Loading...
HomeMy WebLinkAboutRPT 5 RD RECONSTRUC 05-06-91L ^� r•..•' + ^~ti, r' REPORTS NO. 5 1+ 5-6-91 NL Inter - Corp ATE:,�.�.... MAY 11 1991 TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: STATUS REPORT -EL CAMINO REAL RECONSTRUCTION AND WIDENING RECOMMENDATION Receive and File. BACKGROUND Caltrans as a part of the Santa Ana (1-5) freeway widening is in the process of relocating, reconstructing and widening E1 Camino Real between Orange Street and Red Hill Avenue. - Additionally as.a part. of the freeway widening project, Caltrans has acquired additional properties easterly and adjacent to the Tustin High School parking lot to provide for a replacement of land acquired by Caltrans for the relocation of E1 Caininb Real. Caltrans has informed the City that this additional land will be cleared of existing buildings and made available to the school district on or about July 151 1991. It is our further understanding that the school district will commence construction on their parking lot reconstruction on or about mid July, 1991. DISCUSSION E1 Camino Real in its completed status will function as a secondary arterial highway within an eighty foot wide right-of-way and a distance between curbs of sixty four feet. Ultimate pavement markings will provide for four travel lanes (2 each direction) and a continuous twelve foot protected left turn lane. All on -street parking along both sides of E1 Camino Real between Orange Street and Red Hill Avenue will be prohibited. This traffic channelization and prohibition of parking will provide the maximum amount of traffic safety to the school district and the community. In the interim during the construction of the Tustin High School parking lot, E1 Camino Real between Orange Street and Red Hill Avenue will be marked for one travel lane in the westbound direction, and on -street parking will be allowed on the north side of the street adjacent to Tustin High School. Once the school parking lot has been completed, the ultimate pavement markings will be placed and the on -street parking adjacent to the school will be removed. It is anticipated that this should occur sometime in September -October of 1991. The southerly side travel lane in the Caltrans contractor construction from E1 ,f E1 Camino Real will also function as one eastbound direction until such time as the no longer requires access to the freeway Camino Real. _ This is an information only memo and no City Council action except for receive and file is required. Bob Ledendecker Director of Public Works/City Engineer RSL:lmh:camino