors. Paint colors Ubr<�o|onio|Qevmd xve�]generally ofarnutedtone, not bhghtorbold, and are o�ho-light ordark, muted medium tones were not used. Color combinations are generally light and darh, with one onthe main body ofthe building and the other onthe thm." As indicated in 8252h1aand b, the materials and colors proposed will be consistent with the Late Colonial Revival architecture. The reuse and reconstruction utilizing salvageable nnutehu|a and matching the existing colors will further the consistency with the Old Town area by incorporating the historic features beck into the structures, b) The proposed work does not adversely affect the character of the district or The proposed project is compatible with surrounding structures and uses within the Old Town area. The existing fagade will be repaired and will retain the original features including the existing porch with columns and railing with balustrades. The reconstruction will be essentially the same as the original structure and will be finished with the existing neutral green color on the residential structure and single - car garage. c) The proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. The reconstructed residence and single -car garage will be substantially the same as the original structure. The exception is: • Addition of 6'8" by 187' to the rear (west) end of the house to accommodate a master bedroom and bathroom and • Minor expansion of the garage in order to accommodate an interior space of 10' x 20' and a popout for a washer and dryer. Therefore, the scale, size, height, placement and use of the new buildings are compatible with the surrounding setting. The proposed project is hereby approved, subject to the following conditions: 1. The property owner and applicant signing and returning to the Community Development Department the notarized Agreement to Conditions Imposed form in accordance with Condition No. 1.4 of Exhibit A of ZAA 2013-008. 2. The Agreement with Conditions of Approval/Discretionary Permit Approval form is required to be signed and notarized by the property owner, and recorded with the Orange County Recorder's Office. Please submit a copy of the recorded document to the Community Development Department. Elizabeth A. Binsack Community Development Director PERMIT APPLICATION CITY OF TUSTIN COMMUNITY DEVELOPMENT DEPARTMENT 714/573-31310(714/573-3132 FAX: 7141573.3129 PO'D S na - (circleonel^ PLAN CHECKERSIgnature tarctrone}y K far ssu Submitta U OK for IssuanWS`ubmittak PLAN CH "Plan Check will ernire in 360 days from .submittal date**. VALUATION OF PROJECT $ 3, dF'kROJECT ADDRESS on a APPLICANT (contact) NAME: PROPERTY OWNER: (required} I am the: Phone No. Name 0 Property owner b Architect Contractor + LI Engineer Address cAF_ ssq_' UA^4 % Employee of the Ci zU.2� O Owner ❑ Contractor (venflcartonofWoder'rComp. RequlredJ4 Phone Number 71q,, 669, Email Address @ . CONTRACTOR: Co. Name Q) u_,;,_ S1 Address State License # S�j j b'7j Class//.Exp. r {,State/Zip Zb� ��J Pane #� —SUB -CONTRACTOR: D YES, ,,Wtlo Email Address Department ARCHITECT: Co. Name Ce,ohcateus ro'riat0nesa__ Address City State Licetarelk _ _ late/Zip Phone # Proposed Work: "2 mail Address @ — ENGINEEfU oZoa t+laet evoroes ,mprovemem io stnxiure(tl tnet is aro included inuw*W drem City of TUefln H1e101-1 Reeaurcm urVeY -.puri' State Re91'NtzftMh""51 "'y' - Class Erb. &teW/Zig Phone # In accordance w tr. , - I, . n ," No iDot, ine community Dewopment Depa undegiinQall Address @ ,,V , nu ., . ., .. . woos m um "'1 ,,we ano eagimiiensia aengn Room a ti4�Alterati r . ANIp . N„ Linear feet of block wall (x) max. 6'-8” high �s,actar n11M Garage °ei """"""' """ Linear feet of retaining wall (x) max. 6'-8" high .(jr�y r.ln.�.,rno.,v wnr, a ,I,na xm imdrnge'�n term-. ot, IIgl il-1ramQ nR S.Xe' W o, placement and use of a new O �. lFtt Linear feet of wood fence (x) max. 6'-8" high masonry "" "� °-e sq, .1d suurWre/anA/he �_ q. Proposed Roofing Material Q ,� ��L Patio enclosure sq. ft. ICC ER# z V Y2 of roofing Ti Patio cover sq. ft. Roof area sq. ft. Pool & Spa sq. ft. If 7.01bs, or over per sq. R., please provide structural analysis by a registered engineer. Sign q. ft. Demolition sq. ft. Skylight sq. ft. Fire sprinklers New Building Area Tenant Improvement sq. ft. sq. ft. Occupancy Class Grading area Construction Type sq. ft. Fbr all waste collection bins or roll off boxes, i1 is mandator} m use ( R&R Inc., 01-y's franchise waste hauler. (Tustin ( itv 'ode Section 4321 - f APPLICANT SIGNATURE: __ DATE: I , r