HomeMy WebLinkAboutCC 13 DRAINAGE IMPROV 02-05-90V 51 C $6T °CALENDAR N0. 13 2=5-90 DATE: JANUARY 19 , 1990 \A*t ,e/ Inter - CONI TO: WILLIAM HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: ACCEPTANCE OF PUBLIC GRADING AND DRAINAGE IMPROVEMENTS ALONG JAMBOREE ROAD BETWEEN TUSTIN RANCH ROAD AND SANTIAGO CANYON ROAD (RELOCATED) RECOMMENDATION: That the Tustin City Council adopt the attached resolution accepting works of improvement and authorizing the recordation of the notice of completion for grading and drainage improvements along Jamboree Road between Tustin Ranch Road and Santiago Canyon Road (Relocated). Assuming no claims or stop payment notices are filed, it is further recommended that, 30 days after the date of recordation of the notice of completion, the Council authorize payment of the final 5% retention amount of $495,314.94. This amount, together with previous payments of $9,410,983.81, represents 100% of the final contract amount of 91906,298.75. BACKGROUND: The subject project consists of grading and drainage improvements along Jamboree Road between Tustin Ranch Road (Station 211+00±) and Santiago Canyon Road/Relocated (Station 394+93 ), a distance of 3.5 miles. The project was located within two jurisdictions, the City of Orange and the City of Tustin, with Tustin acting as the lead agency for the project. On October 2, 1989, the City Council accepted a portion of this grading and drainage work within the City of Tustin between Tustin Ranch Road (Sta. 211+00±) and the northerly city limits (Sta. 309+80±). This early acceptance of a portion of the contract was initiated so that the street paving and utility contract could be accelerated to provide a June 1990 completion date for the entire project. This project is funded by the following assessments districts in both cities: AD No. 86-1 City of Orange AD No. 86-2 City of Tustin/City of Orange AD No. 86-1 is located solely within the jurisdiction limits of the City of Orange while AD No. 86-2 is located in both the jurisdictions of Orange and Tustin. Assessments for funding the project costs are applied to each assessment district within each respective jurisdiction. Each of the local agencies' general funds will not be impacted. DISCUSSION: This project has now been completed by the contractor, E. L. Yeager Construction Company, to the satisfaction of the Public Works Departments in both the City of Orange and the City of Tustin. JAMBOREE ROAD DRAINAGE AND GRADING IMPROVEMENTS JANUARY 191 1990 PAGE 2 The final contract amount for this project is $9,906,298.75 which represents a contract overrun of 67.49% over the original contract amount of $5,914,489.60. There were twenty-seven contract change orders on this project totaling $3,991,809.15. A recap of each change order is outlined on the attached Exhibit "A". Sufficient funds existing in both AD 86-1 (Orange) and AD 86-2 (Orange/Tustin) are enough to cover the entire cost of the project. The larger contract change orders were caused by unforeseen geotechnical conditions requiring additional excavation and recompaction of cut slopes in two major locations, retaining walls, and additional pipe" °encasement for the protection of three major water lines as well as the increase in scope of the project. The City Council has been previously advised of these change orders as they occurred. The increase in project scope included approximately 1,700 additional lineal feet of roadway grading which was to have been completed under a separate ..contract. she total project costs inclusive of contract change orders will be spread throughout the AD No. 86-2 assessment boundary areas based upon the original Engineer's Report for the formation of the District. It is requested that the Tustin City Council pass and adopt the attached resolution accepting the works of improvement and authorizing the, recordation of the notice of completion for the grading and drainage improvements along Jamboree Road between Tustin Ranch Road and Santiago Canyon Road (Relocated). Bob Leden ecker Director of Public Works/City Engineer BL:mv Attach. EXHIBIT "A" RECAP OF CONTRACT CHANGE ORDERS YEAGER CONTRACT JAMBOREE ROAD C.C.O. DESCRIPTION AMOUNT 1. Extend 72" RCP in Jamboree Road around corner into Tustin Ranch Road $ 30,272.00 2. Removal & replacement of slope failure (Sta. 223± to 233± ) 466, 044.00 3. Removal of large rock from Disposal Area #1 (Requested by ICDC) 11905.50 4. Removal of wet alluvial material Sta. 320±- 323±, placement of aggregate as stabilizing agent 65,769.67 5. Relocation of utilities at Sta. 332± for EOCWD and Cable TV 28,155.00 6. Modify various junction structures (21000.00) 7. Relocation of blow -off assembly & M.H. at Sta. 272± 68,793.00 8. Instl casing for future MWDOC line at Sta. 272± (Paid for by MWDOC) 198,226.00 9. Encasement of IRWD line at Sta. 272± 55,619.00 10. Reduce height of catch basins (7,120.00) 11. Set-up aux. trailer at T.R.R. & Irvine Blvd. 41147.81 12. Field correction of RCP defects from manufacturer 11432.00 13. Construct access roads for MWDOC and EOCWD facilities 34,534.76 14. Remove culvert at Sta. 367+50 and dig soil test pit at Sta. 378+50 31593.00 15. Roadway excavation N/O of Chapman Ave.(Relocated) 922,595.46 16. Hydro -seed slopes 82,197.72 17. Relocate fence at MWDOC control facility 11460.50 0 _EXHIBIT "A" ".ECAP - JAMBOREE ROAD CONTRACT CHANGE ORDERS ,anuary 19, 1990 Page 2 C.C.O. I DESCRIPTION AMOUNT 18. Change grade of G-1 storm drain $ 43,245.53 19. Ranch access roads (eliminate access from Jamboree Road in two locations) 4,556.00 20. Grout rip -rap 81479.33 21. Construct buttress bet. Sta. 329± to 341± 398,029.30 22. Construct raised median 67,655.00 23. Lower grade of road over water lines 11442,500.00 24. Construct sub -drain Sta. 332± to 341± 48,413.95 25. Time extension -0- 26. Clean out 78" RCV in Tustin Ranch Road 31010.00 27. Additional drainage facilities and three air release valves for EOCWD 81570.18 t r1l 5 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 90-22 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN ACCEPTING WORKS OF IMPROVEMENT AND AUTHORIZING RECORDATION OF NOTICE OF COMPLETION FOR GRADING AND DRAINAGE IMPROVEMENTS ALONG JAMBOREE ROAD BETWEEN TUSSTIN RANCH ROAD AND SANTIAGO CANYON ROAD (RELOCATED) WHEREAS, E. L. Yeager Construction Company, Inc., having a contract with the City of Tustin to construct the hereinafter described public work and improvement; and WHEREAS, the City Engineer has duly certified to the construction- and completion of said public improvements hereinafter mentioned in manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the notice of completion and acceptance of said public work and improvement should be filled and payment of the., balance due said contract authorized in accordance with the contract documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public work and improvement be, and the same is hereby accepted. Said public work and improvement is more particularly described as follows: Grading and Drainage Improvements Along Jamboree Road Between Tustin Ranch Road and Santiago Canyon Road (Relocated) AND BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin be, and is hereby authorized to execute and file a notice of completion and acceptance of said public work and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council lof the City of Tustin on February 5L 1990. Richard B. Edgar Mayor ATTEST: Valerie Whiteman, Acting Chief Deputy City Clerk for Mary E. Wynn, City Clerk City of Tustin RESOLUTION CERTIFICATION Is STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) RESOLUTION NO. 90 - MARY E. WYNN, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, does hereby certify that the whole number of the members of the City Council of the City of Tustin is four; that the above and foregoing Resolution No. 90- was duly and regularly introduced, passed and adopted at a regular meeting of the City Council held on the 5th day of February. 1990, by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: Valerie Whiteman, Acting Chief Deputy City Clerk for Mary E. Wynn, City Clerk 0