HomeMy WebLinkAboutRPT 5 E. TRANSP CORR. 02-06-89TO:
FROM:
WILLIAM'HUSTON, CITY MANAGER
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: EASTERN TRANSPORTATION CORRIDOR SCOPING MEETING
~ INFORMATION REPORT
RECOMMENDATION:
Receive and file.
BACKGROUND:
Caltrans conducted two environmental
Eastern Transportation Corridor Project.
two locations as follows:
scoping meetings regarding the
These meetings were held at
* January 10, 1989 at 7:00 P.M. at Sierra Vista Middle School,
Irvine
* January 12, 1989 at 7:00 P.M. at Foothill High School in the
North Tustin area.
Each of the meetings were proceeded with an open house from 6:00 P.M.'to
7:00 P.M. to provide the public the opportunity to express concerns and
views to the Caltrans staff and have any questions answered.
City staff attended the meeting on January 12, 1989 at Foothill High
School. The following is a recap of that meeting.
Staff Members Present:
Rich Adler, Orange County Environmental Management Agency
(opening remarks)
Kari Rigoni, Orange County Environmental Management Agency
(historical background)
Howard Hoffman, Corridor Design Management Group
(Scheduling)
Paul Gonzales, Caltrans (Environmental considerations and process
under CEQA/NEPA)
The following individuals who spoke at the meeting are recapped as
indicated below:
Jim Brooks - Comments are summarized on document labeled Attachment "A".
Alden Kelly - Expressed concerns on potential carbon dioxide levels.
Robert Schoenberq - Expressed concern with southerly terminus near
Peppertree homes at Walnut Avenue. Dangerous for school children.
Potential for lowering home values. Indicated that terminus should
connect to Edinger Avenue.
'EASTERN TRANSPORTATION CORRIDOR SCOPING MEETING
JAlq~JARY 31, 1989
PAGE 2.
LaVerne Wilcox - Expressed concern with three facilities within the
narrow canyon.
Rosalind Rollins (Cowan Heights) - While we talk, the hills are coming
down. Does it do any good to talk? Believes the meeting is a
subterfuge. She asked what happened to rail?
Mr. McDowell (Lemon Heights) - Felt that the project will help relieve
traffic problems and is needed. Environmental considerations are
important.
James Brown - Feels TCA needs to address connections to SR 91 Freeway.
(He is currently building a house in Lemon Heights area)
Jean O'Toole (Peters Canyon) - Resents the proximity of the project
when vacant land is plentiful to the East. Why not use tunnels?
Michelle Brooks - Wants homeowners committee to. review detailed
proposals.
·
It is my understanding that full certified transcripts of the meetings
will be available from TCA in the near future. These will be made
available to the City Council at that time.
Bob Ledendecker
Director of Public Works/City Engineer
BL:mv
F, ASTEI:tN TRJ%NSPORTATION COk
SCOPIN(~ · MEETIN(~
JANUARY 22 · '1989
COMI(ENTS BY
r ,.zs ' c. ,R°O S
· .
AND
MICH~LE L. BROOKS
ADMINISTRATIVE ISSUES,
1.
·
1
. ..developed for release-..to the press o.f these existing areas·
Once a draft project scope has been prepared (including
draft Notice of Preparation or draft Notice of Intent),
another public meeting should be held to receive comment as
to scoping adequacy.
The project report should call for an executive summary in
comparative matrix format so as to allow the public to
~uick!y understand the relative impacts of the various
significant report factors. These matrix factors should be
significant issues such as cost, funding, noise,"air ....
Pollution, traffic demands, etc. and not totally engineering
issues such as geology, hydrology, etc.
Public information and comment meetings should be frequently
held d~ring the project development to allow public comment
and critique. Accurate ~ress information should be
Many of the newspapers have outdated maps that they continue
to use. Improved notice mailings should be made (we were
left off the mailing list for the notice of this meeting).
PROJECT oBJECTIVES
1. The major objective for the ETC project should be the
development of a road system that meets the regional needs
for traffic demand with the least amount of cost and
environmental disruption. The earlier study objectives
which included relief for the SR55 and service to the Irvine
Business Complex were too narrow, especially when other
freeway projects closer to the IBC and SR55 could do more.
(For example, SR55 widening, SR55 extension, SR57 extension,
1-405 widening, I-5 and 1-405 interchange expansion.)
. ,
2. The least Cost objective is' important. There is projected
to be a $7 Billion shortfall in funding for Orange County
needed roads over the next 20 years. A higher than
necessary cost on the ETC will partially exhaust funding
..-necessary for other areas. For example, unused developer
fees could be used on other proximity road projects and toll
road commitments could be used elsewhere.
ETC
Brooks
Page 2
FACiliTY TYPE ALTERNATIVES''
1. .The -backbone ETC freeway" from SR91 to the FTC near the E1
Toro Marine Base appears appropriate. There are no
immediately adjacent existing population areas.
2. ~There are ETC alignment areas which contain immediately
adjacent existing population including Peter's Canyon,
Tustin Plain, Walnut Villages (transition area)~ and the
Groves (corner of Irvine Blvd. and Jeffery Road). There
..should be at least three facility type alternatives examined
for these sensitive areas including:
ao
no project, MPAH fully developed-
single facility expressway(s), 6 lane maximum,
higher speed'; no signals, limited access, grade
and curves sensitive to surrounding environment
dual facility freeway(s), Peter's Canyon with 2la
and Jamboree Road and/or Eastern Leg with 72a and
Sand Canyon Road
~ENVIRONMENTAL ISSUES
1. For each of the environmental areas including air pollution,
noise,.~ight, historical, biology, etc.
ao
bo
all new-studies should be completed
actual on-site 24 hour/4 season readings should be
used where possible as ~ses for computer modeling
or extrapolation (occasional factors such as E1
Toro and Orange County airport noise, Marine
helicopter noise., etc. should be also included and
truck traffic noise components should be
segregated)
all studies should include the cumulative effects
of nearby other transportation projects, existing
or proposed, Eastern and/or Western leg, if any,
including the extensions of Culver, Jamboree,
Jeffery, Sand Canyon, Portola, etc.
ETC
Brooks
Page 3
key environmental factor impacts such as air,
sound and sight should be described in terms of
the number of homes within certain distances which
have environmental deterioration
e·
mitigation investigations should be made for each
alternative to include berms, walls, landscaping,
recessing, cut-and-fills, etc.
proposed road elevations need to be checked for
accuracy
·
a three dimensional model of these areas would
assist the visualization of the potential
environmental PrOblems .
Land use impacts should be evaluated considering the 1983
AQMD recommendations as to residentials, parks, and
businesses near freeways or major roads
·
Interchange configurations should be at or below grade in
most cases especially I-5 and East Orange Bowl to reduce the
¥isual and noise impac.t?.
TRANSPORTATION SYSTEM ANALYSIS
1. The ETC transportation studies should include other major
projects now planned for the region including SR55 widening,
SR91, widening, SR57 widening, I-5 widening, 1-405 widening,
light raT1 system, AMTRAK system, SR57 extension, SR55
extension, FTC, SJHC, MPAH including the extensions of
Culver (6 lanes), Jeff·fy (6 lanes), Sand Canyon (6 lanes),
and Jamboree (6 lanes), Irvine widening, and Newport
widening (the cumulative of all these projects may reduce
the need for one lane each way).
2. .The ETC "backbone" freeway should be modeled at two lanes
greater than LOS D to further reduce the spillage over to
adjacent arterials.
3. Local connectors to the ETC should be limited so as to
reduce the surface street spillage.
·
The funneling effect ~f the Westernileg into the Tustin
Plain and into the Transition area at the I-5 with
inadequate relief on the lower Jamboree Road (which is
planned as arterial level only) within.two miles of I-5 and
SR55 interchange does not logically fit. Additional studies
need to conclusively prove the need for such a funnel.
ETC
Brooks
Page 4
e
The modeling of traffic volumes needs close scrutiny because
of the large variances as demonstrated in earlier work as
'presented by Austin Foust, The City of Irvine, and The
County of Orange engineers. The public should be invited to
critically review these models and only one set of traffic
demands be used for any and all discussions on traffic.
·
The data base for modelling should be revised to new numbers
that are available as of December 198S (OCTC is usin~ in
their.20 year plan) whidh show a 20 year increase in the
north county/south county of 400,000/400,000 new residents
and 310,000/270,.000 new employment. The largest employment
center is now projected to be the Anaheim Stadium area.
Such equal growth along'with a suzl~rising major employment
center casts some doubt on previous findings.
·
There appears to be significant changes in land use
densities developing, for example, the East Orange Bowl may.
be only half the density as originally planned. Such
changes need to be included.
·
FINANCING
1.
The method of financing will have a definite impact on
traffic demands. If dual facilities are built, users will
find methods to avoid the more costly tollways and use
parallel ~rterials. This must be studied for the Eastern
and Western Legs.
Z
o ..~ . .~,,..: :.~ ILl
,f.":~ .~,..., .~,
. ·
·".~'-' ~ ~
.'.'". ~! i,~:i ~'w
.. · ..~
! :. \,
,.,