Loading...
HomeMy WebLinkAboutRDA P.D. WEIGHT ROOM 02-22-94RDA NO. 3 2-22-94 I n t e r- C o m '-.~ S~~ DATE' TO: FROM: SUBJECT: FEBRUARY 22, 1994 WILLIAM A. HUSTON, CITY MANAGER' COMMUNITY DEVELOPMENT DEPARTMENT TUSTIN CIVIC CENTER - POLICE DEPARTMENT WEIGHT ROOM AWARD OF CONTRACT RECOMMENDATION'. .. It is recommended that the Redevelopment Agency take the following actions: Award the contract for the Police Department Weight Room to Irvine Engineering Corporation subject to final approval by the City Attorney. . Authorize a transfer of funds from Asset Forfeiture to the Capital Project Fund in an amount not to exceed the project budget. FISCAL IMPACT Based upon the lowest responsible bid, architectural fees, project management fees and a reasonable contingency, budget estimates for the project are as follows: A. Irvine Engineering Corp. $19,454.00 B. Architectural Fees, HNTB 6,220.00 C. Project Management, HNTB 6,517.50 D. Construction Contingency $ 4,000.00 Project Budget Total $36,191.50 .BACKGROUND The weight, room will be located in the northwest corner of the lower level of the Tustin Civic Center parking structure. It is intended for use by all City personnel. The enclosure utilizes approximately 870 square feet of the basement level of the parking structure, and occupies a corner area and two adjacent parking spaces. Adequate parking remains for all City vehicles and designated space for assigned spaces of Council and handicap requirements. city Council Report Police Department Weight Room Award of Bid Page 2 Two existing concrete walls, the existing upper deck, and the existing lower slab compromise most of the elements of the enclosure. Two new masonry walls complete the enclosure. Existing lighting and sprinkler systems within this area are upgrades as needed per code. Air conditioning, electrical outlets, fire alarm and telephone systems are also provided. The Police Department will provide already previously authorized athletic equipment and rubber floor mats when the enclosure is completed. Resolution No. 93-16 approving plans and specifications was adopted by the Agency on November 15, 1993. The project was advertised from November 18, 1993 through January 3, 1994 and the bid date was extended until January 24, 1994 due to a lack of response by contractors during the holidays. Bid results are attached for reference. Key Construction, whose bid was lowest, was rejected as being non-responsive due to the lack of a listing for a qualified fire sprinkler subcontractor as required by the contract documents. See attached letter for reference. Consequently, the lowest responsible bidder is Irvine Engineering Corporation. Staff has checked the license status, bid bond and references for the recommended contractor. The estimated schedule for completing the project is as follows: RDA contract award Notice to proceed Substantial Completion February 22, 1994 March 4, 1994 May 9, 1994 Edward Elowe Project Manager EE: br: CCREPORT. wt rmawd, ee Community Development Department · January 31, 1994 F LE GOPY City of Tustin 300 Centennial Way Tustin, CA 92680 Mr. Glen Heubner, Estimator Key Construction 2851 Rolling Hills, #210 Fullerton, Ca 92635 SUBJECT: TUSTIN POLICE DEPARTMENT WEIGHT ROOM NON-RESPONSIVE BID Director (714) 573-3106 Planning & Zoning Info. (714) 573-3140 Building (714) 573-3131 (714) 573-3132 Dear Mr. Glen: Housing (714) 573-3117 Per our discussions on 1-25-94 and today, it is mutually Code Enforcement agreed that your bid is considered non-responsive because (714)573-3134 of the lack of a listing for a qualified fire sprinkler BusinessUcense subcontractor as required in sheet G-i, paragraph 5. It (714)573-3144 is further mutually agreed that your bid is therefore rejected. Upon the advice of counsel, the City is Inspection Requests retUrning your bid bond. (714)573-3141 Sincerely, Edward Elowe Project Manager Graffiti Hot Line (714) 573-3111 FAX Machine (714) 573-3113 cc:Christine A. Shingleton Jim Rourke EE:br:heubner. ttr 0 0