Loading...
HomeMy WebLinkAboutNB 3 CITIZEN CONCERN 05-07-90DATE: TO: FROM: MAY 1, 1990 -90 WILLIAM HUSTON, CITY MANAGER NEW BUSINESS N0. 3 5/7/90 Inter - Com PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: CITIZEN CONCERN - 13895 BROWNING AVENUE (HUBER PARCEL) RECOMMENDATION: Pleasure of the City Council. BACKGROUND: At the April 17, 1990 City Council meeting, Mr. Huber raised a concern about the City's reaction to the recent driveway construction at his property located at 13895 Browning Avenue. The private driveway in question was constructed within the public street right-of-way without a permit and is a potential hazard to motorists. DISCUSSION: Subject portion of Browning Avenue was included in Annexation No. 135 which became a part of the City of Tustin on October 2, 1985. Following the annexation, some HCDA monies were transferred from Orange County to the City of Tustin to fund storm drain and street improvements on interior streets in the neighborhood (Sierra Vista Drive, Karen Way and Jan Marie Place). No monies were available for the improvement of Browning Avenue, an arterial highway. Improvements on the interior streets were completed by City contract in 1987. Browning Avenue from 165' SIO Jan Marie Place to E1 Camino Real is not built to secondary highway standards, and approximately 150' of the highway, including subject property frontage, has no curb and gutter at all. In order to widen Browning Avenue to ultimate secondary highway standards, it would be necessary to acquire an additional seven feet of right-of-way from five parcels between Jan Marie Place and El Camino Real. Ultimate improvements can be built without impacting any existing structures. The cost to construct ultimate street improvements is estimated to be $116,000. Ultimate improvements along this segment of Browning Avenue would place the sidewalk and curb/gutter at a very close distance to the three adjacent residential structures southerly of the Huber parcel. Additionally, driveway access to the parcel on the northerly side of Sierra Vista would be adversely impacted. An additional alternative would be to complete the curb and gutter, driveway and street pavement improvements at the interim location of 18 feet westerly of street centerline within the existing street right-of- way. These interim improvements would not include sidewalks, but would provide adequate street drainage and remove the potential hazard created by the un -permitted driveway at 13895 Browning Avenue. It is estimated that these interim improvements would cost $16,000.00. CITIZEN CONCERN - HUBER PARCEL MAY 1, 1990 PAGE 2 Included with this report for review are sketches of the ultimate and interim project proposals, cost estimates of each, and copies of assessor plats and aerial photographs of the area. e,-, �' '-z' /'., , & '/z , , Bob Ledendecker Director of Public Works/City Engineer BL: my Attach. I JAN MARIE PLACE ESI ST • I I I .. . • ...N f c.` j 4d • I I,I �I W � i iVi' I N•"r 5. Ld ,Lco QP 6-ow5TKUGT c4 v I I I ZUNI VI It SoIN Z • l Exl 5Y. c cp I cc I w l • js� I I I SERRA VISTA DR 1 I, 3V ' EL CAMINO REAL ' t 1-5 BROWNING AVE. _ 165' SOUTH OF JAN MARIE PL TO EL CAMINO REAL INTERIM IMPROVEMENTS q . JAN MARIE PLACE Vtos� V �- ft � P _epoir ucr c u LTI MIATE K/w %.— EXIST. Ga ,� CvNsTKU(IT CIS coNsTRucT . CAUM 6A51 N SIERRA VISTA DR. x w COW 5TKucf C 4 I,L t~ i c,�p NS -f Q u CT c.ATc4i DA51 N ULTIMATE R/w EL CAMINO REAL BROWNING AVE. 165' SOUTH OF JAN MARIE PL. TO EL CAMINO REAL ULTIMATE IMPROVEMENTS BROWNING AVENUE - 165' SIO JAN MARIE PLACE TO EL CAMINO REAL - WEST SIDE A. Construct ultimate street improvements assuming no R/W cost. Clear & Grub L.F. L.S. @ $5,000 $ 5,000 Excavate 640 C.Y. @ 18 11,520 Curb & Gutter 520 L.F. @ 15 71800 A.C. Pavement 200 Ton @ 50 10,000 Base Material 700 Ton @ 18 12,600 Catch Basin 2 EA. @ 41000 81000 18" R.C.P. 70 L.F. @ 75 51250 Sidewalk 31900 S.F. @ 3 11,700 Driveway 11125 S.F. @ 4.5 51060 Street Lights 3 EA. @ 800 21400 Conduit 500 L.F. @ 20 10,000 $ 89,330 Engr. & Cont. 30% 26,670 B. Construct interim street curb and driveway to join existing substandard improvements. Curb & Gutter 150 L.F. @ $ 25 $ 3,750 A.C. Pavement 450 S.F. @ 7 3,150 Driveway 450 S.F. @ 9 41050 $10,950 Engr. & Cont. 50% 51050 M O -70 V V 3A18G _31YdW NVP VI SIA VYY3/S h 7 0/✓ / PV V 0 73 .lb'M338-Y b'Nb' tl1Nb'S OVObl NOSSIN v Z0 ac 17 ,Ob .Ef I ." 7 V :m .0 V t z ` 7 V) u; S In a G W 0- 0 O 141- -IR -IR Q Q, \ W h z Q ICA tA JI 'I !, � - Ar�,, '