Loading...
HomeMy WebLinkAboutRPT 3 I-5 WIDENING 01-21-91DATE: TO: FROM: SUBJECT: t JANUARY 15, 1991 WILLIAM A. HUSTON, CITY ENGINEER REPORTS NO. 3 1-21-91 Inter - Com PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION INFORMATION REPORT - I-5 WIDENING TUSTIN RANCH ROAD TO NEWPORT AVENUE RECOMMENDATION: Receive and file. BACKGROUND: At the January 7, 1991 City Council meeting, staff was directed to send a letter to Caltrans requesting that the remaining work on the Tustin Ranch Road Interchange Project be accelerated by working overtime to minimize the impacts to the proposed ramp closures at the Red Hill Interchange and the reduction of Red Hill Avenue to one travel lane in each direction. Staff made verbal contact with Caltrans on January 8, 1991 and was informed that the overtime work had already been authorized and would commence immediately. The contractor has been working double shifts and weekends since that time. Consequently, staff has delayed writing the letter as requested. The following is a recap of the latest critical dates for closures and openings of Tustin Related facilities: January 14, 1991 Closure of northbound I-5 on-ramp from Red Hill Avenue. January 14, 1991 Closure of southbound I-5 off -ramp to Red Hill Avenue. January 17, 1991 Opening of Tustin Ranch Road (two lanes each direction over I-5 freeway) between Walnut Avenue and El Camino Real. January 23, 1991 Opening of northbound I-5 off -ramp to Tustin Ranch Road. January 23, 1991 Closure of northbound I-5 off -ramp to Red Hill Avenue. January 23, 1991 Closure of southbound I-5 on-ramp from Red Hill Avenue. End of February, 1991 Open southbound I-5 on-ramp from Tustin Ranch Road. February 1, 1991 Reduction of through travel lanes on Red Hi 11 Avenue from two ( 2 ) to one (1) in each direction. Caltrans has been dealing with the Tustin Police Department for special traffic direction/enforcement in the vicinity of Newport Avenue and the I-5 Freeway. As the traffic patterns stabilize, both Caltrans and City staff will be adjusting traffic signal timing along Newport Avenue to maximize the traffic flows. 7%.�-- C34c �� Bob Ledendecker Director of Public Works/City Engineer BL:ccg