HomeMy WebLinkAbout06 SUMMARY OF PROJECTS - COMMUNITY DEVELOPMENTAgenda Item 6
Reviewed:
AGENDA REPORT City Manager
Finance Director N A
MEETING DATE: SEPTEMBER 15, 2015
TO: JEFFREY C. PARKER, CITY MANAGER
FROM: COMMUNITY DEVELOPMENT DEPARTMENT
SUBJECT: SUMMARY OF PROJECTS
SUMMARY:
The following report provides a summary of projects and activities from the Community
Development Department to the Tustin City Council. The report focuses on the status
of projects that the Planning Commission, Zoning Administrator, or staff approved;
major improvement projects; Certificates of Appropriateness; Code Enforcement
activities; and, other items of interest.
RECOMMENDATION:
That the City Council receive and file this item.
FISCAL IMPACT:
No fiscal impact.
CORRELATION TO THE STRATEGIC PLAN:
This summary of projects report contributes to Goal E of the Strategic Plan in
Organizational Excellence and Customer Service. It is staff's desire to keep the
community informed on the status of recent projects which are progressing throughout
the City. Sharing this report to the Planning Commission, City Council, and through the
City's website, contributes toward both organizational excellence and customer service.
DISCUSSION:
Below are updates from the Community Development Department related to: the Old
Town area; Tustin Legacy; recent actions taken by the Zoning Administrator; other
planning and building project updates throughout Tustin; recent Certificate of
Appropriateness documentation; and, updates related to Code Enforcement.
Summary of Projects
September 15, 2015
Page 2
Olci T1) 1 UE•�clEM
TusUn GrMe (405 0 Carnono Read): Tenant
improvements are nearly complete in the
former Quinn's Old Town Grill location. It is
anticipated to open soon.
New Restaurant (217 HI Carn1 o ReaI): An
application has been received by staff to
expand the building, which is currently an
office, into an approximately 3,500 square -foot
restaurant with outdoor seating. The restaurant
is being developed by the owner of Gabbi's
Mexican Kitchen in Orange, and is anticipated
to open in the Spring of 2016.
Arneftan Grub Burgers & Sandw ches (355
E� C arnuno Read): A new restaurant is
z
proposed to open next to The Swinging Door at the Tustin GrWe
former Fred & Daffy's Antiques location. This restaurant
anticipates incorporating outdoor seating, as well as a "pass-through" window to
provide food for patrons in The Swinging Door. Currently, interior demo work is in
progress and the restaurant is anticipated to open in G=all 2015.
American Grub
Summary of Projects
September 15, 2015
Page 3
Music Store (130 W. Malin Street)- Permits for a new music and instrument repair
store have been issued and interior tenant improvements are underway at the
existing location.
Downtown Cornunercua0 Coro PIlano The goal of the Downtown Commercial Core
Plan (DCCP) is to develop a document that would facilitate a greater understanding
and "sense of place" for the traditional center of Tustin; define strategies to enhance
Old Town; create a pedestrian oriented community; revitalize the City's commercial
core, protect community resources; improve connectivity and access roads; and,
attract new businesses. City staff is currently reviewing the plan documents, and a
third workshop will be set in the near future to present the overall plan for the area.
IL tsL-c•�,. c U{•��•�.. t�_
Regency Centers (Kensington Park Dr. / Edinger Avenue). The City Council
approved an [exclusive Agreement to Negotiate with regency Centers for a
commercial development at Disposition Parcel 1 C located at the southeast
corner of Kensington and Edinger Avenue. regency Centers has submitted an
application for design and development of the center, which was approved by the
Planning Commission and is tentatively scheduled to be heard by the City
Council in October.
Greenwood on Tustin Legacy (250 Downs Road): A total of 376 detached
homes will be built at Disposition Parcels 1B and 6 by Standard Pacific.
Construction of the model homes is complete, and Standard Pacific hosted a
ribbon cutting event for the models in May. Construction of the for -sale homes is
well underway currently in the framing and drywall phases.
Summary of Projects
September 15, 2015
Page 4
Vuctory Park (3300 Park avenue): As
part of the Anton Legacy Apartments
Development Agreement, St. Anton
Partners has constructed this 4.7 acre
public park. Located at the corner of Park
Avenue and Victory load, the park
features a variety of amenities such as
orchards, picnic areas, and a play area
which is reflective of the history of the
Tustin Legacy area and the hangars. The
park celebrated its grand opening on
August 25, 2015.
Victory Park
Greenwood Park (250 Downs Read): This six (6) acre public park is part of
Standard Pacific's development of the Greenwood community. The park has
features such as a community plaza, playgrounds, main lawns for recreation
activities, and other amenities such as bocce ball and basketball courts, and a
picnic area. The park was recently opened as part of the ribbon cutting for the
Greenwood model homes.
TIME • ��,y 4 } ii
�—Greenwood Park
o Veterans Spouts Park (Va�eneoa Avenue): This approximately 30 -acre park is
designed as a community/sports park and will accommodate large group
activities and offer a wide variety of facilities including: four (4) lighted soccer
fields; three (3) lighted ball fields; four (4) lighted tennis courts; two (2) lighted
basketball courts; two (2) lighted sand volleyball courts; eight (8) lighted
pickleball courts; a skate park; and,' a veterans memorial. The veteran's plaza
and memorial area, designed as a place of honor, will be located at the west side
of the park. The park is currently in the final stages of design with bids
anticipated to be gathered in Pall 2015.
o T usfln Legacy Uneau Park (Baruanca Parkway/Red HM Avenue): This 26 -
acre portion of the linear park is considered the "anchor" to the linear park which
is anticipated to run throughout the Tustin Legacy area in the future. The park
incorporates the Barranca Detention Basin within its concept plan. This park is
also in the final stages of design and is anticipated to go out to bid for
construction in Pall 2015.
D-miffiary al� Projects
r-% '
,-)epiernber 15, 2015
IlPage 5
• Cornerstone 1 (Rarranca Parkway/Red HM AYenus-. On June 29 20159 the
Ci -y (,oiuincil approved an Exclusive Agreement to Negotiate with Lincoin
Propeir(y Company for the deveDopment of a creative office comp0ex. The
deveallopment proposed incOudes a variety of uses such as: research and
davcallopment'- professiona� office- spe6aHzed empioyment; retaH; a food haH- and
reslaurainit uses. Unco0n Property Company is currenfly working on a Concept
Man 11or this project.
EXHIBIT 1.2 CONCEPTUAL SITE OVERVIEW
(not to xale)
Cornerstone 1 Site Overview
Tustin Legacy New Vision Plan: The New Vision Plan Mfl incorporate mixed-
use, transportation oriented development, and a main -street concept. City Staff
continues to work with Placeworks on the pian for the area. An Wtia0 Study for
the Tustin Legacy Specific Pian has been reDeased for public review and
comments which were due May 49 2015. Staff and Paceworks are currently
working on the amendments to the Mv CAS Tustin specific Pan and Suppiementa0
FEMMS.
0 AFmy Resevws Land The U.S. Army will be reDocating
from their current Army Reserve Center located on Barranca Parkway adjacent
to The District shopping center, to the future Qocation at the north east corner of
Red Hili Avenue and Warner Avenue. The relocation would benefit both the U.S.
Army and the City of Tustin. Currenfly, grading has commenced at the site, and
construction of the new Reserve Center is anticipated to be complete in
approximaleiy two (2) years.
Summary of Projects
September 15, 2015
Page 6
TusUn Legacy Sugnage: New identification signage has
begun to be placed around Tustin Legacy. These signs
provide overall identification for the Tustin Legacy Area,
and let the public know what new developments are
upcoming.
For further information on projects within the Tustin Legacy area,
please see Attachment A which includes a map and a table
providing additional information on projects approved, in
progress, and proposed for the area.
Zonunq AdmWstrator Acdons
cc
Cornerstone
project site
signage
Temporary Haunted House (2856 0 Camuno Reai): On --
,duly 6, 2015, the Zoning Administrator approved a request to establish a
temporary haunted house within an existing tenant space in The Market Place
(next to Party City). The haunted house is proposed to operate from September
29, 2015 through November 1, 2015. Tenant improvements to the existing space
are currently in plan check.
11'
Temporary haunted house tenant space
Groundwater Remediation (13872 Red Hili Avenue): On July 6, 2015, the
Zoning Administrator approved a request to establish a temporary groundwater
remediation system within the parking lot of the Mobile Gas Station at the subject
location.
Oak Tree Piaza ParkIng amendment (17582-17612 17th Street): On July 14,
2015, the Zoning Administrator approved a Conditional Use Permit amending
CIDP 88-8 to revise the parking standards for the retail portion of Oak Tree Plaza
to utilize the standards within the City of Tustin Parking Ordinance and also
amend outdated conditions of approval related to the shopping center at the
subject location.
Summary of Projects
September 15, 2015
Page 7
Other Updates
Density Workshop. A joint City Council and Planning Commission workshop
was held on ,duly 6, 2015. The City of Tustin received a development application
to increase the current maximum residential density of 25 dwelling units per acre
allowable within the City's General Plan to up to 60 dwelling units per acre. The
intent of the workshop was to: discuss and graphically convey what a project of a
particular density may look and feel like within a community; discuss the
associated land use and other impacts with increased density; and receive
general policy direction on the desirability of increasing residential density in the
City.
Veterans Housing (14741 & 14751 Newport Avenue): The City of Tustin
recently sold two (2) city -owned fourplexes to the Orange County Rescue
Mission which will provide 32 homeless veterans with housing at the site. Each
fourplex has two (2) three-bedroom units, one (1) two-bedroom, and one (1) one -
bedroom unit. Renovations at the fourplexes are now underway.
Habitats for Humanity Housing (140 So Q Street): Habitat for Humanity is
proposing to construct two (2) housing units which will give preference to
veterans for housing. Habitat for Humanity also recently held a special event in
the Tustin hangar in which they constructed the frames for six (6) affordable
homes.
Condominium DeveDoprnent (1872 San Juan Street): In October 2014, the
Planning Commission approved a request to subdivide an approximately 2.25
acre site for condominium purposes and to construct 26 single-family residences.
Currently, plans are under review by staff for grading at the site.
Office rReQl`node� (15771 Reil HM Avenue): A Design Review was recently
approved giving authorization to remodel an existing 79,424 square -foot
industrial office building. The remodel will include: new parking spaces; exterior
modifications; skylights; interior partitions; and, the addition of a mezzanine area.
Design of the office remodel at 15771 Red Hill
Summary of Projects
September 15, 2015
Page 8
Avud Buoscuence (1i 4191 Aliylord Road)- A pharmaceutical manufacturer is
working on two (2) phases of tenant improvements to the office at the subject
location. The first phase, including a clean room and storage, is complete. They
are currently in plan check for build -out of the offices and labs.
aylback Burgers (1631 26nger Avenue): A new restaurant is proposed to
locate in the existing tenant space. Plans for tenant improvements are currently
in plan check, and the applicant has submitted a permit application for an ADC
license at the location.
Xpress Urgent Care (17612 17 Street)o Plans for tenant improvements are
currently in plan check for a new urgent care facility to locate in the existing
tenant space. Xpress Urgent Care is anticipated to open in Fall/Winter 2015.
New Creafuve Office (14201 & 14717 Franklin Avenue)- An application has
been submitted to remodel the existing industrial/laboratory building converting it
to creative offices at subject location. Plans for the interior and exterior
improvements, which includes improvement of the existing adjacent vacant
parcel into new parking lot, are under review by staff.
Grower's Direct Rowers (155 Wo Hrst Street): Construction is nearly complete
on a new mixed-use structure which has been proposed to open as a florist shop.
Grower's Direct is anticipated to finish construction of their building in the near
future.
Wokcano (3015 Lei Cams no I eat): Wokcano is a new sushi/fusion restaurant
which will be opening in The Market Place in December, adjacent to Jared
Jewelers. They are currently under construction, with the shell of the building
nearly complete.
Leaf N Cream (10489 Newport Avenue): A new tea,
yogurt shop recently opened in the Tustin Freeway Center
a* w
ice cream, and frozen
J1 Lao n Crew
INKto
Wokcano (left)
Leaf N Cream (right)
Summary of Projects
September 15, 2015
Page 9
Certificates of Appropriateness
ADDRESS
201-225 W. Main
DATE
APPROVED
4/10/15
PROJECT
Replace A/C Units on roof
RATING'
A
230 S. A Street
4/28/15
Replace and add 2 -story
deck
5131
455 Pacific Street
5/6/15
New A/C unit
Non -Contributing
305 W. Sixth Street
5/14/15
Second floor addition
Non -Contributing
365 EI Camino Real
5/18/15
Interior demo
5131
560 EI Camino Real
5/26/15
Wall Sign
C
230 S. Prospect
6/4/15
Reconstruct fire -damaged
residence
51D1
190 EI Camino Real
6/5/15
Re -roof
Non -Contributing
' Rating System for Certificates of Appropriateness:
A Obvious examples of historically significant architecture and structures that were significant in
local history.
B Unusual or distinctive buildings in terms of age and architecture.
C Pre -1940 buildings with much of the original architectural style.
D Pre -1940 buildings with substantial alteration or no significant architecture style.
5B1 Eligible for local listing only
5D1 Eligible for local listing only; contributor to District listed, or eligible under local ordinance
Non-contributing Buildings: Buildings that are located in the Cultural Resources District but do not
fall under any of the above categories.
Code Enforcement Updates
• Graffiti: The chart below displays the number of graffiti incidents from the prior three
(3) fiscal years, through the year-to-date.
Number of Graffiti Incidents - City of Tustin
500
450
400
350
300
250
200
150
100
50
0
�� e� �
�`p .0 �`p �`p Ja a
pc, �pJ� OeG� �a� dept
■FY 2012-2013
® FY 2013 - 2014
❑ FY 2014 - 2015
❑ FY 2015 - 2016
Summary of Projects
September 15, 2015
Page 10
Wager QuaRy:
National Pollutant Discharge Elimination System (NPDES) inspections are
separated into categories based on a business' use, and the intensity each use has
on water quality. The two (2) categories are industrial and commercial and are
separated into high, medium, and low priority. Each year, Code Enforcement
Officers conduct inspections based on the priority of a project.
o pndustHap NPDES pnspeeto®nso During the 2015-16 fiscal year, Code
Enforcement Officers are focusing on high and medium priority inspections.
They are anticipating completing 50 such inspections by the end of the fiscal
year.
o Commercc ap NPDES pnspeetu®nso This year, Code Enforcement Officers are
focusing on high and medium priority inspections, and are anticipating
completing 63 inspections for the current fiscal year.
The goal of the Water Quality Management Plan (WOIVIi P) is to develop and
implement practical programs and policies to minimize the effects of urbanization on
site hydrology, urban runoff flow rates or velocities, and pollutant loads. Developers
are required to submit a WQMP for any new development or significant
redevelopment which increases the impervious surface of a developed site. The
WQMP is required to include Best Management Practices (BMPs) for source control,
pollution prevention, and/or structural treatment BMPs.
o YMMP'so There are 118 properties that have a WOMP in place. Of those 118
properties, six (6) new WOIVIiP's are currently under review by staff.
Adrianne DiLeva-Johnson
Senior Management Assistant
Attachments:
Elizabeth A. Binsack
Community Development Director
A. Tustin Legacy Map and Project Table
B. Certificate of Appropriateness Documentation
ATTAC H M ENT Q
TUST 1 LEGACY MAP AND [PROJECT T TAB LL
IME
W
91 U121
S! low*
rso
no
ON ft me% M UMBWSiSQUjRE REG E
04
E
BUILT AND ENTITLED PROJECTS
'U S "I INII 11 c;a
A
17
18
Greenwood
Park
Victory Park
i's 19
x 17�
11
r
20 _-- _
LEGEND
Heritage School
Veterans Sports Park
_j ! !
1 3. ®C Social Services
21
1 4. Future City of Tustin
Facility
5. ®C Rescue Mission
o:,,. ATEP Campus (SOCCCD)
1
7. ®C Sheriff's Training
2
Center
1 0. Rancho Santiago College
District Sheriff's Training
' i'1
Facility
3a. Cornerstone I—
_
MQEFE TT---_
Business/Office/RSD, approx.
,� - (
1 860" 000sf
9b, Cornerstone 2
.1 � 23
Business/Office/R&D
1 10. Columbus Square -1,075
r
1 Residential Units
11. Fire Station # 37
12. Regency Center —
Shopping Center
®C Regional Park
X1
14. Future High School
u.leighborhood D`
_4 -
Communitv Core — 8_031
r A,
Residential Units &, 101iXed uses
16. Amalfi Apartments -53
' v
Residential Units
'.7 u\Ieighborhood C-3- — 514
Residential Units
1
L
Columbus Gmve -!R -
18. Standard Pacific Homes
375 Residential Units &
(City of mlm
Greenwood Park
19. Anton Legacy
Apartments — 225 affordable I
Residential Units & Victory Pork
-4 _j) '= The District —Shopping
Center
21. Tustin Field I — 376
Residential Units
DATE; 0 7.21 0 14
I' - 4 W
1
22. Tustin Field 11-189
Residential Units
0, 4W acs
23. Columbus Grove — 465
Residential Units
24. Tustin Legacy Park
1-----------_!
TU37HM LEGACY PROJECTS -UPDATED9-1-15
Map Project
Number
Heritage School
2 Veterans Sports Park
Description and Status
Heritage School is currently being utilized to serve the students of Hillview High and
Sycamore High School on an interim basis.
The Veterans Sports Park is a plan for a 31.5 -acre park which will serve the
recreational needs of the surrounding community. It will offer a wide variety of
facilities including lighted soccer fields, ballfields, tennis courts, basketball courts,
sand volleyball courts, and pickelball courts. A children's play environment, splash
pad, and picnic areas are also proposed, as well as a Veterans Memorial Plaza.
Design of the park is currently in progress, with bids for construction anticipated to be
released in Fall 2015.
3
OC Social Services
The Tustin Family Campus for Abused and Neglected Children involves a multi -
treatment campus which includes residential buildings and stand-alone homes, and
a campus service center with a total capacity to serve 90 beds for abused and
neglected children and their parents as well as emancipated youth. This project is
complete.
4
Future City of Tustin
Facility
The City of Tustin acquired this property through a recent land exchange with the
South Orange County Community College District. The future use of this building is
yet to be determined.
5
Orange County Rescue
Mission
The Village of Hope facility is a 192 -bed transitional home for the homeless which is
operated by the Orange County Rescue Mission. This project is complete.
6
ATEP Campus
The South Orange County Community College District has been approved for an
amendment to the MCAS Tustin Specific plan which will add educational private uses
supportive to the Educational Village in this area.
OC Sheriffs Training
Center
A future County of Orange Sheriff's Training Center is proposed in this location.
8
Rancho Santiago
College District Sheriffs
This Sheriff's Training Facility/Academy is now complete.
Training Facility
Clornerstone 1
An Exclusive Agreement to Negotiate with Lincoln Property Company for the
development of the area has been executed. The development proposeb includes a
variety of uses such as research and deveiopment, professional office. specsalizect
employment, retail, a food hall, and restaurant uses. Lincoir Property Companv is
currently working on a concept plan for this proiect,
9b Cornerstone 2
Phase two of the Cornerstone development will consist of a variety of uses including
research and development, office, and specialized employment uses.
10 Columbus Square
1,075 residential units are now comoieie within this neighborhood.
11 Fire Station #37
Orange County Fire Authority Station #37 moved from its old location off of Red Hill
Avenue to this new location at Edinger/Kensington Park Dr. The Fire Station is now
open.
12 Regency Center
The City Council has approved and Exclusive Agreement to Negotiate with
Regency Center for a commercial development at the site 1 C locates at the
southeast corner of Kensington Park Drive and Edinger Avenue. Regency renter
has submitted an application for the design and construction of the center. Thos
project was reviewed and approved by the Planning Commission and has beer
forwarded to the City Council for their consideration tentatively in October.
13 Orange County
Regional Park
The County of Orange has future plans for a 84.5 -acre regional park to be located
surrounding the North Hangar. A concept plan has been approved by the OC Board
of Supervisors . Please visit ocparks.com for further details on this proposed project.
14 Future High School
The master plan for the Tustin Legacy Area indicates that there are plans to estabiisr
a high school in the future at this location.
15 Neighborhood D
Community Core
This community core area is proposed to integrate a variety of activities including
living, working, shopping, and entertainment. It totals 262.3 acres and includes 891
dwelling units.
16 Amalfi Apartments
The Irvine Company has constructed a new apartment community consisting of 533
units adjacent to The District at Tustin Legacy.
17
Neighborhood G
This residential core consists of 251.8 acres with 58.1 acres of open space, 15 acres
of public/institutional uses, and a total of 614 residential units ranging from low to high
density as well as neighborhood commercial uses.
18
Greenwood in Tustin
Legacy & Greenwood
Standard Pacific was approved to begin development of 375 single family residential
Park
units. The model homes, park, and clubhouse have been completed, and
construction of the for -sale homes continues to progress.
19
Anton Legacy
Apartments & Victory
St. Anton Partners has completed construction of their 225 unit affordable
Park
apartments. Anton Legacy Apartments celebrated their grand opening on April 30,
2015, and residents have begun to move into the new community. Victory Park is
now open.
20
The District at Tustin
Legacy
This Class -A Retail Development project has been completed. The District at Tustin
Legacy offers a variety of retail services, restaurants, and entertainment venues.
21
Tustin Field 1
376 residential units are now complete.
22
Tustin Field II
189 residential units are now complete.
23
Columbus Grove
465 residential units are now complete.
24
Tustin Legacy Park
The City of Tustin is proposing to construct and maintain a 26 acre park and
stormwater detention basin. Design of the park is currently in progress, with bids for
construction anticipated to be released in Fall 2015.
ATTACHMENT o
CERTJFJCATE OF APPROPMATENESS DD OCUM NTATM
i � � j ( •j � � k � 1 • + �+� F'�9 'ky V � �:��1 •w" I'4 ��.� -.. F ..-b.w:.dw �7 I ` ' � j _ - _
I � � � ''� � , ' 1 11.11.::111 , 1 � -_•.
till.tom;
`k"
4.
14� 'r ) uatln
Ctxnmurnty .:klj •runt Do _ " rtt♦nt
catrh"ti
ti.vo.�a wotlr �
� � blp. �0tltCftttO(� SQM: i 1 Tr
1
j 1n a A Rol ordw4w40 N0. t QOf, ttM Conrnrwrly OMIpprlr�ry flOOtt+lOt010 rNr
nn0 A�MptgttN ttult
71» Woousu.t wJrk Cordontu to ** MwrNOM COOS and Mt d'IMOM O Ckmon
�trasrgs A aVc+�c+dl.
WO The Wuv. «iwA AoM not tdlws" aMtrct i►N ct%m IM 011M aRnct of
CPO/The"":wl C.4w71 F4*mmc4ov tlfn urOOMjW,
PrOX.&S1 rwrk it nan WdwA *Ah SNA&V iurrorrrdnp N IWM d
NpproPtu►tsrresfa of nrrtaiOis, scab. tial, trMpNt p�or+tr0 WW uM ci a j w
bv** p or suuclwo in 'worrlip to asiMMq buimpt &W sv ckw a titttl to
,..,,.... .. .�^^p;-::3 . 3• .'c y.... a, x tT; M .rr,,g. • . x; � v '3...-.. _ .>'�..
(A)ttttliunity Development Departmenti U'IS1 I t\l
_ TTuEs
CERTIFICATE OF APIPROPMATENEISS
AIPR11L. 28, 2015 x�
230 5 A STREET
BUILDING OUR FUTURE
HONORING OUR PAST
The project is for the construction of upper and lower level deck with stairs along the west
and south elevations of the house located at 230 S A Street. The project site is located
within the Cultural Resources Overlay District (CR) and the main house is listed on the
City's 1990 and 2003 Historic Resources Survey. The National Register of Historic Places
(NRHP) status code (5131) indicates that the structure, constructed in 1895, is a property
Recognized as Historically Significant by Local Government as follows:
Locally significant both individually (listed, eligible, or appears eligible) and as contributor
to a district that is locally listed, designated, determined eligible, or appears eligible
through survey evaluation.
The City of Tustin Historical Resources Survey (1990) described the site as follows:
This two-story house is significant as an example of the transition from the Victorian to the
Craftsman style in Tustin.
During the Craftsman Period, the house was remodeled, with wider double -hung windows
installed in the place of many of the original windows, a side porch added, the front porch
redesigned, and the piers, concrete steps and urns built. Although the house is no longer
Victorian in style, the Craftsman -style alterations appear to have been made more than
fifty years ago and are considered part of the historic fabric.
The building is also important because of its association with early Tustin residents. It is
believed that the house was built for George W Diffenderfer in 1895. Mr. Diffenderfer
owned the land and home from 1894-1904, as well as several different parcels in the
neighborhood. An 1897 photograph of the house shows that it originally had a large front
porch and a round turret, typical of the Victorian styles of the era.
The proposed deck would include replacing the existing rear deck and small side dec`<
with Trek engineered decking material (made of recycled materials :nciuding wood,
sawdust, and plastic packaging) and adding a connecting deck at the lower level in the
same material The existing bivo-level deck is located at the rear of the property aiong `,he
west elevation and serves the first and second story separately, There is a small deck on
ire socth side wi,h three steps leading to the yard. rye new deck will-eolace the existing
L.pper decd` and Wil be expanded at the ;ower deck to accommodate a rew stair way am
will extend along t► ie first 'evel sou4h e'evation to connect tine Nvo decks. The engineered
decking wit incicde three different color materials (top railing, border, ,end decr1) ail ire
r :_E, rent natural wood sh::ades. A color sarnp'e is attached hereto (a-L-tac,'-1men ).
i011 (.ul1CC[llllal WdV, TIISI111 �_ A' ��: i i 7/ I �i 1 1 4 i i% 3-.3 1 1 • �,� `,V.CUtiCI(1Cd.Of'
Certificate of Appropriateness
230 S A Street
April 28, 2015
The main residence will be painted in a muted green with darker green trim and off white
un the overhang. Windows will be painted in a dark brown semi -gloss with hints of red. A
color sample is attached hereto (attachment).
In accordance with TCC 9252h, the following required findings for construction can be
made as follows:
Construction of improvements in the CR District.
(a) The proposed work conforms to the Municipal Code and design standards
which may be established from time to time by the Historic Resources
Committee.
The proposed improvements conform to the Tustin City Code and any
applicable design standards in that the proposed project meets Zoning Code,
Building Code requirements, and Residential Design Guidelines (Permit #
B2015-0104).
(b) The proposed work does not adversely affect the character of the district or
Designated Cultural Resources within the district.
The proposed deck will replace the existing deck and be expanded at the first
level. The material will be consistent with the wood appearance of a natural
deck and the lower level deck will be minimally visible from 3rd Street. The
design is appropriate for the Craftsman style home.
(c) The proposed work is harmonious with existing surroundings. The extent of
harmony shall be evaluated in terms of appropriateness of materials, scale,
size, height, placement and use of a new building or structure in relationship to
existing buildings and structures and the surrounding setting.
The proposed deck will be constructed of quality materials which will maintain
the original color and stability over time. The height, setback and placement of
the decking is consistent with zoning and building code requirements. The
placement of the decking is appropriate in scale and relation to the existing
buildings.
The proposed work is hereby approved, subject to the following conditions:
Prior to the start of any work, the applicant shall obtain a building permit and pay all
applicable plan check and permit fees.
2. Prior to project final. field inspection shall be conducted to verify consistency with
the approved set of plans.
�rtific;ate of Appropi lateness
._1:30 S A Street
April 28, 2015
3. 'The property is zoned for Single Family Residential use. Any other use than Single
Family Residence shall be prohibited and the property owner shall ensure
compliance with all applicable zoning and building laws.
Elizabeth A. Binsack "
Community Development Director
El
- Nis. . '�`Y' . r" , � , F•1 ; _ l %
" '' t �t •R t � / - e t , ` "`,Y'r', S• ;C'r�''• ria ais+Fia a~q%� SL, �.. T�
l .r' L, a•!; ...ai�ll�•-nY4`:s. Rl.'dL Rri rr. .= w t. 4 .+i+
.y * 4 '►-":t 1M +,�'a'}tea,
' � . }`du o� „� ,.fit r;:>.: i�•��'
t s
- to , � 't' S •• i'�e4 � • '� "..�'
jt
X, *p .4 ": 1�4
0
o Vfr k..O(Y-n - 5L ss
.14PI, "IT
)ICIZ T, •-"' l
1*4
I
K
�01
jt
X, *p .4 ": 1�4
0
o Vfr k..O(Y-n - 5L ss
.14PI, "IT
)ICIZ T, •-"' l
1*4
I
K
DECKING & RAI LING
i 62
w l wrl
TRANSCEND DECKING
High performance
» Engineered with unrivaled fade, stain, scratch and
mold resistance
» Hassle -free maintenance takes the work out of the weekend
Perennial beauty
Pn.signed in a range of rich colors with a natural -looking
;rein pattern
» Available in two distinctive styles—premium tropical colors
and rich classic earth tones
» Pairs with Trex Transcend railing in coordinating colors,
plus Classic White and Charcoal Black
Trex through and through
» Made from 95% recycled materials
» Backed by the industry-leading Trex 25 -Year Limited
Residential Fade & Stain Warranty
TRANSCEND RAILING
High performance
» Stands firm with a strong, sturdy look and feel
» Built with the same incredible durability as Transcend
decking—won't rot, warp or splinter
Perennial beauty
» Modular components let you mix and match your
customized look with any Trex railing line
» Pairs perfectly with Transcend decking—also compatible
with any decking line
Trex through and through
» Ccntains a minimum of 40% recycled material
> P-_icked by the Trex 25 -Year Limited Resiraential `X-irranty
i
I;
! A.
TRANSCEND DECKING
High performance
» Engineered with unrivaled fade, stain, scratch and
mold resistance
» Hassle -free maintenance takes the work out of the weekend
Perennial beauty
Pn.signed in a range of rich colors with a natural -looking
;rein pattern
» Available in two distinctive styles—premium tropical colors
and rich classic earth tones
» Pairs with Trex Transcend railing in coordinating colors,
plus Classic White and Charcoal Black
Trex through and through
» Made from 95% recycled materials
» Backed by the industry-leading Trex 25 -Year Limited
Residential Fade & Stain Warranty
TRANSCEND RAILING
High performance
» Stands firm with a strong, sturdy look and feel
» Built with the same incredible durability as Transcend
decking—won't rot, warp or splinter
Perennial beauty
» Modular components let you mix and match your
customized look with any Trex railing line
» Pairs perfectly with Transcend decking—also compatible
with any decking line
Trex through and through
» Ccntains a minimum of 40% recycled material
> P-_icked by the Trex 25 -Year Limited Resiraential `X-irranty
230 A St
Chen -
.14",
00 A 5 -T Rr- E FE -T � -3,
See following pages for property information
State Of CahfOrrlla — The ResourcesAaency PTimaryr #
CEPARTMENT OF PARKS AND RECREATICM1 '
BUILDING, STRUCTURE, AND OBJECT RECORD
r�MVI 01 L
Bl- uric N23W
B2- Caeamaa.Nam -
B3- 0*" Use: Fa&kafi l
B3- Frit Use: Resi eoh&
*95- Arctub irtwal Styk-- '%rrttodm
*B6_ C firm lEtry: (Ccwbwam&tR lb=dcnj, ,md 3im af
The ivAkling was con=xted is 1895.
*.N -M Stagy cam: 5B
*Done Name or #(46): 2330 A ;mat (53)
*B7- M X No Eh"es Eluwmwn Date: Otkg ai IA rm iioo:
*B& Rd3lkd Features:
B91L ucuect unimawn b_ Buildei: tml-nawn
*BIOL Sigaii6cmce: Them RP -z lmW.,kdme=-e
Ami -T CA PesiW of Sigaebranoe:1870-1899 Fri Type: F.eddemtial
Appfirable Criteia: C
'rilms 4 in of bisyorxal or wtkmwkajl commit n dacfiaad by -lom paioA sod ppegaphic wepa Aho kidmi irs"o9v.;•. j
This two-itmy hawse is apt&art as an murople of the ummon fmmthe'Lrrctarin to the Cra.ftsmm -xryie m Tu=.
Dui; the C Pmod, the home way ru odeled, w1lb wuler doubk-hung wmdem imaged m dhe plate of manic of be acral
windows, a si& posrb added, the frit porch redesiimesd, ard d e pian, concrete sir, and um tnrtlt. Although the home is no longer Vjacmn
M MVL-- the CEafiMMl-Stile dtwhous apgem to Ewe L. -,m made more &m dfr,► }oars ado and me causidamd Bart of the baric bait_.
T bwldmg is also inpor= b ruse of its &B50cmam with eMY Tustin readents. It is bahm-ed did the house ms Wit for C*orge W.
in 15(-b. Nfr_ Diffindatu owned th,e11md and bmw from 1994-1904. as will. as metg diffa- at parcels in the r aghxabm& An
1897 pbatagraph of the Ewe shows that it adginany had a larp frm pmTh and a round =-et, tgpucal of the Vk-tmim stgks of the ea.
Large aM laws, a mriDaatute oranges grad, sad down cava die large yard.
B11. AAMOnal Resman AttnTraite )--S Fame Proyw •
*B12. Rdmmces: Cli�r qf Sty- e); ftrdeth street xrrhirw-ts, inc. 7wte 1 S'9!); Fist Aa aicaa True C F,ecotds. Check
references.
Slo. Rmarls
*BIAL Evahu1or: TEAW, C. 7ocd m
'Dxt* of Es3122tifoa.: Oct'2QU2
iTh is• space res � for of'i ci ai cornewfts . )
DPR 5 23 8 1 1 195)
ketch Ml Rwith north arrm required_)
-SE {k :r.'r.
Zia lu
4
U11IB F) STRF VT
3
'Required infonnation
TUST N CITY CODE ZONING `j,-152
rz
� ll. Amendment, revision ur deletion of a designation may be ;accomplished by following
the ahovc pruccdurus.
I' Cnrtificato or Appropriateness Required
A Certificate of Appropriateness shall be required prior to
(a) Alle ation of the exterior t'eatures of n building or site within a designated
Cultural Resource District, or alteration of a Designated Cultural RUSeUrCe, nr
construction of impruvuments within a designated Cultural Resources District,
requiring it City building permit.
(b) Demolition or renewal of any Designated Cultural Resource ur of anv imprt'vc-
ments in a Cultural Resom'ce District.
(c) A certitimte of appropriatune.ss shall not be required fur the following: III
ordinary m aint.en aim or repairs that do not, involve a change in design, catcrier
materinl at, original uppe:knowe of nn improvement, riot, (2) any construction,
reconstruc:t.ion, alteration or romuval of any t'uature which has been d0ol"'cd
by the Buildin;,l Oflkiel to he necassar'y to prutoct Lha public health or- sali;ty dui,
to an misnfu or dongm'oux amdit.iun pruvidnd the Building Official certifies such
action
tr; PiocudurefurCer-tifimtc of ApprupriaLcncss
' I. Application fur n Certificate ufApprupriatenesv Amll be made on forms provided by tilt'
ConununiLy Development DeparLnumt and shall contain whatever detailed inl'urut:r
tion (plans, drawings, agreements, photugrophs, etc.) ns is determined by the Com-
munity Development Department to be necessary fur the Department to act, on the
request. Whore thw proposed prgject requires ot,hor discretionary approvals such us n
tentative tract m:qa, the background information shall also be concurrently submitted
to the Depurtnicnt. on each of these applications.
2. Applications Gar Certificate of Appropriateness shall comply with the California
Environmental Quality Act (CECtAi.
t;rf;H.
a. The Community DnvOopmmtt Director, shall have the authority to approve, approve
with conditions, or deny Certificates ot'Appropriateness for improvements requiring a
City building permit.. In reviewing applications for a CertiticaLe of Appropriateness.
the Community Development Director may consult with ;and raceivo the advice and
recommendation of the Planning Commission, in their capacity as Ow Historic
Resource Cummitt(:a!, prior to rendering n decision, iOrd. No. 1429, Sec. I1.27, .5-21-I3;
1. Any person may uppcnl anv decision of the Director of Conunaanity Duvclopmcnt. ur
Planning; Commission in nccnrdanca, with Section 9294 of this Cade (Appeaki.
5. A Certificate ufAppropriateuess shill lapse and buconte void one i I ) yunr hallowing the
nate an which the cr:rti (icatc was approved unless the Conditions of the apprnv:d
specil.v a lesser at, grenter time or unless. print' to such expiration dao,, n huildin:(
N CITY CODE
ZONIN(;
9252
i Findings and Additional Permit Proculurvs for Demolition, Removal or Relocation or
Designated Structures or Structures Constructed Prior to 1940:
1., A Cwtificate of Apprupriateness fur the demolition of a Designated Cultural Resource
shall nut be approved unless the Community Development Director Or, nn appeal, the
Cit, Council finds that (ne, 11) Or more of the following conditions exist:
(a) The structure/Site is a hazard to public health or safety and repairs or sGrbiliza-
tion are not physically possible.
(b) The site is required fur a public use which will he Or more benefit to the public
than the Cultural Resource, and there is no feasible alternative location for the
public use.
(c) For a Designated Cultural RL'SOLINU only:
( 1) It is not feasible to preserve or restore Che structure, taking into consfder-
otion the economic feasibility of alternatives to the proposal.
(2) The proposed replacement structure does not, detract from the neighbor-
hood.
(d) Reconstruction or restoration is not. economically feasible or practical.
2. No person shall cant' out,r cause to be carried out any denuditinn, removal or
relocation of it Designated Cultural Resource or structure within a Cultural Resource
District built prior to 1940 without first receiving a demolition or relocation permit.
from tile, City. Such permit shall not he issued unless One of tit(! following events has
Occurred and in the case of a demolition the applicant has complied with i.3 below:
(a) A Certification of Appropriateness has been apprnvcd by the Community Dewd-
upnu;nt Dnwtor Or by the. City Council on appeal; or
rte,
(b) A period of 180 days has expired from the date or the Community Development
Director's denial urthe Certificate orAppropriateness, and there has been nu City
Council appeal.
tc) A period of 180 days has expired from the date of City Council denial or a
Certificate of Apprupriatoacs�.
3. In addition to the above requiroment, no demolition permit Or relocation permitshall
I)(, issued fur the demolition Or relocation of a Designated Cultural RCSOUT-CO or
structure within it Cultural Resource District built prior to 1940 WHO a Certiticnte of
Appropriatuness and City building permit has been issued Ibr a replacement structure
Or as otherwise approved Iry the Director of ('Ommunity I)uvulupmont_ i()rd. No. 1.129.
Set. 11.28, 5-21-1:;)
LIi-2b 4.5
Yri <rY?.> ;.�/i'/ "
J,�'6[e�lfvRy �zrq
-C--?ooL,A tF-R
7k7/l,/, C--
C201S-02_UIR
r
uS�eli% e
�'0�/�5 � Sc'2 L �Gg� v,�/ �l� �✓� ion/ V aA✓
Community Development Department
3
USTIN
CERTIFICATE OF APPROPRIATENESS
MAY 13, 2015
305 WEST SIXTH STREET
BUILDING OUR FUTURE
HONORING OUR PAST
PROPOSAL: The property is developed with an existing, single story "Non-
rated," single-family detached dwelling and detached two -car
garage with a second floor bonus room and is located in the
Cultural Resources Overlay District. The residence and garage
were built in 2000 and 1997, respectively. The second floor
bonus room was completed in 2011. The proposed project is a
second floor addition of 957 square feet with a balcony of 230
square feet above the existing residence and porch. The
proposed addition will be constructed to be compatible with the
existing residence in terms of exterior wall and roof materials,
windows, and exterior color.
In accordance with Ordinance No. 1001 which was adopted June 20, 1988, by the
Tustin City Council, the Community Development Director has the authority to
approve, approve with conditions, or deny Certificates of Appropriateness for
improvements requiring a City building permit for property located within a Cultural
Resource District. The structure is "Non -rated" per the Tustin Historical Resources
Survey.
The Community Development Department finds and determines as follows:
A. The proposed work conforms to the Municipal Code and any applicable
design standards in that the proposed project meets zoning code
requirements and would match the exterior colors and materials of the
existing residence.
B. The proposed work does not adversely affect the character of the District or
Designated Cultural Resources within the District in that: the existing
residence is "Non -rated;' and the proposed second floor addition is setback
at least 19 feet from the front of the existing residence, thereby maintaining
the character of the District.
C. The proposed work is harmonious with existing surroundings in that the
proposed project is a new addition that is proposed to match the existing
residence in terms of exterior materials and colors, and will not conflict with
the architectural style of other surrounding structures.
300 Centennial Way, (-uttin. CA 92780 0 P: (714) 573 3 100 • i=. I—I.II 573-;i I; • ww�.v.lustinca.urU
f4:
a
1#
Certificate of Appropriateness
305 W. Sixth Street
May 13, 2015
The proposed work is hereby approved, subject to the following conditions
1. Prior to the start of any work, the applicant shall obtain a building permit and
pay all applicable plan check and permit fees.
2. Any replacement or repair of any part of the existing structure shall match
the existing exterior materials, finish, and colors of the existing structure.
3. Prior to project final and occupancy, field inspection shall be conducted to
verify consistency with the approved set of plans.
Elizabeth A. Binsack
Community Development Director
S:\Cdd\Scott\Certificate of Appropriateness\CoA 305 W 6th St Second Floor Addition.doc
t
UWN
-IGN @ 75 LBS
SH
\LL
OVOOD
UPPORT
.L'TUBE WELDED
L PLATE
IN SCULPTURE
) 2" Sq. STL TUBE
1NECTION DETAIL
Cnnln — nn —
�erw•Ci � $ 20IN -dam �
Bl,u,k Marl L, 5t'�
Caieiicam ul Appmpriaten
ti
NWo..a VIoiK _JC�-
TlV pr.pa.W .on bvolv.. urPay.l..r. b YruCU/1(s)
.f
._
.r W.R'Mbe b m. CMp
W Tlean {IW«c.I Re.ax R.pw• Y 9.Iai1&V�
�l
H Y... SeudurNO Sryn'
Ranrq G W
b.00d0YCe WM Olenanc. W. 1001. al. Cprr.r.lhry
.r'.IWrri.^r D.puOn.r.IYYY
u�GC.IIrmM. Vul.
a7/ iM P.P.... woM caMarrAbN. N«icNC
stl MWNM Mwv
.1rdY 9 oppYa.pY.
J
:y TM PWawl.arY OOYM Wr+r..IYWM T.c
.Cr«d M. dYnt«
owan.w cdur n..auc.. wary ar m.v
�/ n„popo..a..rtn nueadw. wYr.d
«.dnw„wm.d
PER PLATE
•oaaad."'od rrw...m.m ,.p.. .
a�uno «.tr«fv. b rrtaue0.p b.r.r9
soft*4
Date:ZL I
Apprnven ay _
EEL PLATE
.L'TUBE WELDED
L PLATE
IN SCULPTURE
) 2" Sq. STL TUBE
1NECTION DETAIL
Cnnln — nn —
�erw•Ci � $ 20IN -dam �
Bl,u,k Marl L, 5t'�
Community Development Department
CERTIFICATE OF APPROPRIATENESS
JUNE 3, 2015
230 S PROSPECT AVENUE
TUSTIN
BUILDING OUR FUTURE
HONORING OUR PAST
The project is for the partial demolition of fire damaged areas and restoration of an existing
residential structure (rated 5D1) and detached single -car garage at 230 S. Prospect
Avenue. The project site is located within the Cultural Resources Overlay District (CR) and the
main house is listed on the City's 1990 and 2003 Historic Resources Survey. The National Register
of Historic Places (NRNP) status code (5D1) indicates that the structure, constructed in 1915, is not
eligible for National Register but of local interest because the resource:
Is a contributor to a fully documented district that is designated or eligible for designation as a local
historic district, overlay zone, or preservation area under an existing ordinance or procedure.
The City of Tustin Historical Resources Survey (1990) described the site as follows:
The single storied building, with a low pitched roof, front facing gable, is significant as an
example of the colonial revival style in Tustin.
The building's character defining features include, but are not limited to:
• Low pitched front facing gable
• Porch which extends the full length of the front fagade and has columns with railings and
balustrades
• Door and series of windows that are framed with wood trim and mouldings
• Narrow, horizontal siding
• Vent located above the symmetrically placed eaves of the front fagade
Consistent with the original structure, the architectural design of the proposed rebuild of the
residence is Late Colonial Revival and will include a low pitched roof and a front facing gable.
The existing porch with columns and railing with balustrades which extend the full length of the
front fagade will be repaired in kind. The existing horizontal narrow siding will be repaired and
reused where salvageable. The proposed colors are consistent with the existing residence in a
sage green color (Twig Basket 740D-5 Behr Premium Plus) with off-white trim.
In accordance with TCC 9252h, the following required findings for construction can be made as
follows:
That, in accordance with TCC 9252h Required Findings for Construction or Alteration, a
Certificate of Appropriateness is required prior to construction of improvements within a
designated Cultural Resources District requiring a City building permit. The required findings for
both the resource and district shall be made.
300 Centennial Way, Tustin, CA 92780 • P: (714) 573-3100 • h (714) 573-3113 • www.tustinca.om
1. Alteration of a designated cultural resource:
a) The proposed work will not detrimentally alter, destroy or adversely affect the
resource and, in the case of a structure, is compatible with the architectural style of
the existing structure.
The proposed reconstruction will not adversely affect the resource in that the
structures (residence and single -car garage) have been designed in the same Late
Colonial Revival architecture as the original residence and garage. Materials and
colors proposed for the structures are high quality and are consistent with the
existing residence. Therefore, the reconstruction will not adversely affect the
resource.
b) The proposed modification will retain the essential elements which make the
structure, site or feature culturally significant.
The proposed reconstruction will retain the essential elements which make the
structure culturally significant in that the fagade and front entry of the residence was
saved from the fire. These elements, including the low pitched roof and a front facing
gable, the existing porch with columns and railing with balustrades which extend the
full length of the front faoade will be repaired in kind. The existing horizontal narrow
siding will be repaired and reused where salvageable. Therefore the essential
elements will remain on the structure thereby preserving the cultural resource.
2. Construction of improvements in a Cultural Resource District.
a) The proposed work conforms to the Municipal Code and design standards which
may be established from time to time by the Historic Resource Committee.
The reconstruction conforms to the City's Cultural Resource District Residential
Design Guidelines. The following excerpts apply to the reconstruction of the
residence:
"Rehabilitation efforts should retain and restore original elements of the house. If
damage or deterioration is too severe, the element might be recreated using
materials which match the design, color, texture and other important design
features".
"Colonial Revival - Types of siding and all trim, windows, and other decorative
elements may be painted in a wide array of colors. Paint colors [for Colonial Revival
were] generally of a muted tone, not bright or bold, and are either light or dark, muted
medium tones were not used. Color combinations are generally light and dark, with
one on the main body of the building and the other on the trim."
As indicated in 9252h1a and b, the materials and colors proposed will be consistent
with the Late Colonial Revival architecture. The reuse and reconstruction utilizing
salvageable materials and matching the existing colors will further the consistency
with the Old Town area by incorporating the historic features back into the structures.
b) The proposed work does not adversely affect the character of the district or
Designated Cultural Resources within the district.
The proposed project is compatible with surrounding structures and uses within the
Old Town area. The existing fagade will be repaired and will retain the original
features including the existing porch with columns and railing with balustrades. The
reconstruction will be essentially the same as the original structure and will be
finished with the existing neutral green color on the residential structure and single -
car garage.
C) The proposed work is harmonious with existing surroundings. The extent of harmony
shall be evaluated in terms of appropriateness of materials, scale, size, height,
placement and use of a new building or structure in relationship to existing buildings
and structures and the surrounding setting.
The reconstructed residence and single -car garage will be substantially the same as
the original structure. The exception is:
• Addition of 6'8" by 18'2" to the rear (west) end of the house to accommodate
a master bedroom and bathroom and
• Minor expansion of the garage in order to accommodate an interior space of
10' x 20' and a popout for a washer and dryer. Therefore, the scale, size,
height, placement and use of the new buildings are compatible with the
surrounding setting.
The proposed project is hereby approved, subject to the following conditions:
The property owner and applicant signing and returning to the Community
Development Department the notarized Agreement to Conditions Imposed
form in accordance with Condition No. 1.4 of Exhibit A of ZAA 2013-008.
2. The Agreement with Conditions of Approval/Discretionary Permit Approval
form is required to be signed and notarized by the property owner, and
recorded with the Orange County Recorder's Office. Please submit a copy of
the recorded document to the Community Development Department.
Elizabeth A. Binsack
Community Development Director
PERMIT APPLICATION
CITY OF TUSTIN
COMMUNIFY DEVELOPMENT DEPARTMENT
714/573-3131 or 7141573-3132 FAX: 7141573.3129
PLAN 'CHECKER -Signa ure,.-(caciettn.s,
fc
Submlttaa C3OKfdr�.lss4iin4eiSubmiftak.�-;
PLAN CHLK4/ *-Plun Cheek will Lynire in 360,fays from vubmiltuldate—.
PROJECT ADDRESS I "I, c) F L � m VALUATION OF
**DESCRIBE WORK TO BE DONE
rv�
I
APPLICANT (contact) NAME:
PROPERTY OWNER: (required.)
I am the: Phone No.
Name DFoi rr-&;
Z1 Property Owner LI Architect
Q Contractor • Q Engineer
Addriss 1 'rz– LOA
Employee of the
DOwner El Contractor (venaciffon or "oier 6m, R',IiiMeir
Phon I e Numbieri 7111
Email Address
CONTRACTOR: Co. Name
Address M42.tj -,City
State License # I) Class t- ZA Exp. r
State/Zip, -L�n 'Acine It4
"SUB -CONTRACTOR: El YES,
Email Address' cc=
L' '-"',olie'nibeparrroeni
ARCHITECT: Co. Name
Address- City
7-
State Li�
P Phone #
Proms,ol Woo,
t Addre'ss
mail @
ENGINEE14 City
d Togn H ........ ..
State Regi fttAlthoti", Clast-_
/Zip Phone#
aall Address"
Room a Ri6h)Alteraticih 'Fq,
Linear feet of block wall (x) max. 6'-8" high
Garage D
Linear feet of retaining wall (x) max. 6'-8" high
llgftyfra'me Linear feet of wood fence (x) max. 6'--S" high
masonry sq.
Proposed Roofing Material r
Patio enclosure -Sq. ft.
ICC ER# of roofing
Patio cover sq. ft.
Roof area sq. ft,
Pool & Spa _sq. ft.
If 7.01bs. or overperrq. ff. plearseprovide stmcniralanaly5is by a xfflistemdengineer, Sign sq. ft.
Demolition sq. ft. Skylight_
sq. ft. Fire sprinklers
MM,,��Nl R
-R ULN.FLAUTTENANT, IjW7W
TTU33770 iv�
New Building Area _ sq. ft.
Grading area _sq. ft.
Tenant Improvement__ sq. ft. Occupancy Class Construction Type
Por ill waste ci Ilec tion hire or roll oI I hou,, it is mandator} it, ti,e CR& It Inc_ Cit -V" fr..n' hiki, 11:1 Wer. I I 110in ( tv A ide Section 4321 - I )rd. No. [3 25)
APPLICANT SIGNATURE: DATE: