HomeMy WebLinkAboutCC 9 SIDEWALK C&G RPR 01-17-94CONSENT CALENDAR NO. 9
.4-17-94
/'
·
DATE: JANUARY 17, 1994
· .
Inter-Com
TO'
FROM'
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SIDEWALK, CURB & GUTTER AND INTERLOCKING PAVER REPAIR PROJECTt
1993-94 FY
RECOMMENDATIONS:
For consideration by the City Council, at their meeting of January 17,
1994. It is recommended that the City Council adopt the attached
resolution approving the plans and specifications for subject project
and directing the City Clerk to advertise for bids.
FISCAL IMPACT:
The estimated cost of this project is $199,300.00 and has been budgeted
at $235,000.00. Of this budgeted amount, $28,200.00 is being used in
conjunction with Community Development Block Grant (CDBG) funds for
improvements to the Southwest Neighborhood. Additionally, $7,500.$6 has
been used to have various replacement areas surveyed to assure that the
proper replacement areas have been identified.
BACKGROUND:
Th~6 project consists of the removal and replacement of portland cement
cc~ncrete sidewalk and curb and gutter and the resetting of interlocking
concrete pavers. The majority of the areas of removal and replacement
have been caused by street tree roots or settling or water damage. The
project wilR also include the trimming and removing of damaging tree
r~ts.
A tentative schedule for this project is as follows:
Authorization to advertise for bids .................. January 17, 1994
First legal advertisement ............................ January 20, 1994
Second legal advertisement ........................... January 27, 1994
Bid opening .......................................... February 24, 1994
Award of Contract .................................... March 7, 1994
Robert S. Ledendecker
Director of Public Works/City Engineer
RSL: WEH: ccg: sc&gproj
Attachment
Wendy E~. Hallman
Junior Civil Engineer
1
2
3
4
5,
6
7
8
9
10
11
12
13
14
15
16:
17
18
19
20
21
24
26
27
28
RESOLUTION NO. 94-17
A RESOLUTION OF THE CITY COUNCIL OF THE CiTY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR
SIDEWALK, .CURB & GUTTER AND INTERLOCKING PAVER REPAIR
PROJECT 1993-94 FY
WHEREAS, it is the intention of the City Council of the
City of Tustin, California to contract for the construction of
and replacement of PCC sidewalk and curb ~ gutter and
interlocking pavers at various locations.
WHEREAS, the City Engineer has presented plans and
specifications for the construction of said work;
NOW, THEREFORE, BE IT RESOLVED that the plans and
specifications presented by the City Engineer be and a~
hereby approved as the plans and specifications for:
Sidewalk, Curb & Gutter and Interlocking Faver
Repair Project 1993-94 FY
BE IT FURTHER RESOLVED that the City Clerk is hereby
authorized and. directed to advertise as required by law for
the receipt and sealed bids for proposals for the doing of the
work specified in the aforesaid plans and spec±fications;
BE IT FURTHER RESOLVED that this project is categorically
exempt from the requirements of the California Environmental
Quality Act; Class I: Existing Facilities.
PASSED AND ADOPTED at a regular mee~inq of the City
Council of the City of Tustin held on the 17th day of January,
1994.
ATTEST:
Jim Potts, Zayor
city Cl~rk