Loading...
HomeMy WebLinkAboutCC 3 CLAIM #93-56 CONSENT CALENDAR NO. 3 1-3-94 inter-Corn .)ATE: DECEMBER 6, 1993 TO: HONORABLE MAYOR AND CITY COUNCIL FROM: CITY ATTORNEY SUBJECT: CLAIMANT= STEVEN REDPATH; CLAIM NO: 93-56; D/L: 11-03-93; DATE FILED W/CITY: 11-16-93; CARL WARREN FILE NO: 877968 PRL After investigation and review it' is recommended that the above-referenced claim be rejected and the City Clerk directed to give proper notice of the rejection to the claimant and to the claimant's attorney. JAMES.-ROURKE, City Attorney JGR~ab: 12~93(C~9356 ~a~ Enclosure: Copy of Claim cc: Carl Warren & Co. Finance Director City Manager City Clerk 300 Centennial Way Tustin, California 92680 November 12, 1993 Dear City of Tustin, ! am a bicycle commuter and ride from Boisa Chica in Huntington Beach to La Paz in Laguna Niguel. My commute brings me down Edinger and under the 55 freeway. On 3 November 1993 at approximately 5:30 PM i struck the railroad tracks just south of the 55 on Edinger. For the record I have included my journal entry for this ride. i incurred damages amounting to $173.92. Enclosed is the itemized receipt. The damage occurred while traveling southbound on the right edge of the traffic pattern. My wheel path was within those of automobile traffic. My speed was 25 miles per hour. In that this is a city street I ask to be reimbursed for the following expenses: New Front Tire: $29.95 New Front Tube: $16.25 tax: $3.58 Rebuild Front Wheel: tune up and clean: Space Over Rear Wheel: True Rear Wheel: 1 Set of Spokes: tax: $30.00 $65.OO $6.OO $7.OO $14.98 $1.16 Total reimbursement: $173.92 I thank you for'yb-'br time on this matter ahq"continue tO enjoy my commute through your city. Aside from those railroad tracks I find your city bicycle friendly. Steven F. Redpath Active member of the Orange County Bicycle Coalition 24231 Avenida de las Flores Laguna Niguel, California 92656-3522 CC: OCBC 630 Glassell Street, Suite 100 Orange, California 92666 SANDPIPER BICYCLE REPAIR 23:1 Seal Beach Blvd. SEAL BEACH, CALIFORNIA 90740 (310) 594-6z30 All cl~n~s and retur~ed goods MUST be 14049 · o Journal Entry: Bike: Date: Depart: Distance: Total Time: Maximum Speed: Moving Average Speed: Overall Average Speed: Tandem (Captain-Steven Redpath, Stoker-Judy Majeski) 3 November 1993 4:30 PM 27.36 miles 1:44 hours 37.5 mph 18.3 mph 15.8 mph Route: Conditions: Comments: (L) Bolsa, (R) Graham, (L) McFadden, (R) Fairview, (L) Edinger, (R) La Paz Daylight for half of the way with no construction. Moulton was backed up from the 405 to Lake Forest. We passed'the Santa Ana McDonnell Douglas facility and hit the railroad tracks south of the 55. The hi-cad battery for the front lights popped off along with the tail light. Both fell into pieces, Only the gasket for the taillight was never found. All parts were replaced and we were back on the road within 5.minutes. o Judy had a great time. The rear tire had a new latex tube and both tires held 120 psi. After the accident on the tracks, ! felt a thunk or flat spot on the front wheel. One spoke was completely loose. The bike is going in the shop this weekend. Riding up Moulton, just north of E! Toro, traffic ..................... ' was heavy and moderate. All cars slowed in our lane and merged left before passing us. Nobody even honked.