Loading...
HomeMy WebLinkAbout08 APPROVE THE ANNUAL MEASURE M2 ELIGIBILTY SUBMITTAL PACKAGE, FY 2016-2017• Agenda Item AGENDA REPORT Reviewed: City Manager Finance Director MEETING DATE: JUNE 21, 2016 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVE THE ANNUAL MEASURE M2 ELIGIBILITY SUBMITTAL PACKAGE, FISCAL YEAR 2016-2017 SUMMARY In order to maintain eligibility for funding under the Orange County Measure M2 Program, the City is required to annually submit a compliance package to the Orange County Transportation Authority (OCTA). RECOMMENDATION It is recommended that the City Council take the following actions: Adopt the attached draft Measure M2 Seven -Year Capital Improvement Program (Fiscal Year 2016-2017 through Fiscal Year 2022-2023); and 2. Authorize the Director of Public Works/City Engineer to submit the City of Tustin's Measure M2 eligibility package to OCTA. FISCAL IMPACT Presently, the City has secured $23,071,002 in Comprehensive Transportation Funding Programs (CTFP) competitive funds under the current Measure M2 Program. In addition, the City's annual local jurisdiction apportionment, known as "Fair Share" under Measure M2, is estimated at $1,540,000 for Fiscal Year 2016-2017. BACKGROUND AND DISCUSSION Since the inception of Measure M in 1991, the City has submitted annual documentation to the OCTA in order to maintain eligibility for competitive and local turnback funding. In November 2006, the voters of Orange County approved Renewed Measure M (M2), a 30 -year extension of the original 20 -year Measure M program which had established a one-half (1/2) cent sales tax for local and regional transportation improvements throughout Orange County. Taking effect on April 1, 2011, the Measure M2 program provides for a new slate of projects and planned programs. These include improvements to the Orange County freeway system and road network, expansion of the Metrolink system, more transit services for seniors and the disabled, funding for the cleanup of roadway storm water runoff, and funding for local traffic signal synchronization programs. Competitive funding is provided through the Comprehensive Transportation Funding Programs (CTFP) component of Measure M2. Local Turnback/Fair Share and CTFP funds have enabled the Annual Measure M2 Eligibility Submittal June 21, 2016 Page 2 City to undertake significant capital projects that improve the transportation and circulation system in Tustin. This year's eligibility package includes the following: • Draft copy (attached) of the City's Seven -Year Capital Improvement Program (CIP) Budget, beginning with FY 2016/17, as it relates to Measure M2 funding. The CIP is presented in the required OCTA format. The finalized seven-year CIP will be forwarded to OCTA when the budget is adopted by the City Council. • Maintenance of Effort (MOE) Reporting Form • Measure M2 Eligibility Checklist • Arterial Highway Plan of City's Circulation Element • Arterial Highway Mileage Change Report • TCA Major Thoroughfare and Bridge Fee Program Rates Transit — Non -Motorized Planning Strategies Letter These items demonstrate to OCTA that Tustin has been and will continue to fulfill its responsibility to implement the requirements of Measure M2. Moreover, compliance with the requirements of Measure M2 will ensure the City's continued eligibility for the various Fair Share and competitive program funds. ou I . Stack, P.E. Dir ctr f Public Works/City Engineer Attachment 1: Draft Seven -Year CIP (OCTA Format) S:\City Council Items\2016 Council Items\06-21-20MApprove M2 Eligibility Package\Approve Annual M2 Eligibility Submittal for FY 2016- 17.docx 6/14/2016 Measure M 1 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Annual Roadway and Public Infrastructure in Maintenance Proaram 2015-16170015 - MOEI Project Limits: Citywide various locations Project Number: N/A Type of work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Annual maintenance of roadways, public alleys, $0 public infrastructure, at various citywide locations, $100,000 including pavement crack sealing, slurry seal, AC R overlay; sidewalk repairs; signing and striping. $0 Maintain and update City's PMP and prepare grants. NOTES Gas Tax 16.74 $400,000 $400,000 E and C phases, includes $100k E -phase C( from prior yr General Fund 51.26 $1,225,000 $1,225,000 GF-CIP, C Phase M2 Fairshare 32.01 $765,000 $765,000 C phase $2,390,000 $2,390,000 Proiect Phase Tustin Project Name: 18/19 in 20/21 zq&_ 22/23 Estimated Cost Proiected Cost E $100,000 $0 $0 $0 $0 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,290,000 $0 $0 $0 $0 $0 $0 $2,290,000 $2,290,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,390,000 $0 $0 $0 $0 $0 $0 $2,390,000 $ 2,390,000 Agency: Tustin Project Name: Annual Roadway and Public Infrastructure $500,000 Maintenance Program 2016-17170016 - MOEI Project Limits: Citywide various locations Project Number: N/A Type of work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: City wide maintenance of roadways, public alleys $0 and public infrastructure including pavement $270,000 rehabilitation, sidewalk repairs, signing and striping; R maintain and update City's PMP and transportation $0 project grants. PERCENT ESTIMATED CO N Gas Tax 19.53 $500,000 $509,840 General Fund 47.85 $1,225,000 $1,249,108 M2 Fairshare 32.62 $835,000 $851,433 $0 $2,560,000 $2,610,380 Proiect Phase 18/19 1t 20/21 22/23 Estimated Cost Proiected Cost E $270,000 $0 $0 $0 , $0 $0 $0 $270,000 $270,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $2,290,000 $0 $0 $0 $0 $0 $2,290,000 $2,340,380 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $270,000 $2,290,000 $0 $0 $0 $0 $0 $2,560,000 $ 2,610,380 6/14/2016 Measure M 2 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Armstrong Avenue Extension: Warner Avenue to NOTES Barranca Pkwv ICIP No. 702011 Project Limits: Armstrong Avenue from Warner Avenue to Barranca $0 Parkway Project Number: N/A Type of work (TOW): New Facility TOWDescription: New 4 lane roadway between project limits Project Description: Design and construction of extension ofAmnstrong $0 Avenue including drainage improvements, traffic Other signal installation, median landscaping and utility $0 installation. FUND NAME Tustin Project Name: 18/19 NOTES Developer 0.00 $0 $0 Past year Expenditures Other 0.00 $0 $0 CFD 06-1, MCAS TAB, Street Lighting, IRW $0 $0 $0 $0 - past yrs Other 0.00 $0 $0 MCAS Land funds- past yrs Expenditures Other 100.00 $1,000,000 $1,000,000 MCAS Fee - 1,000,000- CO from prior yr C/I $1,000,000 $1,000,000 $1,000,000 $0 Proiect Phase Tustin Project Name: 18/19 19/20 20/21INEF'"M Project Limits: 22/23 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 $1,000,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 $ 1,000,000 Agency: Tustin Project Name: Aston Street Extension between Barranca Pkwy & Tustin Leaacv Linear Park 1702291 Project Limits: Aston Street between Barranca Pkwy and Tustin Estimated Cost Leaacv Linear Park Project Number: N/A Type of work (TOW): New Facility TOWDescription: New 4 lane roadway between project limits Project Description: Design and construction of Aston St ext., drainage improvements, traffic signal, medians UND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES Cher 100.00 $2,200,000 $2,200,000 Community Facilities District - CFD 14-1 funds $2,200,000 $2,200,000 Proiect Phase 18/19 20/21 22/23 Estimated Cost Proiected Cost E $200,000 $0 $0 $0 , $0 $0 $0 $200,000 $200,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,000,000 $0 $0 $0 $0 $0 $0 $2,000,000 $2,000,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,200,000 $0 $0 $0 $0 $0 $0 $2,200,000 $ 2,200,000 6/14/2016 Agency: Tustin Project Name: Browning Avenue Rehabilitation between EI Camino 19/20 Rd and Irvine Blvd Project Limits: Browning Avenue between EI Camino Real and Irvine Estimated Cost Boulevard Project Number: N/A Type of work (TOW): Road Maintenance TOwoescription: Rehabilitation of roadway Project Description: Removal and deep lift repairs of asphalt concrete $100,000 pavement failure areas, cold plane, construction of R asphalt concrete resurfacing, traffic loops, and $0 traffic striping. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 FUND NAME NOTES Unfunded 100.00 $600,000 $622,242 Uncertain Funding $600,000 $622,242 Proiect Phase PERCENT Agency: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $0 $100,000 $0 $0 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $500,000 $0 $0 $0 $0 $500,000 $522,242 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $600,000 $ 622,242 FUND NAME PERCENT Agency: Tustin Project Name: Citywide Installation of Catch Basin B M P s Phase 4 0.00 ICIP No. 500361 Project Limits: Various locations - Citywide Project Number: 15-TUST-ECP-3771 Type of work (TOW): Environmental Cleanup TOwoescription: Automatic Retractable Screen and other debris $0 screens or inserts Project Description: Installation of catch basin filters and/or automatic R retractable catch basin screens at various citywide $0 locations. FUND NAME PERCENT ESTI MA 18/19 NW M2 ECP Tier 1 0.00 $0 $0 $119,018- ECP funds in FY 2015/16 M2 Fairshare 0.00 $0 $0 City match budgeted in FY 2015/16 $0 $0 $0 $0 $0 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost _ E $0 $0 $0 , $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 3 6/14/2016 Measure M 4 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Citywide Pedestrian Oriented Accessibility A Improvement Proaram Project Limits: Citywide Project Number: N/A Type of Work (TOW): Pedestrian TOWDescription: Reconstruction or rehabilitation of sidewalk Project Description: Reconstruction of pedestrian infrastructure and $50,000 installation of equipment to make pedestrian travel $400,000 more accessible to persons with disabilities. FUND NAM=211VPERCENT ESTIMATED COST PROJECTED COST NOTES General Fund 100.00 $2,600,000 $2,743,795 GF and/or M2 $2,600,000 $2,743,795 Proiect Phase Tustin Project Name: 18/19 A 20? /21 Project Limits: Corner of Red Hill Avenue and Barmnca Parkway Estimated Cost Proiected Cost — E $100,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $400,000 $400,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $400,000 $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $2,200,000 $2,343,795 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $350,000 $350,000 $350,000 $350,000 $350,000 $350,000 $2,600,000 $ 2,743,795 Agency: Tustin Project Name: Detention Basin Landscaping and Water Quality A Installation 1500381 Project Limits: Corner of Red Hill Avenue and Barmnca Parkway Project Number: 13-TUST-ECP-3681 Type of Work (TOW): Environmental Cleanup TOWDescription: Other Project Description: Detention basin landscaping, irrigation and installation $0 of water quality BM P's. N Other 0.00 $0 $0 City match MCAS Fee —$600k C Phase - C( from FY 15/16 M2 ECP Tier II 0.00 $0 $0 M2 ECP Tier 2 $824,687.50 - CO from FY 2015/16 $0 $0 Proiect Phase 18/19 A 20/21 Estimated Cost Proiected Cost _ E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/14/2016 Measure M 5 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Edinger Avenue Rehabilitation between Jamboree AEL Road and Harvard Avenue Project Limits: Between Jamboree Road and Harvard Avenue Project Number: N/A Type ofworic (Tow): Road Maintenance Towoescription: Rehabilitation of roadway Project Description: Removal and deep lift repairs of AC pavement failure $0 areas, repair of sidewalk and C & G, ramps $50,000 reconstruction, cold plane, construction of AC R resurfacing, traffic loops and traffic striping FUND NAME NOTES Unfunded 100.00 $500,000 $530,358 Uncertain Funding $500,000 $530,358 Proiect Phase Tustin Project Name: 18/19 AEL 20? /21 21? /22 Edinger Av/Irvine Center Dr between Newport Av in Estimated Cost Proiected Cost - E $0 $0 $0 $50,000 $0 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $450,000 $0 $0 $0 $450,000 $480,358 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $0 $500,000 $ 530,358 Agency: Tustin Project Name: Edinger Avenue/Irvine Center Drive Traffic Signal N Svnchronization Proiect Project Limits: Edinger Av/Irvine Center Dr between Newport Av in $116,648 Tustin & Protocol St in Irvine Project Number: 16-IRWN-TSP-3791 Type of work (Tow): Traffic Signals Towoescription: Coordinate signals within project limits Project Description: Traffic studies, install new signal equipment and $0 implement new timing to synchronize signals on Another Agency Edinger Av/Irvine Center Dr. City contribution of 20% $339,352 to Regional TSSP project managed by City of Irvine. FUND NAME PERCENT E 18/19 N M2 Fairshare 5.12 $116,648 $116,648 City of Tustin Share of 20% match M2 TSSP 80.00 $1,824,000 $1,824,000 Irvine -Lead Agency, $466,592 in TSSP for $0 $0 $0 $0 Tustin Segment Another Agency 14.88 $339,352 $339,352 City of Irvine (Lead Agency) - Project $0 $0 $0 $0 Contribution C/I $2,143,200 $2,280,000 $2,280,000 $0 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost E $0 $0 $0 , $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,143,200 $0 $0 $0 $0 $0 $0 $2,143,200 $2,143,200 O&M $0 $136,800 $0 $0 $0 $0 $0 $136,800 $136,800 $2,143,200 $136,800 $0 $0 $0 $0 $0 $2,280,000 $ 2,280,000 6/14/2016 Measure M 6 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: EI Camino Real/Jamboree Rd Intersection $23,706 Improvements Project Limits: EI Camino Real and Jamboree Road Intersection Project Number: 16-TUST-ICE-3819 Type of Work (TOW): Intersection TOWDescription: Add left turn lane(s) to intersection Project Description: Intersection improvements to add second Eastbound $0 left -tum extension FUND NAME PERCENT NOTES General Fund 25.00 $23,234 $23,706 City match GF+Xtra Work —45k [GF and/or 21/22 22/23 M2 Fair Share] M2 ICE 75.00 $69,703 $71,119 $7,149 $92,937 $94,824 $0 Proiect Phase PERCENT Agency: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $7,149 $0 $0 $0 $0 $0 $0 $7,149 $7,149 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $85,788 $0 $0 $0 $0 $0 $85,788 $87,675 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $7,149 $85,788 $0 $0 $0 $0 $0 $92,937 $ 94,824 FUND NAME PERCENT Agency: Tustin Project Name: First Street/Bolsa Avenue Signal Synchronization 100.00 Proiect ICIP 400821 Project Limits: First Street within City limits Project Number: N/A Type of Work (TOW): Traffic Signals TOWDescription: Interconnect traffic signals to improve coordination $0 and communication Project Description: Provide studies, install new signal equipment and R implement new timing to enhance signal $0 synchronization. City contributing towards 20% $0 local match to other lead agency cities. FUND NAME PERCENT ESTIMA 18/19 NOTES M2 Fairshare 100.00 $0 $0 $13,080 M2 FS - CO from prioryrs E $0 $0 $0 , $0 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost ■ E $0 $0 $0 , $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/14/2016 Measure M 7 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Jamboree Rd, Warner Av and Tustin Av Signal 19/20 Svn ch ron ization Proiects (CIP 40081) Project Limits: Jamboree Road, Warner Avenue and Tustin Avenue Project Number: N/A Type of work (TOW): Traffic Signals TOWDescription: Interconnect traffic signals to improve coordination $0 and communication Project Description: Provide studies, install new signal equipment and $0 implement new timing to enhance signal R synchronization. 20% City match to TSSP projects $0 managed by Cities of Irvine and Fountain Valley. FUND NAME NOTES M2 Fairshare 0.00 $0 $0 $22,430- M2 -FS funds CO from FY 15/16 to FY 16/17 $0 $0 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 Agency: Tustin Project Name: Jamboree Road Pavement Rehabilitation between 1� Barranca Pkwv and OCTA/SCRRA Project Limits: Between Barmnca Parkway and OCTA/SCRRA Project Number: N/A Type of work (TOW): Road Maintenance TOWDescription: Rehabilitation of roadway Project Description: Removal and deep lift repairs of AC pavement failure $0 areas, cold plane, construction of AC resurfacing, $100,000 traffic loops and traffic striping. FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES Unfunded 100.00 $1,300,000 $1,409,136 Uncertain Funding $1,300,000 $1,409,136 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost E $0 $0 $0 , $0 $100,000 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $1,200,000 $0 $0 $1,200,000 $1,309,136 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,300,000 $0 $0 $1,300,000 $ 1,409,136 6/14/2016 Measure M 8 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Jamboree Road Widening between Tustin Ranch Rd 19/20 and North City Limits Project Limits: Jamboree Road between Tustin Ranch Road and Estimated Cost North City Limits Project Number: N/A Type of work (TOW): Road Widening TOW Description: Add 2lanes to existing roadway in project limits Project Description: Widen to 6 -lane major arterial standards, decreasing $400,000 the existing median width. FUND NAME NOTES Developer 50.00 $1,400,000 $1,567,372 Developer Contribution for E and C phases Unfunded 50.00 $1,400,000 $1,567,372 Uncertain Funding -Construction Phase $2,800,000 $3,134,744 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 Project Limits: Kensington Park Dr from Valentia Av to future Moffet Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $400,000 $0 $400,000 $400,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $2,400,000 $2,400,000 $2,734,744 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $2,400,000 $2,800,000 $ 3,134,744 Agency: Tustin Project Name: Kensington Park Dr extension from Valencia Av to future Moffet Dr ext. 1702311 Project Limits: Kensington Park Dr from Valentia Av to future Moffet Estimated Cost Dr ext. Project Number: N/A Type of work (TOW): New Facility TOWDescription: New 2 lane roadway between project limits Project Description: Design and construction of Kensington Park Dr ext., $300,000 drainage improvements, traffic signal, medians, dry R utilities. ND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES Other 100.00 $4,300,000 $4,300,000 MCAS Land, CFD 14-1, CFD 06-1 & CFD OE Annex $4,300,000 $4,300,000 Proiect Phase 18/19 20/21 22/23 Estimated Cost Proiected Cost E $300,000 $0 $0 $0 , $0 $0 $0 $300,000 $300,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $4,000,000 $0 $0 $0 $0 $0 $0 $4,000,000 $4,000,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,300,000 $0 $0 $0 $0 $0 $0 $4,300,000 $4,300,000 6/14/2016 Measure M 9 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Laurelwood Curb Ramp Construction Proiect [702321 Project Limits: Laurelwood Area Project Number: N/A Type of Work (TOW): Pedestrian TOW Description: Installation of ADA access ramps Project Description: Construction of ADA cub ramps and removal of $0 sub -standard ramps. NOTES CDBG 0.00 $0 $0 CO $50k from FY 15/16 to FY 16/17 Gas Tax 0.00 $0 $0 $0 $0 Proiect Phase Agency: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 FUND NAME Agency: Tustin Project Name: Main Street Improvements [400871 Project Limits: Main Street between Newport Avenue and Prospect $201,846 Avenue Project Number: N/A Type of Work (TOW): Safety TOW Description: Install guard mils, curbs or other safety barriers 5.89 along road Project Description: Main Street improvements including installation of Unfunded medians, traffic striping, enhanced landscaping and $2,700,000 widening of sidewalks. FUND NAME 18/19 NOTES AB2766 5.83 $198,000 $201,846 Includes $98k CO from prioryr CDBG 8.83 $300,000 $305,827 Community Dev Block Grant M2 Fairshare 5.89 $200,000 $203,885 CO from prior yr Unfunded 79.46 $2,700,000 $2,752,443 Uncertain Funding $0 $0 $3,398,000 $3,464,000 $0 Proiect Phase 18/19 A 20/21 Estimated Cost Proiected Cost E $398,000 $0 $0 $0 $0 $0 $0 $398,000 $398,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $3,000,000 $0 $0 $0 $0 $0 $3,000,000 $3,066,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $398,000 $3,000,000 $0 $0 $0 $0 $0 $3,398,000 $ 3,464,000 6/14/2016 Measure M 10 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Mitchell Avenue Rehabilitation between East of 19/20 Carfax Dr and Brownina Avenue Project Limits: Mitchell Avenue between east of Carfax Drive and Estimated Cost Brownina Avenue Project Number: N/A Type of work (TOW): Road Maintenance TOwoescription: Install guard mils, curbs or other safety barriers $0 along road Project Description: R&R of failed AC areas, repair of sidewalk and C&G, R ramp reconstruction, cold plane and AC resurfacing, $0 traffic loops and striping FUND NAME NOTES Unfunded 100.00 $400,000 $407,700 Uncertain funding $400,000 $407,700 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 21/22 Moffet Dr from Future Kensington Park Ext to Tustin Estimated Cost Proiected Cost E $0 $50,000 $0 $0 $0 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $350,000 $0 $0 $0 $0 $0 $350,000 $357,700 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $0 $0 $0 $0 $0 $400,000 $407,700 Agency: Tustin Project Name: Moffet Drive Ext. from Future Kensington Park Ext. to NOTES Tustin Ranch Rd (702301 Project Limits: Moffet Dr from Future Kensington Park Ext to Tustin $3,600,000 Ranch Road Project Number: N/A Type of work (TOW): New Facility TOwoescription: New 2 lane roadway between project limits Project Description: Design and construction of Moffet Dr from Future $200,000 Kensington Ext to Tustin Ranch Rd, drainage, traffic R signal, medians and dry utilities FUND NAME PERCENT AIWTED COST PROJECTED COST NOTES Other 100.00 $3,600,000 $3,600,000 MCAS Land, CFD 06-1, CFD 14-1 funds E $200,000 $3,600,000 $3,600,000 $0 , Proiect Phase 18/19 20/21 22/23 Estimated Cost Proiected Cost E $200,000 $0 $0 $0 , $0 $0 $0 $200,000 $200,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $3,400,000 $0 $0 $0 $0 $0 $0 $3,400,000 $3,400,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,600,000 $0 $0 $0 $0 $0 $0 $3,600,000 $ 3,600,000 6/14/2016 Measure M 11 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Moffet Drive Extension from Park Avenue to Peters 19/20 Canyon Channel 1702241 Project Limits: Moffet Drive from Park Avenue to east of Peters Estimated Cost Canyon Channel Project Number: N/A Type of Work (TOW): New Facility TOWDescription: New 2 lane roadway between project limits Project Description: Design and construction of Moffet Dr extension $0 including bridge construction over Peters Canyon R Channel NOTES Other 0.00 $0 $0 CFD 06-1, IRWD reimb, MCAS TAB Pnor Yr Exp.—$12.7M Other 100.00 $5,900,000 $5,900,000 MCAS TAB, CO Past Yrs, C Phase $5,900,000 $5,900,000 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $5,900,000 $0 $0 $0 $0 $0 $0 $5,900,000 $5,900,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,900,000 $0 $0 $0 $0 $0 $0 $5,900,000 $ 5,900,000 Agency: Tustin Project Name: Newport Ave and SR -55 NB Ramps/Del Amo Ave 1� Intersection Improvements Project Limits: Newport Avenue and SR -55 Northbound Ramps/Del Estimated Cost Amo Avenue Project Number: 16-TUST-ICE-3818 Type of Work (TOW): Intersection TOW Description: $0 Project Description: Modification of curb return at the northwest corner of the intersection, southbound restriping and signing to add a second right -tum lane FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES General Fund 25.00 $37,570 $38,333 City match 25% [GF], Fair Share funds extra work M2 ICE 75.00 $112,710 $114,999 CTFP_ICE total amount $117,338 in FY 16P & 17/18 $150,280 $153,332 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost _ E $11,560 $0 $0 , $0 $0 $0 $0 $11,560 $11,560 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $138,720 $0 $0 $0 $0 $0 $138,720 $141,772 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,560 $138,720 $0 $0 $0 $0 $0 $150,280 $ 153,332 6/14/2016 Measure M 12 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Newport Avenue Extension,N/OEdingerAvenue- 19/20 Phase II (CIP 70131) Project Limits: From current terminus to south of Edinger Avenue Project Number: N/A Type of work (TOW): New Facility TOwoescription: New 6 lane roadway between project limits Project Description: Extension of Newport Avenue from current terminus $0 to south of Edinger Avenue including the railroad $1,000,000 underpass and the widening of Newport Avenue R from Tustin Grove Drive to Myrtle Avenue. Includes $0 realignment offlood control channel. FUND NAME NOTES Unfunded 100.00 $51,000,000 $57,728,537 Uncertain funding. Prior exp. includes M-Tur backfunds $51,000,000 $57,728,537 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 Project Limits: Newport Avenue between 1-5 and Holt Avenue Estimated Cost Proiected Cost E $0 $0 $0 $0 $1,000,000 $0 $0 $1,000,000 $1,000,000 R $0 $0 $0 $0 $0 $10,000,000 $0 $10,000,000 $11,149,477 C/I $0 $0 $0 $0 $0 $0 $40,000,000 $40,000,000 $45,579,060 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $10,000,000 $40,000,000 $51,000,000 $ 57,728,537 Agency: Tustin Project Name: Newport Avenue Rehabilitation between 1-5 and Holt 1� Avenue Project Limits: Newport Avenue between 1-5 and Holt Avenue Project Number: N/A Type of work (TOW): Road Maintenance TOwoescription: Rehabilitation of roadway Project Description: Street rehabilitation, R&R offailed AC areas, repair $0 of sidewalk, C&G, ramp reconstruction, cold plane $100,000 pavement, AC resurfacing, traffic loops and striping. FUND NAME PE N Unfunded 100.00 $900,000 $917,600 Uncertain funding $900,000 $917,600 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost E $0 $100,000 $0 , $0 $0 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $800,000 $0 $0 $0 $0 $0 $800,000 $817,600 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000 $0 $0 $0 $0 $0 $900,000 $ 917,600 6/14/2016 Measure M 13 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Newport Avenue Rehabilitation between Sycamore 19/20 Avenue and 1-5 Freeway Project Limits: Newport Av between Sycamore Av and 1-5 Project Number: N/A Type of Work (Tow): Road Maintenance TOWDescnption: Rehabilitation of roadway Project Description: R&R of failed AC areas, repair of sidewalk and C&G, $0 ramp reconstruction, cold plane and AC resurfacing, $100,000 traffic loops and striping FUND NAME NOTES Unfunded 100.00 $700,000 $713,200 Uncertain funding $700,000 $713,200 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $100,000 $0 $0 $0 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $600,000 $0 $0 $0 $0 $0 $600,000 $613,200 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $700,000 $0 $0 $0 $0 $0 $700,000 $ 713,200 Agency: Tustin Project Name: Newport Avenue Signal Synchronization Project $22,500 1400851 Project Limits: Newport Avenue in the City of Tustin -OCTA Lead M2-TSSP funding managed by OCTA as lea ADencv Project Number: 13 -OCTA -TSP -3667 Type of work (TOW): Traffic Signals TOWDescnption: Coordinate signals within project limits Project Description: Design and Implementation of Traffic Signal $0 Coordination along Newport Avenue including R installation of interconnect conduit and cable $0 between Sycamore Av & Walnut Av and between $0 Mitchell Av & Nisson Rd. City match of 20% to OCTA $0 managed Droiect. FUND NAME PERCENT ESTIMA N M2 Fairshare 100.00 $22,500 $22,500 M2 -FS -$123,709- CO from pnoryrfor O&N M2 TSSP 0.00 $0 $0 M2-TSSP funding managed by OCTA as lea Proiected Cost _ E agency -CO prior yrs $22,500 $22,500 , $0 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost _ E $0 $0 $0 , $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $22,500 $0 $0 $0 $0 $0 $0 $22,500 $22,500 $22,500 $0 $0 $0 $0 $0 $0 $22,500 $ 22,500 6/14/2016 Agency: Tustin Project Name: Park Avenue Extension from Victory Road to Moffett in Drive [702251 Project Limits: Park Avenue from Victory Road to Moffett Drive Project Number: N/A Type ofWoric (Tow): New Facility Tow Description: New 2 lane roadway between project limits Project Description: Design and construction of Park Avenue extension Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 NOTES Other 100.00 $500,000 $500,000 MCAS TAB, CO "C' Phase from prior yrs Other 0.00 $0 $0 CFD 06-1, IRWD, Expenditures Past Yrs- E C Phases $500,000 $500,000 14 Proiect Phase Agency: 18/19 in 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $500,000 $0 $0 $0 $0 $0 $0 $500,000 $500,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $0 $0 $500,000 $ 500,000 E NOTES Other 57.45 $1,350,000 $1,375,277 CFD 07-1 includes $350k in E phase from prior yr Unfunded 42.55 $1,000,000 $1,018,723 Uncertain funding $2,350,000 $2,394,000 Proiect Phase Agency: Tustin Project Name: Park Avenue Widening between District Drive and Warner Avenue [Newt Project Limits: Park Avenue between District Drive and Warner E Avenue Project Number: N/A Type of work (Tow): Road Widening Tow Description: Widen width of existing traffic lanes Project Description: Design and construction of circulation improvements E NOTES Other 57.45 $1,350,000 $1,375,277 CFD 07-1 includes $350k in E phase from prior yr Unfunded 42.55 $1,000,000 $1,018,723 Uncertain funding $2,350,000 $2,394,000 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost E $350,000 $0 $0 , $0 $0 $0 $0 $350,000 $350,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $2,000,000 $0 $0 $0 $0 $0 $2,000,000 $2,044,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $350,000 $2,000,000 $0 $0 $0 $0 $0 $2,350,000 $ 2,394,000 6/14/2016 Measure M 15 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Red Hill Ave Widening & Raised Medians between $6,000,000 Barranca Pkwv & Edinaer Ave Project Limits: Red Hill Avenue between Dyer Rd/Barranca Pkwy "C' Phase City match 25% [GF -MCAS, CFD and Edinaer Avenue Project Number: 16-TUST-ACE-3817 Type of work (TOW): Road Widening TOW Description: Add 1 lane to existing roadway in project limits Project Description: Design and construction of N/B widening from 3 to $8,200,000 lanes, raised medians, landscaping and irrigation R system. [Combined City CIP Projects 70226, 70227 & $0 70197] Proiect Phase Tustin NOTES M2 ACE 73.17 $6,000,000 $6,000,000 2016 Call $6M CTFP_ACE funding "C' Phas Other 24.39 $2,000,000 $2,000,000 "C' Phase City match 25% [GF -MCAS, CFD Proiected Cost E funds] Other 2.44 $200,000 $200,000 City GF - MCAS, CFD funds for "E" phase $0 $0 includes 100k CO $8,200,000 $8,200,000 R Proiect Phase Tustin Project Name: 18/19 19/20 20/21 Project Limits: Redhill Avenue between San Juan Street and Bryan Estimated Cost Proiected Cost E $200,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $8,000,000 $0 $0 $0 $0 $0 $0 $8,000,000 $8,000,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,200,000 $0 $0 $0 $0 $0 $0 $8,200,000 $ 8,200,000 Agency: Tustin Project Name: Red Hill Avenue Rehabilitation between San Juan St and Brvan Av fCIP No. 702201 Project Limits: Redhill Avenue between San Juan Street and Bryan Estimated Cost Avenue Project Number: N/A Type of work (TOW): Road Maintenance TOWDescription: Rehabilitation of roadway Project Description: Removal and deep lift repairs of AC pavement failure $50,000 areas, cold plane, construction of AC resurfacing, R traffic loops and traffic striping. The project also $0 includes median reconstruction to lengthen $0 northbound left tum pocket at Bryan Avenue. FUND NAME PERCENT E NOTES Unfunded 100.00 $400,000 $415,569 Uncertain funding $400,000 $415,569 Proiect Phase 18/191� 20/21 M. 22/23 Estimated Cost Proiected Cost E $0 $0 $50,000 $0 , $0 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $350,000 $0 $0 $0 $0 $350,000 $365,569 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $0 $0 $0 $0 $400,000 $415,569 6/14/2016 Agency: Tustin Project Name: Red Hill Avenue Rehabilitation between Walnut Av 19/20 and 1-5 Project Limits: Red Hill Avenue between Walnut Avenue and 1-5 Estimated Cost Freeway Project Number: N/A Type of Work (Tow): Road Maintenance TOWDescdption: Rehabilitation of roadway Project Description: R&R of failed AC areas, repair of sidewalks, C&G, $50,000 ramp reconstruction, cold plane pavement and AC R resurfacing, traffic loops and striping Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 FUND NAME NOTES Unfunded 100.00 $550,000 $572,242 Uncertain funding $550,000 $572,242 16 Proiect Phase Agency: 18/19 19/20 20/21 21/22 200'southerly fCIP No. 701961 Estimated Cost Proiected Cost E $0 $0 $50,000 $0 $0 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $500,000 $0 $0 $0 $0 $500,000 $522,242 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $550,000 $0 $0 $0 $0 $550,000 $ 572,242 FUND NAME PERCENT E N Unfunded 100.00 $1,100,000 $1,225,529 Uncertain funding $1,100,000 $1,225,529 Proiect Phase Agency: Tustin Project Name: Red Hill Avenue Widening between Melvin Wy and 200'southerly fCIP No. 701961 Project Limits: Red Hill Avenue from Melvin Way to 200 feet E southedv Project Number: N/A Type of work (TOW): Road Widening TOW Description: Widen width of existing traffic lanes Project Description: Street widening on the easterly side within the City R boundary and drainage improvements FUND NAME PERCENT E N Unfunded 100.00 $1,100,000 $1,225,529 Uncertain funding $1,100,000 $1,225,529 Proiect Phase 18/19 A 20/21 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $200,000 $200,000 $200,000 R $0 $0 $0 $0 $0 $0 $100,000 $100,000 $113,948 C/I $0 $0 $0 $0 $0 $0 $800,000 $800,000 $911,581 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,100,000 $1,100,000 $ 1,225,529 6/14/2016 Measure M 17 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Seventeenth Street Signal Synchronization Project M2 Fairshare 1400861 Project Limits: Seventeenth Street in the City of Tustin - OCTA Lead Estimated Cost Aaencv Project Number: 15 -OCTA -TSP -3786 Type of work (TOW): Traffic Signals TOWDescription: Coordinate signals within project limits Project Description: Design and implementation oftraffic signal $0 coordination along Seventeenth St. including R installation of TS controllers and fiber optic $10,000 interconnect. City contribution of 20% match to $0 OCTA managed project. FUND NAME Tustin Project Name: NOTES M2 Fairshare 100.00 $10,000 $10,000 $64,797 -CO prior yrs -20%match O&M Estimated Cost Proiected Cost E M2 -FS M2 TSSP 0.00 $0 $0 M2 TSSP funding managed by OCTA as lea $0 $0 $0 agency R $10,000 $10,000 $0 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 21/22 22/23 Estimated Cost Proiected Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $10,000 $0 $0 $0 $0 $0 $10,000 $10,000 $0 $10,000 $0 $0 $0 $0 $0 $10,000 $ 10,000 Agency: Tustin Project Name: Traffic Calming - Main Street and Bryan Avenue NOTES 1702281 Project Limits: Intersection of Main Street and Bryan Avenue Project Number: N/A Type of Work (TOW): Safety TOW Description: Traffic calming such as bulbout,chokers, speed $0 hump, etc. Project Description: Prepare conceptual plans and preliminary design for $0 the Main Street and Bryan Avenue intersection to R improve traffic flow FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES Gas Tax 0.00 $0 $0 $50k CO from prior yr 2015/16 E $0 $0 $0 $0 Proiect Phase 18/19 A 20/21 Estimated Cost Proiected Cost ■ E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/14/2016 Measure M 18 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Traffic Signal Controller Equipment Upgrades and iK Replacements (CIP 40080) Project Limits: Various existing signalized intersections throughout Estimated Cost the city. Project Number: N/A Type of work (Toru): Traffic Signals Tow Descnption: Replace and upgrade traffic signals and equipment Project Description: Upgrades or replacement of aging traffic signal equipment at various locations throughout the city. UND NAME NOTES 12 Fairshare 100.00 $800,000 $835,983 Includes $138,209- CO from prioryr 15/16 16/17 $800,000 $835,983 Proiect Phase Tustin 17/18 18/19 iK 20/21 21/22 22/23 Estimated Cost Proiected Cost - E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $160,000 $160,000 $160,000 $160,000 $160,000 $0 $0 $800,000 $835,983 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $160,000 $160,000 $160,000 $160,000 $160,000 $0 $0 $800,000 $ 835,983 Agency: Tustin Project Name: Tustin Ranch Road/Von Kansan Avenue Traffic NOTES Signal Svnchronization Proiect Project Limits: Between Pioneer Road in Tustin and Campus Drive in $233,045 Irvine Project Number: 16-IRVN-TSP-3792 Type of work (Tow): Traffic Signals Tow Descnption: Coordinate signals within project limits Project Description: Traffic studies, install new signal equipment and implement new timing to synchronize signals on Tustin Ranch Rd and Von Karman Avenue. Regional TSSP project managed by the City of Irvine. FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES M2 Fairshare 12.95 $233,045 $233,045 City of Tustin share of 20% match M2 TSSP 80.00 $1,440,000 $1,440,000 Irvine -Lead Agency, $932,180 in TSSP for $0 $0 $0 $0 Tustin Segment Another Agency 7.05 $126,955 $126,955 City of Irvine (Lead Agency) - Project $0 $0 $0 $0 Contribution C/I $1,692,000 $1,800,000 $1,800,000 $0 Proiect Phase 18/19 1� 20/21 22/23 Estimated Cost Proiected Cost E $0 $0 $0 , $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $1,692,000 $0 $0 $0 $0 $0 $0 $1,692,000 $1,692,000 O&M $0 $108,000 $0 $0 $0 $0 $0 $108,000 $108,000 $1,692,000 $108,000 $0 $0 $0 $0 $0 $1,800,000 $ 1,800,000 6/14/2016 Measure M 19 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Valencia Avenue Widening between Newport Av 19/20 and Red Hill Av Project Limits: Valencia Avenue between Newport Avenue Estimated Cost Extension and Red Hill Avenue. Project Number: N/A Type ofworic (Tow): Road Widening Towoescription: Add 2lanes to existing roadway in project limits Project Description: Widening to 4 -lane primary arterial roadway with median. Includes improvements at Valencia/Red Hill including NB and SB dual left -turn lanes, SB right -tum lane. Modification of traffic signals at Valencia/Red Hill and Valencia/Newport. UND NAMEMS'IVIPERCENT ESTIMATED COST PROJECTED COST NOTES nfunded 100.00 $5,500,000 $6,148,325 Uncertain Funding $5,500,000 $6,148,325 Proiect Phase Tustin Project Name: 18/19 19/20 20/21 Project Limits: Victory Road from Red Hill Avenue to Armstrong Estimated Cost Proiected Cost E $0 $0 $0 $0 $500,000 $0 $0 $500,000 $500,000 R $0 $0 $0 $0 $0 $2,000,000 $0 $2,000,000 $2,229,895 C/I $0 $0 $0 $0 $0 $0 $3,000,000 $3,000,000 $3,418,430 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $2,000,000 $3,000,000 $5,500,000 $ 6,148,325 Agency: Tustin Project Name: Victory Road Extension: Red Hill Av to Armstrong Av Other ICIP 702211 Project Limits: Victory Road from Red Hill Avenue to Armstrong Estimated Cost Avenue Project Number: N/A Type of work (Tow): New Facility Towoescription: New 4 lane roadway between project limits Project Description: Design and construction of Victory Road (formerly Bell Av) from Red Hill Av to Armstrong Av including drainage improvements, utilities, modification of traffic signal at Red Hill Av and Bell Av intersection ME N Other 41.11 $1,850,000 $1,850,000 SOCCCD- Inludes$350k FY16/17 Additiom Estimated Cost Proiected Cost E funds Other 28.89 $1,300,000 $1,300,000 CFD O6-1(TSIA)-COpast yrs Other 30.00 $1,350,000 $1,350,000 MCAS TAB (CFD 14-1)- Includes $350k R $0 $0 Additional funds $0 $4,500,000 $4,500,000 $0 Proiect Phase 18/19 20/21 22/23 Estimated Cost Proiected Cost E $200,000 $0 $0 $0 , $0 $0 $0 $200,000 $200,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $4,300,000 $0 $0 $0 $0 $0 $0 $4,300,000 $4,300,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,500,000 $0 $0 $0 $0 $0 $0 $4,500,000 $4,500,000 6/14/2016 Measure M 20 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Tustin Project Name: Westbound EI Camino Real at Tustin Ranch Road 19/20 Improvements Proiect Project Limits: EI Camino Real at Tustin Ranch Road Project Number: N/A Type of Work (TOW): Intersection TOW Description: Add left turn and right turn lanes to intersection Project Description: Intersection modifications to add second westbound left -tum lane and exclusive right -tum lane on EI Camino Real at intersection with Tustin Ranch Road. -UND NAME NOTES )eveloper 100.00 $3,000,000 $3,000,000 Developerfunds by The Irvine Co. $3,000,000 $3,000,000 Project Phase 18/19 19/20 20/21 21/22 22/23 Estimated Cost Projected Cost E $300,000 $0 $0 $0 $0 $0 $0 $300,000 $300,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,700,000 $0 $0 $0 $0 $0 $0 $2,700,000 $2,700,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,000,000 $0 $0 $0 $0 $0 $0 $3,000,000 $ 3,000,000