HomeMy WebLinkAboutNB 2 ASSET FORFEITURE 05-07-90DATE:
TO
FROM:
SUBJECT:
APRIL 23, 1990
WILLIAM A. HUSTON, CITY MANAGER
POLICE DEPARTMENT
ASSET FORFEITURE APPROPRIATIONS
Recommendation:
NL .BUSINESS NO. 2
5/7/90
Inter -Com
City Council appropriate $182,790.00 from the existing
Narcotic Asset Forfeiture Trust Fund to purchase the below
listed narcotic enforcement related items.
Background:
On 6/2/86, Resolution 86-69 was adopted which authorized
the expenditure of monies garnered throughthe Asset For-
feiture Funds Program. This money was to be used to
assist with narcotics investigations. We currently have
in excess of $300,000 on hand in this account, with an
additional $150,000 due over the next year and -a -half. We
would like to purchase the items as listed on the attached
sheet over the next six months in order to enhance our
Department's enforcement efforts throughout the
community.
Thanks for your consideration.
6A. cle_�
W. DOUGLAS FRANKS
Chief of Police
WDF:dh
Asset Forfeiture Appropriations
April 23, 1990
Page 2
1. Two tactical entry shields, 19" X 36".
These entry shields are for specific use when forced
entry is necessary into a location where there are
known weapons. This shield is water resistant, comes
in a non -glare black matte finish, and has a Level
III A rating, which is the highest rating given.
This shield will stop anything from a 38 special with
a 158 grain lead bullet to a 12 guage 00 buck shotgun
shell. This product catches the bullet inside the
shield, therefore eliminating ricochets which could
be extremely dangerous. These shields will provide a
necessry tactical tool for our narcotic officers and
patrol officers alike, in these times when sophisti-
cated weaponry is becoming more and more prevalent.
$1,145.00 each.
Total Cost $2,290.00
2. DARE/Community Resources van.
Our existing van is a 1981 full-size enclosed van.
It is very difficult for employees to drive due to
lack of windows and its size. There is also no
community identification due to the color of the van
and lack of appropriate markings. It is proposed to
trade in the existing van for one of the new style
mini -vans (Caravan, Aerostar, etc.) and clearly mark
it, with light bar and paint, as a police vehicle.
This will be used to carry the DARE equipment and
other youth/community program equipment for the
Community Resources Section. Our existing van would
be used for trade-in.
Total Cost $20,000.00
3. TV/VCR
For use at community awareness/education programs and
youth programs, expos, and recruitment. This equip-
ment will allow a compact and efficient way to show
video tapes at various activities. The one currently
in use is of very early vintage and operational
problems are being experienced. The need for two has
clearly been present for some time.
Total Cost $1,500.00
Asset Forfeiture Appropriations
April 23, 1990
Page 3
4. Narcotic Purchase/Surveillance Equipment, including:
a. Body wire and recorder unit for use in recording
conversations in undercover narcotics
operations. $3,500.00.
b. Night scope and binoculars for use in surveill-
ance during hours of darkness in undercover
operations. $5,400.00.
C. Photographic equipment, including 35mm camera
and lenses necessary for surveillance and other
narcotic enforcement activity. $1,000.00.
d. Four entry vests to be used by members of the
Narcotics Unit for forced entry and serving of
search warrants in residences. These entry
vests differ from the tactical entry shields in
that they are soft vests worn by the officer.
leaving both hands free. $800.00 each.
Total Cost $3,200.00
e. Surveillance Van Modifications.
Modifications necessary for using our present
van for extended surveillance. These modifica-
tions include window tinting, short term rest
room facilities, AC/DC capabilities, including
spare battery to enable use of electrical
equipment inside for extended surveillances and
a general interior overhaul.
Total Cost $2,700.00
Total Cost Section 4 $15,800.00
5. Display Equipment.
This will be used in youth programs and other school
community events to bring drug awareness and other
departmental messages to the community. Included in
this is a portable display and the equipment
necessary to transport it.
Total Cost $2,500.00
Asset Forfeiture Appropriations
April 23, 1990
Page 4
6. Two personal computers, printers, and software
necessary to process information in the Special
Investigations Sections and in the Community
Resources Section. Software includes the data base
processing and desk top publishing type software to
allow us to more cost efficiently get information out
in our community programs.
Total Cost $15,000.00
7. Narcotics Evidence Storage.
Presently the Police Department is using off-site
storage. This is less than satisfactory in that
security in the storage rental areas is questionable.
The Department's storage locker has been burglarized
once. There is available a portion of the Public
Works warehouse for this evidence storage,
eliminating the cost and many of the problems of
the off-site storage. The money is necessary is
to build a secure enclosure in the Public Works
warehouse for this evidence storage.
Total Cost $7,000.00
8. Two portable cellular phones.
This will allow Special Investigations the avail-
ability of each Special Investigator to have the
benefits of a cellular phone which is most beneficial
during surveillances and other narcotic enforcement
activities. $1,250.50 each.
Total Cost $2,500.00
9. Fiberglass rear unit seats.
Presently we use the standard vehicle seat in the
rear of the marked police units. This causes
difficulty when we transport prisoners in that the
seat is very difficult to secure and evidence or
other contraband can be secreted under the seat
cushion by suspects. The fiberglass seats are one
piece molded seats which allow for easy cleaning and
better security in the rear of the marked police
unit. $500.00 each.
Total Cost $10,000.00
Asset Forfeiture Appropriations
April 23, 1990
Page 5
10. Recruitment Equipment.
Presently our narcotic enforcement efforts are
hampered most by the difficulty in recruiting
qualified personnel. The equipment proposed, which
includes a Scantron test scoring system and costs
incurred in completing a Police Department Brochure,
will allow us to expedite this recruitment process.
The Scantron will enable us to score the test
immediately upon completion. Therefore the delay
between the written test and continuation of the
process (currently in the area of two to three weeks)
will be eliminated. Utilization of this equipment
will allow us to give the written test, physical
agility test, and oral interview the same day. Back-
grounds can then be started immediately.
The Recruitment Brochure will be professionally
produced, displaying the Tustin Police Department in
its best light for today's market.
Total Cost $8,000.00
11. Community Services Officer -- Drug Programs
Our present CSO handles the business community cable
television show and a part of the school programs.
An additional CSO is needed to assist in the school
programs, parent -teachers associations, and other
special details necessary to continue to get our
youth and community awareness programs to the
community.
Total Cost $35,000.00
12. DARE Officer.
Our existing DARE Officer is working full time with
his DARE Programs. The need for a second school
resource/DARE Officer has become obvious. This DARE
Officer will function as a backup to the existing
officer and provide the necessary liaison with the
schools on a full-time basis.
Total Cost $60,000.00
GRAND TOTAL COST $182,790.00