Loading...
HomeMy WebLinkAboutOB 1 ADD'L PKG SPACES 03-18-91MARCH 13, 1991 TO: WILLIAM A. HUSTON, CITY MANAGER OLD BUSINESS NO. 1 3-18-91 Inter - Com FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: ADDITIONAL PARKING SPACES AT CAMINO REAL PARR RECOMMENDATION: Pleasure of the City Council. BACKGROUND: The City Council at their previous meeting of March 41 1991 requested staff to submit proposal/cost analysis for additional parking spaces on E1 Camino Real, adjacent to Camino Real Park. DISCUSSION: Staff has provided two alternatives as follows: Alternative I: Four regular parking spaces and one handicapped (5 spaces) parking spaces within a recessed parking bay. See attached sketch for the recommended location. The related cost estimates are listed as follows: Construction cost $ 22,450.00 Contingency (10%) ................... $ 2,245.00 Engineering, Administration and construction staking (15%) ...... $ 31367.50 Alternative II: Two regular parking spaces and one handicapped (3 spaces) parking space within a recessed parking bay. The related cost estimates are listed as follows: Construction cost $ 17,200.00 Contingency (10%) ................... $ 11720.00 Engineering, Administration, and construction staking (15%) ...... $ 21580.00 The work to be done for either Alternative I or Alternative II, consists of construction of new curbs, sidewalks, wheelchair ramp, cross gutter, asphalt concrete pavement, and modifications of landscaping/sprinkler systems. Bob Ledendecker Director of Public Works/ City Engineer BL:JC:ccg:jcpark Jeff Chen Transportation Engineer