Loading...
HomeMy WebLinkAboutRDA CT GYM GAS MAIN 03-21-94AGENDA - ,- DATE: MARCH 21, 1994 RDA NO. 3 3-21-94 Inter-Com · TO: WILLIAM A. HUSTON, EXECUTIVE DIRECTOR, TUSTIN COMMUNITY REDEVELOPMENT AGENCY FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: COLUI~US-TUSTIN GYMNASIUM - GAS ~hltlN EXTENSION RECOMMENDATION: That the Tustin Community Redevelopment Agency approve the contract.for a gas mainline extension along Beneta Way and authorize the Chairman to execute said contract. Additionally, that the expenditure in the amount of $2,197.66 be authorized to be paid from the Columbus-Tustin Gymnasium Project Contingency Fund. FISCAL IMPACT: The advance payment for the gas mainline extension to provide service to the Columbus-Tustin Gymnasium has been calculated to be $2,197.66 by the Southern California Gas Company. This cost will be charged against the contingency budget for the gymnasium project and will require no additional or supplemental budget appropriation. BACKGROUND: The Columbus-Tustin Gymnasium Project is currently under construction at the parksite located at Prospect Avenue and Beneta Way. The attached contract provides for the gas main extension along Beneta Way, which will ultimately provide service.to'~he gymnasium facility. This charge in the amount of $2,197.66 covers the cost of installing 223 feet of gas main in Beneta Way. DISCUSSION: The attached contract is a typical type document that has been prepared by the Southern California Gas Company and has been executed and approved previously by the City on many projects within the Tustin Ranch development. The City Attorney's office has previously reviewed and approved the format of this contract. It is requested that the Tustin Community Redevelopment Agency approve the attached contract and authorize the Chairman to execute said contract on behalf of the Agency. Additionally, it is requested that the Agency authorize the 'additional expenditure in the amount of $2,197.66 for this gas main extension from the Columbus-Tustin Gymnasium Project Contingency Fund. Robert Ledendecker Director of Public Works/City Engineer RL: ccg: ctgym Attachment REV:ISH) ~', CONTRACT FOR EX1. Service [-I Main SION OF GAS ~ Service and Main LINE I 4 No. L,2000129/V47771 M.E.O. No. 54____2~-042 TO SUPPLY: No. Units ! Lot(s) RESIDENTIAL: [-- Individual [] Multi-Family [] Subdivision [] Tract NON-RESIDENTIAL: ;~ Commercial [] Gas Engine [] Firm Industrial Tract No. [] Interruptible Address_ la652 S. Prospect Avenue Applicant's Name City of Tustin AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE Gas Appliances/Equipment Input to be installed Rating. Service Main.. No. MBTU Range(s) Water Htr.(s) 40 . __20 . Space Heating Unit(s) 3@125/2~300/1@150 165 Cooling Unit(s) Clothes Dryer(s) Maximum Free Allowance Applicant hereby requests Southern Californi, Install 2" PE Main in Beneta Esi ..... City Tus t i n 8O 567 _ Ft. 647 Ft. When the footage of service pipe required to reach the meter location exceeds the free service footage allowance provided in Rule No. 21, the applicant will be required to advance the cost of such excess footage at $ 7 o 20 per foot. If curb meter vault(s) are installed as part of the in- stallation, the dollar value of free service footage allowance may be applied against the cost of the meter vault installation. [] Attached equipment list becomes a part of this contract. pany to install gas main substantially as follows: ,ct Avenue Contract default b, the a_~p~Llicant(s) to be liable effect on the date the for construction shall actually realized bDi the In any.__event, the tax A_~_plicant's initials: monies to become dueand~ shall cau hal federal and state tax tax termined to be due and :CA usin_n_~a tax factor whiC tax deductibilit, not exceed the tax advanced. SoCalGas' Initials:~~ ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH Main Extension Required ......................................................... 870 Ft. APR_ INIT Less Allowance(s) for 1 Applicant(s) 647 Ft. Total Advance Required .......................... 223 Ft. @ $ 7.30 per ff. = $ 1,627.90 569 76 .- ........ : -' 2,'8~ ' ' :F- -e -cl; 'e: 'r' -a- -1:-=- -~'0- '5- -5- -'- -8' '1' - ' '+' '7'~ 'S' -t' 'a' 't' 'e''' '=''' s -1' '1' '3' ''' -9''5' ................................. ~' 2,197.~6 torat/~vancen Dy Applicant ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBD|VISlONS, TRACTS AND MULTI-FAMIt.Y DWELLINGS IN ACCORDANCE WITH RULE 20. Advance Required ......................................................... Amount Postponed ......................................................... $. -- Advance Payable With This Contract ............................... $-- Installation will be made by Southern California Gas Company according to Rule 20'for main extension and Rule 21 f¢ filed by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions A copy of the rule(s) will be provided upon request. SOUTHERN CALIFORNIA GAS COMPANY Applicant____Ci t:g_9_of Tust in By Date_ Division ....52r_~nge Coast Region By. Title.__ Mail Address_ 300 Centennial Tustin, CA 92680 SO. CALIF GAS CO -- --DRM 3905A ~ IO-7~ as side.