HomeMy WebLinkAbout07 AUTHORIZE BIDS FOR BASIN LANDSCAPING & WATER QUALITY INSTALL AND LEGACY LINEAR PARK IMPROVEMENTS• Agenda Item 7
AGENDA REPORT Reviewed /
City Manager
Finance Director pl
MEETING DATE: FEBRUARY 16, 2016
TO: JEFFREY C. PARKER, CITY MANAGER
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE
ADVERTISEMENT FOR BIDS FOR THE DETENTION BASIN
LANDSCAPING AND WATER QUALITY INSTALLATION (CIP NO. 50038)
AND TUSTIN LEGACY LINEAR PARK IMPROVEMENTS (CIP NO. 20077)
CONSTRUCTION PROJECT
SUMMARY
The plans and specifications for the Detention Basin Landscaping and Water Quality Installation
(CIP No. 50038) and Tustin Legacy Linear Park Improvements (CIP No. 20077) Construction
Project have been prepared and the project is ready to be bid.
RECOMMENDATION
It is recommended that the City Council:
1. Adopt Resolution No. 16-07 approving the plans and specifications for the Detention
Basin Landscaping and Water Quality Installation (CIP No. 50038) and Tustin Legacy
Linear Park Improvements (CIP No. 20077) Construction Project; and
2. Authorize the City Clerk to advertise to receive bids.
FISCAL IMPACT
Sufficient funds have been budgeted and appropriated in this Fiscal Year 2015-2017 Capital
Improvement Program for the project in the Detention Basin Landscaping and Water Quality
Installation (CIP No. 50038) and Tustin Legacy Linear Park Improvements (CIP No. 20077)
Construction Project. The engineer's estimate with contingency for the project is $8,900,000.
The project is funded through MCAS Land Proceeds and Backbone Infrastructure Fees and
OCTA Measure M-2 Environmental Cleanup Program Grant.
CORRELATION TO THE STRATEGIC PLAN
The Detention Basin Landscaping and Water Quality Installation and Tustin Legacy Linear Park
Improvements contribute to the fulfillment of the City's Strategic Plan Goal A: Economic and
Neighborhood Development. Specifically, the project implementation of Strategy 1, which
among other items, is to develop critical phases of Tustin Legacy.
DISCUSSION AND BACKGROUND
The detention basin project at the corner of Red Hill Avenue and Barranca Parkway consists of
landscaping, irrigation and water quality installation. This portion of detention basin project is
partially funded by OCTA Measure M-2 Environmental Cleanup Program grant. The linear park
from the detention basin to Armstrong Avenue improvements has been designed as a
pedestrian corridor with passive recreation areas. The project involves general clearing and
Plans and Specifications Approval for Basin Landscaping and Linear Park Improvements
February 16, 2016
Page 2
grubbing, grading, construction of trails and amphitheater, landscape improvements and
monument sign installation at the corner of Barranca Parkway and Red Hill Avenue.
The tentative schedule for construction of the project is as follows:
• Authorization to Advertise for Bids........................................................02/16/2016
• First Legal Advertisement.....................................................................03/10/2016
• Second Legal Advertisement................................................................03/17/2016
Bid Opening.........................................................................................04/19/2016
• Tentative Award of Contract.................................................................05/17/2016
• Tentative Start Construction................................................................07/11/2016
• Estimated Completion of Construction ..................................................05/01/2017
Stack, P.E.
Public Works/City Engineer
Attachment 1: Resolution No. 16-07
Attachment 2: Location Map
MC.11-016Co.,M11.V-16AlbWvwa Brea PN Roi.W77)ex
ATTACHMENT 1
Resolution No. 16-07
RESOLUTION NO. 16-07
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE
DETENTION BASIN LANDSCAPING AND WATER QUALITY INSTALLATION
(CIP NO. 50038) AND TUSTIN LEGACY LINEAR PARK IMPROVEMENTS (CIP
NO. 20077) CONSTRUCTION PROJECT AND AUTHORIZING
ADVERTISEMENT FOR BIDS
WHEREAS, it is the intention of the City Council of the City of Tustin, California to
contract for the Detention Basin Landscaping and Water Quality Installation (CIP No. 50038)
and Tustin Legacy Linear Park Improvements (CIP No. 20077) Construction Project, and
WHEREAS, the City Engineer has presented plans and specifications for the
construction of said work; and
WHEREAS, that on January 16, 2001, the City of Tustin certified the Program Final
Environmental Impact Statement/Environmental Impact Report (FEIS/EIR) for the reuse and
disposal of MCAS Tustin. On December 6, 2004, the City Council adopted Resolution No. 04-76
approving a Supplement to the FEIS/EIR for the extension of Tustin ranch Road between Walnut
Avenue and future alignment of Valencia North Loop Road. On April 3, 2006, the City Council
adopted Resolution No. 06-43 approving an Addendum to the FEIS/EIR. The FEIS/EIR along with
its Addendums and Supplement is a program EIR under the California Environmental Quality Act
(CEQA). The FEIS/EIR, Addendum and Supplement considered the potential environmental
impacts associated with development on the former Marine Corps Air Station, Tustin; and
WHEREAS, an environmental checklist was prepared for the proposed project that
concluded no additional environmental impacts would occur from approval of the project. The
Environmental Analysis Checklist concludes that it can be seen with certainty that there is no
possibility that the activity in question may have a significant effect on the environment because
all potentially significant effects 1) have been analyzed adequately in an earlier EIR pursuant to
applicable standards, and 2) have been avoided or mitigated pursuant to that earlier EIR,
including revisions or mitigation measures that are imposed upon the proposed project; and
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by
the City Engineer are hereby approved as the plans and specifications for:
Detention Basin Landscaping and Water Quality Installation (CIP No. 50038) and
Tustin Legacy Linear Park Improvements (CIP No. 20077) Construction Project
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to
advertise as required by law for the receipt of sealed bids or proposals for the performance of
the work specified in the aforesaid plans and specifications;
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 16th day of February 2016.
JOHN NIELSEN
Mayor
ATTEST:
ERICA N. RABE
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Rabe, City Clerk and ex -officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council is five;
that the above and foregoing Resolution No. 16-07 was duly and regularly passed and adopted
at a regular meeting of the City Council held on the 16th day of February 2016 by the following
vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
ERICA N. RABE
City Clerk
ATTACHMENT 2
Location Map
LOCATION MAP
Tustin Legacy Linear Park
Grading Project from
Barranca Pkwy/Red Hill Ave
to Armstrong Ave
NSTN
RANCH
menx ¢o�Gr
PROJECT LOCATION
Tustin Legacy Linear Park
Grading Project from
Barranca Parkway / Red Hill
Avenue to Armstrong Avenue
(CIP No. 20077)
PROJECT
LOCATION
Vll£:
Tulin
Legacy Linear
Parts Grading Pro}cLErq
PROJECT
LOCATION