MAY 1, 1990
-90
WILLIAM HUSTON, CITY MANAGER
NEW BUSINESS N0. 3
5/7/90
Inter - Com
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: CITIZEN CONCERN - 13895 BROWNING AVENUE (HUBER PARCEL)
RECOMMENDATION:
Pleasure of the City Council.
BACKGROUND:
At the April 17, 1990 City Council meeting, Mr. Huber raised a concern
about the City's reaction to the recent driveway construction at his
property located at 13895 Browning Avenue. The private driveway in
question was constructed within the public street right-of-way without a
permit and is a potential hazard to motorists.
DISCUSSION:
Subject portion of Browning Avenue was included in Annexation No. 135
which became a part of the City of Tustin on October 2, 1985. Following
the annexation, some HCDA monies were transferred from Orange County to
the City of Tustin to fund storm drain and street improvements on
interior streets in the neighborhood (Sierra Vista Drive, Karen Way and
Jan Marie Place). No monies were available for the improvement of
Browning Avenue, an arterial highway. Improvements on the interior
streets were completed by City contract in 1987.
Browning Avenue from 165' SIO Jan Marie Place to E1 Camino Real is not
built to secondary highway standards, and approximately 150' of the
highway, including subject property frontage, has no curb and gutter at
all. In order to widen Browning Avenue to ultimate secondary highway
standards, it would be necessary to acquire an additional seven feet of
right-of-way from five parcels between Jan Marie Place and El Camino
Real. Ultimate improvements can be built without impacting any existing
structures. The cost to construct ultimate street improvements is
estimated to be $116,000. Ultimate improvements along this segment of
Browning Avenue would place the sidewalk and curb/gutter at a very close
distance to the three adjacent residential structures southerly of the
Huber parcel. Additionally, driveway access to the parcel on the
northerly side of Sierra Vista would be adversely impacted.
An additional alternative would be to complete the curb and gutter,
driveway and street pavement improvements at the interim location of 18
feet westerly of street centerline within the existing street right-of-
way. These interim improvements would not include sidewalks, but would
provide adequate street drainage and remove the potential hazard created
by the un -permitted driveway at 13895 Browning Avenue. It is estimated
that these interim improvements would cost $16,000.00.
CITIZEN CONCERN - HUBER PARCEL
MAY 1, 1990
PAGE 2
Included with this report for review are sketches of the ultimate and
interim project proposals, cost estimates of each, and copies of
assessor plats and aerial photographs of the area.
e,-, �' '-z' /'.,
, & '/z , ,
Bob Ledendecker
Director of Public Works/City Engineer
BL: my
Attach.
I
JAN MARIE PLACE ESI ST • I I I
.. . • ...N f c.`
j 4d
• I I,I �I
W � i iVi' I N•"r 5.
Ld
,Lco
QP
6-ow5TKUGT c4 v I I I
ZUNI VI
It SoIN Z • l
Exl 5Y. c cp
I cc I w l •
js� I I I
SERRA VISTA DR
1 I,
3V '
EL CAMINO REAL ' t
1-5
BROWNING AVE. _
165' SOUTH OF JAN MARIE PL TO EL CAMINO REAL
INTERIM IMPROVEMENTS
q
. JAN MARIE PLACE
Vtos� V
�- ft
� P _epoir ucr c
u LTI MIATE K/w %.—
EXIST. Ga ,�
CvNsTKU(IT CIS
coNsTRucT .
CAUM 6A51 N
SIERRA VISTA DR.
x
w
COW 5TKucf C 4
I,L
t~
i
c,�p NS -f Q u CT
c.ATc4i DA51 N
ULTIMATE R/w
EL CAMINO REAL
BROWNING AVE.
165' SOUTH OF JAN MARIE PL. TO EL CAMINO REAL
ULTIMATE IMPROVEMENTS
BROWNING AVENUE - 165' SIO JAN MARIE PLACE
TO EL CAMINO REAL - WEST SIDE
A. Construct ultimate street improvements assuming no R/W cost.
Clear & Grub
L.F.
L.S.
@ $5,000
$ 5,000
Excavate
640
C.Y.
@ 18
11,520
Curb & Gutter
520
L.F.
@ 15
71800
A.C. Pavement
200
Ton
@ 50
10,000
Base Material
700
Ton
@ 18
12,600
Catch Basin
2
EA.
@ 41000
81000
18" R.C.P.
70
L.F.
@ 75
51250
Sidewalk
31900
S.F.
@ 3
11,700
Driveway
11125
S.F.
@ 4.5
51060
Street Lights
3
EA.
@ 800
21400
Conduit
500
L.F.
@ 20
10,000
$ 89,330
Engr.
& Cont.
30%
26,670
B. Construct interim street curb and driveway to join existing
substandard improvements.
Curb & Gutter 150
L.F.
@ $ 25
$ 3,750
A.C. Pavement 450
S.F.
@ 7
3,150
Driveway 450
S.F.
@ 9
41050
$10,950
Engr.
& Cont.
50%
51050
M
O
-70 V V
3A18G
_31YdW NVP
VI SIA VYY3/S h
7 0/✓ / PV V 0 73
.lb'M338-Y b'Nb' tl1Nb'S
OVObl NOSSIN
v
Z0 ac 17
,Ob
.Ef I ."
7
V
:m .0 V
t
z `
7
V) u; S
In a G
W
0-
0
O 141-
-IR
-IR Q Q,
\ W
h
z
Q
ICA
tA
JI
'I !, � - Ar�,,
'