HomeMy WebLinkAboutCC 11 WTR MAIN IMPROV 04-15-91N
k..�--: ' i? t .. «......�. _. ...�..+
NTE: APRIL 10, 1991
TO: WILLIAM A. HUSTON, CITY MANAGER
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
CO'PLENDAR N0. 11
4-P5-91
SUBJECT: AUTHORIZATION TO ADVERTISE FOR BIDS - NISSON ROADWAY
IMPROVEMENTS AND NISSON ROAD WATER MAIN IMPROVEMENTS
RECOMMENDATION:
That the Tustin City Council pass and adopt the attached Resolution
No. 91-52 approving plans and specifications for the Nisson Roadway
improvements and water main improvements between Newport Avenue and
Red Hill Avenue, and authorize the removal and replacement of
twelve trees along the southerly side of Nisson Road.
BACKGROUND:
The subject project consists of reconstruction of the certain
failed portions of the roadway and the placement of an asphaltic
concrete overlay on the entire surface of Nisson Road between
Newport Avenue and Red Hill Avenue.
As a supplement to this project, Caltrans will be constructing curb
and gutter on the northerly side of Nisson Road between Newport
Avenue and approximately 250 feet easterly of Utt Drive. This
work, along with the City's proposed work, will provide a fully
improved street.
The City's project will be funded as follows:
SB -140 Gas Tax Monies . . . . . . . . . . $10,300.00
General Fund Monies . . . . . . . . . . . 931000.00 -
and must have a construction contract awarded by June 30, 1991.
These funds have been budgeted within the 1990-91 Capital
Improvement Program Budget.
In addition to the previously mentioned roadway construction, staff
is including the Nisson Road water main replacement between Newport
Avneue and Red Hill Avenue within the subject contract. This water
main replacement has also been budgeted in the amount of
$160,500.00 in the 1990-91 Water Capital Improvement Program.
DISCUSSION:
With the Nisson Road improvements, staff is recommending that
twelve existing pine trees along the southerly side of Nisson Road
be removed and replaced with an acceptable species of trees that
are conducive of parkway growth. The majority of these trees are
currently impacting the roadway as follows:
1. Trees have outgrown the tree well size in which they were
planted in the early 19601s.
2. Tree roots are raising the sidewalks, curb and gutter and
street paving, and are impacting street drainage and
pedestrian safety.
3. Trees have been forced to grow in a northerly direction
resulting on encroachment within the travel roadway.
This encroachment could result in damage to vehicles
traveling adjacent to the curb.
4. Trees adjacent to the intersecting streets block
visibility of motorists attempting to gain access to
Nisson Road.
A map delineating these trees is attached for the City Council's
information.
The following is a tentative schedule for the subject project:
City Council Authorization to Advertise Bids
First Legal Advertisement . . . . . . . . .
Second Legal Advertisement . . . . . . . . .
OpenBids . . . . . . . . . . . . . . . . .
Award Bid . . . . . . . . . . . . . . . . .
Commence Construction . . . . . . . . . . .
Complete Construction . . . . . . . . . . .
i_
Robert S. Ledendecker
Director of Public Works/
City Engineer
RSL:lmh:nisson
4-15-91
. 5-9-91
5-16-91
6-29-91
6-3-91
6-24-91
10-24-91
i
2
3
4
5
6
7
8
9
10
1]
12
13
14
15'.
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 91-52
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR
ASPHALT CONCRETE REHABILITATION AND OVERLAY PROJECT, AND
WATER MAIN REPLACEMENT ALONG NISSON ROAD BETWEEN NEWPORT
AVENUE AND RED HILL AVENUE, AND AUTHORIZING ADVERTISEMENT
OF BIDS
WHEREAS, it is the intention of the City Council of the City
of Tustin, California, to contract for asphalt concrete
rehabilitation and overlay project and water main replacement along
Nisson Road between Newport Avenue and Red Hill Avenue, and
authorizing advertisement of bids; and
WHEREAS, the City Engineer has presented plans
specifications for the construction of said work;
and
NOW, THEREFORE, BE IT RESOLVED that the plans and
specifications presented by the City Engineer be and are hereby
approved as the plans and specifications for:
Asphalt Concrete Rehabilitation and Overlay Project
and
Water Main Replacement Along Nisson Road
Between Newport Avenue and Red Hill Avenue
BE IT FURTHER RESOLVED that the City Clerk is hereby
authorized and directed to advertise as required by law for the
receipt of sealed bids or proposals for the doing of the work
specified in the aforesaid plans and specification;
BE IT FURTHER RESOLVED that this project is categorically
exempt from the requirements of the California Environmental
Quality Act; Class I: Existing Facilities
PASSED AND ADOPTED at a regular meeting of the City Council of
the City of Tustin, California, on the 15th day of April, 1991.
(Attest:
Mary E. Wynn, City Clerk
Richard B. Edgar, Mayor
402- 37
o
a�o
m
00'
4C
OOo
° 0i11 m
h
.p X 4
h O
N I
o Q
iG4.92 iii • 97- as• ., -�
c �
v PAR. ! a > m
25 24
BLK. // MP. M. 24 -7
' Q M D
P. AM 29-11 Q < O
5 6 7
POR. LOT 33 m
1fl �j
19 18 l7 l6 v � t�
/7S. 77 LL
PLACE-
4C
LACE4C
So "
a
C^ O O O O J N
4� 32 �v
. • 99.30 • i � �
klN -7
G6 70'
t
2/ l3
31 CK
11 10 90 o O 7
0
12 sui
3 (
r \
LANE h 2s
W Il Q
� Y O Z
J
Q 29 h 27 cn C
10 v Z
O O O O h i
so - ANO. /863 "
S 24 23 26610' 99.30' 2E
7 7o' 8 9 74.56• /O // 83.iG' 50.
W J -
I
�� 0
.So R 0
i3 69.60' S9. iS' 20 9 949 /6
/H VINE SUB. o
DEL AMO AVENUE �
TRACT NO. !8E
PARCEL MAP 67' J
p.z7
7o OS O9
nio 'co
J I \
Ell
w
w CC
Z
~
J �
p
ti W
Z0
Za
a
Q V
Gam.
WQ
LU
wa
oc
V
w
Z
U
p_
�3
a
co�
W§
xJ
W
Z
W
(--
OU
Q
O�
w
Ma
iw
O
w w
w tr
ac
G
8
U
w
w Z
cc w
(" J w
J w
z4 oa
Qcr QU
aw n'
f..� H� w
ZU ZI=_— J
0� n.
w ui -i 2
w
>� 3 w
0 >
a mw O
ww w cc cc
w ¢t- a
0 G 0
40