HomeMy WebLinkAboutRDA CT GYM GAS MAIN 03-21-94AGENDA - ,-
DATE:
MARCH 21, 1994
RDA NO. 3
3-21-94
Inter-Com ·
TO: WILLIAM A. HUSTON, EXECUTIVE DIRECTOR, TUSTIN COMMUNITY
REDEVELOPMENT AGENCY
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: COLUI~US-TUSTIN GYMNASIUM - GAS ~hltlN EXTENSION
RECOMMENDATION:
That the Tustin Community Redevelopment Agency approve the contract.for
a gas mainline extension along Beneta Way and authorize the Chairman to
execute said contract. Additionally, that the expenditure in the amount
of $2,197.66 be authorized to be paid from the Columbus-Tustin Gymnasium
Project Contingency Fund.
FISCAL IMPACT:
The advance payment for the gas mainline extension to provide service to
the Columbus-Tustin Gymnasium has been calculated to be $2,197.66 by the
Southern California Gas Company. This cost will be charged against the
contingency budget for the gymnasium project and will require no
additional or supplemental budget appropriation.
BACKGROUND:
The Columbus-Tustin Gymnasium Project is currently under construction at
the parksite located at Prospect Avenue and Beneta Way. The attached
contract provides for the gas main extension along Beneta Way, which
will ultimately provide service.to'~he gymnasium facility. This charge
in the amount of $2,197.66 covers the cost of installing 223 feet of gas
main in Beneta Way.
DISCUSSION:
The attached contract is a typical type document that has been prepared
by the Southern California Gas Company and has been executed and
approved previously by the City on many projects within the Tustin Ranch
development. The City Attorney's office has previously reviewed and
approved the format of this contract.
It is requested that the Tustin Community Redevelopment Agency approve
the attached contract and authorize the Chairman to execute said
contract on behalf of the Agency. Additionally, it is requested that
the Agency authorize the 'additional expenditure in the amount of
$2,197.66 for this gas main extension from the Columbus-Tustin Gymnasium
Project Contingency Fund.
Robert Ledendecker
Director of Public Works/City Engineer
RL: ccg: ctgym
Attachment
REV:ISH) ~',
CONTRACT FOR EX1.
Service [-I Main
SION OF GAS
~ Service and Main
LINE
I 4 No. L,2000129/V47771
M.E.O. No. 54____2~-042
TO SUPPLY: No. Units ! Lot(s)
RESIDENTIAL: [-- Individual [] Multi-Family [] Subdivision [] Tract
NON-RESIDENTIAL: ;~ Commercial [] Gas Engine [] Firm Industrial
Tract No.
[] Interruptible
Address_ la652 S. Prospect Avenue
Applicant's Name City of Tustin
AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE
Gas Appliances/Equipment Input
to be installed Rating. Service Main..
No. MBTU
Range(s)
Water Htr.(s) 40 . __20 .
Space Heating Unit(s) 3@125/2~300/1@150 165
Cooling Unit(s)
Clothes Dryer(s)
Maximum Free Allowance
Applicant hereby requests Southern Californi,
Install 2" PE Main in Beneta
Esi
..... City Tus t i n
8O
567 _
Ft. 647 Ft.
When the footage of service pipe required
to reach the meter location exceeds the
free service footage allowance provided in
Rule No. 21, the applicant will be required
to advance the cost of such excess footage
at $ 7 o 20 per foot. If curb meter
vault(s) are installed as part of the in-
stallation, the dollar value of free service
footage allowance may be applied against
the cost of the meter vault installation.
[] Attached equipment list becomes a
part of this contract.
pany to install gas main substantially as follows:
,ct Avenue
Contract default b, the
a_~p~Llicant(s) to be liable
effect on the date the
for construction shall
actually realized bDi the
In any.__event, the tax
A_~_plicant's initials:
monies to become dueand~ shall cau
hal federal and state tax tax
termined to be due and
:CA usin_n_~a tax factor whiC
tax deductibilit,
not exceed the tax advanced.
SoCalGas' Initials:~~
ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH
Main Extension Required ......................................................... 870 Ft. APR_ INIT
Less Allowance(s) for 1 Applicant(s) 647 Ft.
Total Advance Required .......................... 223 Ft. @ $ 7.30 per ff. = $ 1,627.90
569 76
.- ........ : -' 2,'8~ ' ' :F- -e -cl; 'e: 'r' -a- -1:-=- -~'0- '5- -5- -'- -8' '1' - ' '+' '7'~ 'S' -t' 'a' 't' 'e''' '=''' s -1' '1' '3' ''' -9''5' ................................. ~' 2,197.~6
torat/~vancen Dy Applicant
ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBD|VISlONS, TRACTS AND MULTI-FAMIt.Y DWELLINGS IN ACCORDANCE
WITH RULE 20.
Advance Required .........................................................
Amount Postponed ......................................................... $. --
Advance Payable With This Contract ............................... $--
Installation will be made by Southern California Gas Company according to Rule 20'for main extension and Rule 21 f¢
filed by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions
A copy of the rule(s) will be provided upon request.
SOUTHERN CALIFORNIA GAS COMPANY
Applicant____Ci t:g_9_of Tust in
By
Date_
Division ....52r_~nge Coast Region
By.
Title.__
Mail Address_
300 Centennial
Tustin, CA 92680
SO. CALIF GAS CO -- --DRM 3905A ~ IO-7~
as
side.