AUTHORIZATION TO ADVERTISE FOR BIDS - 6TH STREET AND PACIFIC
STREET STORM DRAIN IMPROVEMENTS (FILE NO. 1408)
RE COMMENDAT I ON:
It is recommended tha.t the Tustin City Council at their meeting of May
1, 1989 adopt the attached resolution approving the plans and
specifications for subject project and directing the City Clerk to
advertise for bidsi
BACKGROUND:
This project encompasses the installation of stormdrain pipe, junction
structures, and catch basins on 6th Street from "B" Street westerly to
the cul-de-sac, and on Pacific Street from Main street to 6th Street.
This work will also include construction of new curb and gutter and new
street pavement grades at several locations within the project limits.
There is presently $285,700.00 allocated in Fiscal Year 1988-89 budget
for the above-mentioned locations. Below is the tentative schedule for
this project:
Authorization to advertise for bids .................
let legal advertisement .............................
2nd legal advertisement .............................
Bid opening. .........................................
Award contract ..............
Begin construct~ (depends
Complete construction
5-01-89
5-11-89
5-18-89
6-13-89
6-19-89
7-10-89
(65 working days) ............. 10-06-89
Bob Ledendecker
Director of Public Works/City Engineer
BL:SW:mv
Attach.
Steve Worrall
Associate Civil Engineer
1
5
6
?
$
9
10
11
12
13
15
16
17
18
19
20
21
25
26
25
RESOLUTION NO. 89-54
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUSTIN, CALIFORNIA, .APPROVING PLANS AND
SPECIFICATIONS FOR CONSTRUCTION OF STORM DRAIN
IMPROVEMENTS ON 6TH AND PACIFIC STREETS, AND
AUTHORIZING ADVERTISEMENT FOR BIDS
WHEREAS, it is the intention of the City Council of
the City of Tustin, California, to contract for construction of
storm drain improvementS on 6th and Pacific streets; and
WHEREAS, the City Engineer has presented plans and
specifications for the construction of said work;
NOW THEREFORE, BE IT RESOLVED that the plans and
specifications presented by the City Engineer be and are hereby
approved as the plans and specifications for:
Construction of storm drain improvements on
6th and Pacific streets.
BE IT FURTHER RESOLVED that the City Clerk is hereby
authorized and directed to advertise as required by law for the
receipt of sealed bids or proposals for the doing of the work
specified in the aforesaid plans and specifications;
BE IT FURTHER RESOLVED that this project is
categorically exempt from the requirements of the California
Environmental Quality Act; Class I: Existing Facilities.
PASSED AND ADOPTED at a regular meeting of the City
Council of the City of Tustin, held on the day of
, 1989.
ATTEST:
Mayor
MARY E. WYNN
City Clerk