SUBJECT: COOPERATIVE AGREEMENT BETWEEN THE CITY OF SANTA ANA AND THE
CITY OF TUSTIN FOR THE IMPROVEMENT OF RED HILL AVENUE FROM
BARRANCA ROAD TO WARNER AVENUE
RECOMMENDATION:
It is recommended that the City Council, at their meeting of
January 21, 1991, authorize the Mayor to sign, and the City
Clerk to attest to the attached subject agreement.
BACKGROUND:
The agreement provides for the improvement of Red Hill Avenue
from Barranca Road to Warner Avenue. The scope of the project
is to reconstruct and/or rejuvenate and resurface the highway
pavement. Related work on the project will include traffic
striping and pavement markers, detection loops, sidewalk and
curb and gutter repair, and adjustment of manholes and water
valves to grade. The joint effort between the two agencies will
allow the entire street to be improved in lieu of just three
quarters of the street.
The estimated construction cost of the project is Seven Hundred
Nineteen Thousand Seven Hundred Eighty Dollars ($719,780). This
project has been approved for 50% funding ($359,390) by Orange
County Unified Transportation Trust (OCUTT).
The City of Santa Ana will reimburse the City of Tustin for
Santa Ana's portion of the construction costs, which is
estimated to be $130,000, and the City of Tustin's cost is
estimated to be $230,390. City funding for this project has
been included within the 1990-91 Capital Improvement Program in
the amount of $242,100.
Bob Ledendecker
Director of Public Works/
City Engineer
BL: WA: ccg
Wisam Altowaiji
Associate Civil Engineer
COOPERATIVE AGREEMENT BETWEEN THE
CITY OF SANTA ANA AND THE CITY OF TUSTIN
FOR IMPROVEMENT OF REDHILL AVENUE
FROM BARRANCA ROAD TO WARNER AVENUE
THIS AGREEMENT, dated for convenience as of ,
19 , is made and entered into by and between the CITY OF SANTA
ANA (hereinafter referred to as "Santa Anal') and the CITY OF TUSTIN
(hereinafter referred to as "Tustin"), municipal corporations of
the State of California.
W I T N E S S E T H:
RECITALS:
A. Tustin and Santa Ana desire to improve Redhill Avenue
from Barranca Road to Warner Avenue. The scope of the Project is
to reconstruct and/or rejuvenate and resurface the highway
pavement. Related work on the Project will include traffic
signalization and pavement markers, sidewalk and curb and gutter
repair, and adjustment of manholes and water valves to grade. The
Project is included in the 1990-91 Orange County Unified
Transportation Trust (OCUTT) Fund, Streets and Roads Program. This
work will hereinafter be referred to in this Agreement as the
"Project".
B. The City of Tustin will act as Lead Agency for the
Project. Tustin will provide survey, design and inspection
engineering for the Project; will process Project plans,
specifications and cost estimates to Santa Ana, OCUTT and public
utilities offices for review; and will administer Project contract
1
bidding, award and construction.
C. Santa Ana will provide the Project design materials
report and will review and comment on Project plans, specifications
and estimates prior to contract bidding.
D. The total cost of the Project is estimated to be Seven
Hundred Nineteen Thousand Seven Hundred Eighty Dollars ($719,780).
The total estimated cost will be divided between the parties and
OCUTT as follows:
Tustin Santa Ana OCUTT Total
Construction $230,390 $130,000 $359,390 $719,780
E. Santa Ana and Tustin are each empowered by law to expend
public monies to improve Redhill Avenue.
F. Santa Ana and Tustin desire to accomplish all of the
needed work as described herein by a single public works project
in which Tustin will act as the Lead Agency, and Santa Ana will
reimburse Tustin for Santa Ana's portion of the construction costs.
WHEREFORE, the Parties hereto do hereby agree as follows:
Section 1: The "Project"
The Project shall include the improvement of Redhill Avenue
from Barranca Road to Warner Avenue as described in the Recitals
of this Agreement.
Section 2: Tustin's Responsibilities
Tustin shall act as the Lead Agency for the work and shall
provide preliminary, design and construction engineering. Tustin
shall also be solely responsible for the preparation and award of
the contract pursuant to public bid requirements for the
2
construction of the Project, including the portion of the Project
that is in Santa Ana. Tustin shall be responsible for the
preparation of all legal documents, including the Notice Inviting
Bids, Instructions to Bidders, and the related construction
agreements, surety bonds and insurance certificates. Tustin shall
be solely responsible for the administration and performance of the
contract awarded to the contractor for the construction of the
Proj ect .
Section 3: Santa Ana's Responsibilities
The City of Santa Ana shall provide the Project Design
Materials Report and shall review and comment upon Project plans,
specifications and estimates prior to contract bidding.
Section 4: Compliance with OCUTT Streets and Roads
Procedure Manual
Tustin shall comply with the policies and procedures outlined
in the OCUTT Streets and Road Procedure Manual in carrying out the
Project so that the Project will be eligible for OCUTT Funds as set
forth in the Recitals.
Section 5: Rights of Access
Santa Ana shall have the right to access to the construction
site of the Project for purposes of inspection of all of the
improvements.
Section 6: Costs
Tustin shall pay all costs associated with the design and
construction of the Project subject to reimbursement for fifty
percent (500) of the Project construction costs by OCUTT Funds and
subject to Santa Ana's reimbursement for Santa Ana's portion of the
J
construction costs.
The Parties agree that the preliminary estimate of Santa Ana's
share of the cost is One Hundred Thirty Thousand Dollars
($130,000).
Section 7: Cost Estimate Exceeded
In the event the sealed bids submitted by the lowest
responsible bidder for the construction of the Project show that
Santa Ana's portion of the Project costs will exceed the
preliminary estimate by ten percent (10%), Tustin shall not award
such contract and shall not bind Santa Ana hereunder without the
prior written consent of Santa Ana.
Section 8: Environmental Requirements
Tustin shall act as the Lead Agency for the processing of
environmental impact assessments, studies, reports and award of the
contract and shall be responsible for full compliance with the
provisions of the California Environmental Quality Act ("CEQA") for
the entire Project.
Section 9: Change orders
The prior approval of Santa Ana's City Engineer shall be
obtained for all change orders issued by Tustin pertaining to the
construction of the Project. Change orders issued without Santa
Ana's approval shall not be eligible for reimbursement from Santa
Ana. Oral approval shall be valid only if confirmed in writing by
Santa Ana's City Engineer.
Section 10: Payment
Santa Ana shall reimburse Tustin for Santa Ana's proportionate
4
share of the total as built Project costs within thirty (30) days
after receipt of an invoice from Tustin.
Section 11: Hold Harmless
Neither Santa Ana nor Tustin shall be liable for the acts or
omissions of the other. Each party shall protect, defend,
indemnify and hold the other and its respective officers and
employees harmless from and against any and all claims, actions,
expenses, liabilities and losses incurred by one of the Parties
hereto as a result of any property damage or personal injury,
including death, suffered or allegedly suffered by any person, and
caused by any wrongful act or omission of the other Party.
Section 12: Insurance
Tustin shall require the contractor for the Project to
maintain a policy of comprehensive or commercial general liability
insurance for personal injury and property damage, including motor
vehicles, for the duration of the contract, in amounts and in a
form satisfactory to the City Attorneys of both Parties. Said
policy shall name both Cities and their officers, agents and
employees as additional insureds.
IN WITNESS WHEREOF, the Parties hereto have executed this
a
Agreement as of the date and year first above written.
CITY OF SANTA ANA
ATT ST:
Clerk of- the" C it
??
APPROVED AS TO FORM:
City At orn y
ATTEST:
Clerk of the Council
CFI: 7/20/90:Q\486
v
Approve a content
City manaw
APPROVED AS TO CONTENT:
ity Engineer
CITY OF TUSTIN
Mayor
APPROVED AS TO CONTENT:
City Engineer
0
i