NO. 11
3-7-94
Inter-Com
DATE:
MARCH 7, 1994
TO: WILLIAM A. HUSTON, CITY MANAGER
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: COLUMBUS-TUSTIN GYMNASIUM - GAS MAIN EXTENSION
RECOMMENDATION:
That the Tustin city Council approve the contract for a gas mainline
extension along Beneta Way and authorize the Mayor to execute said
.......... contractv--Additionally;-that--the expendi~ture-in the.-amount.--of..$2,197-.~66.
be authorized to be paid from the Columbus-Tustin Gymnasium Project
Contingency Fund.
FISCAL IMPACT:
The advance payment for the gas mainline extension to provide service to
the Columbus-Tustin Gymnasium has been calculated to be $2,197.66 by the
Southern California Gas Company. This cost will be charged against the
contingency budget for the gymnasium project and will require no
additional or supplemental budget appropriation.
BACKGROUND:
The Columbus-Tustin Gymnasium Project is currently under construction at.
the parksite lOcated-at Prospect Avenue and Beneta Way. The attached
contract provides for the gas main extension along Beneta Way, which
will ultimately provide' service to the gymnasium facility. This charge
in the amount of $2,197.66 covers the cost of installing 223 feet of gas
main in Beneta Way.
DISCUSSION:
The attached contract is a typical type document that has been prepared
by the Southern California Gas Company and has been executed and
approved previously by the City on many projects within the Tustin Ranch
development. The City Attorney's office has previously reviewed and
approved the format of this contract.
It is requested that the Tustin City Council approve the attached
contract and authorize the Mayor to execute said contract on behalf of
the City. Additionally, it is requested that the City Council authorize
the additional expenditure in the amount of $2,197.66 for this gas main
extension from the Columbus-Tustin Gymnasium Project Contingency Fund.
Robert Ledendecker
Director of Public Works/City Engineer
RL: ccg: ctgym
Attachment
CONTRACT FOR E×TE,. ON OF GAS LINE
[] Service [] Main X~ Service and Main
No. /;2000129/V~7771
M.E.O. No. .5~g/4-0#2
TO SUPPLY: No. Units I Lot(s)
RESIDENTIAL: [-] Individual El Multi-Family [-I Subdivision El Tract
NON-RESIDENTIAL: >t~ Commercial El Gas Engine El Firm Industrial
Tract No.
[--I Interruptible
Address 1/4652 S. Prospect Avenue
Applicant's Name City of Tustin
City. Tustin
AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE
Gas Appliances/Equipment Input
to be installed Rating.
No. MBTU
Service Main
Range(s)
Water Htr.(s) /40 20 __ 80
Space Heating Unit(s) 3@125/2~300/1@150 165 __ 5 67 .
When the footage of service pipe required
to reach the meter location exceeds the
free service footage allowance provided in
Rule No. 21, the applicant will be required
to advance the cost of such excess footage
at $ 7.20 .per foot. If curb meter
vault(s) are installed as part of the in-
stallation, the dollar value of free service
Cooling Unit(s) footage allowance may be applied against
Clothes Dryer(s) ............................................................................... -{he c&s~' of th~-'r~-e-ter '~auit insi~iiati0n. "'
D Attached equipment list becomes a
part of this contract.
Maximum Free Allowance 185 Ft... 6/47 __Ft.
Applicant hereby requests Southern California Gas Company toinstallgas main substantially asfollows:
Install 2" PE Main in Beneta ~ay S/E Prospect Avenue
Estimated Main Required: 870'
Contract default by the applicant(s) causing monies to become due and payable shall cause
.applicant(s) to be liable for additional federal and state tax (ITCCA) at the tax rate in
effect on the date the default is determined to be due and payable. Any refund of an advance
for construction shall include an ITCCA using a tax factor which reflects the tax benefit
actually realized by the utiiit¥ ~hrough tax deductibility in the year the refund occurs.
In any event, the tax refund shall not exceed the tax advanced.
Applicant's Initials; SoCalGas~ Initials:
ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH RULE 20
Main Extension Required .................... 870 Ft. APPL INIT
Less Allowance(s) for. 1 Applicant(s) ...... 6/47 Ft. CAS(D INIT
Total Advance Required .......................................................... 223_____Ft. @ $ 7.30 per ft. = $ 1,627.90
~~8~%~F~e~d~e~r~.a~1~=~`$~5~5~:~8~1~.+~7~%~S~t~~1~`~Total Advanced By Applicant ................................. ~' 2,197.~656976
ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBDIVISIONS, TRACTS AND MULTI-FAMILY DWELLINGS IN ACCORDANCE
WITH RULE 20.
Advance Required ......................................................... $
Amount Postponed ........................................................
Advance Payable With This Contract ............................... $
!nstallation will be made by Southern California Gas Company according to Rule 20 'for main extension and Rule 21 for service extension, as
qled by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions shown on the reverse side.
copy of the rule(s) will be provided upon request.
3y.
SOUTHERN CALIFORNIA GAS COMPANY
3ate
3ivision Or_aQge C_o_a__~t Re_~g i on
Applicant___City of Tustin
By
Title
Mail Address
300 Centennial
Tustin, CA 92680