HomeMy WebLinkAboutRDA CIVIC CTR EXPAN. 10-01-90RECOMMENDATION It is recommended that the Agency approve a contribution to the County Library for design costs of the Civic Center Library facade modifications not to exceed $50,000, subject to conditions contained herein. BACKGROUND The Orange County Library Department has reviewed and supports the proposed changes to the Civic Center site as the changes affect Library parking. Amendments to the current Library lease will be negotiated prior to initiation of the bid process for the Civic Center project. While the County Library has considered refurbishment of their Tustin facility as part of their Capital Improvement program, their current budget does not include design costs for the modification to the facade of the Library to establish architectural compatibility with the proposed modifications to the Civic Center. The County has met with John Bates, the architect preparing the City's remodeling plans to discuss alternatives regarding the Library facade renovation. In conversations with Mr. Bates, possible exterior alterations to the building that will be necessary include the following: 1. Replace the entire building stucco surface including scoring and removal of existing natural wood fascia. Substitute trellis with similar stucco detail as incorporated in the Civic Center. 2. Replace existing roof tile with the same concrete roof tiles as used on the Civic Center remodel. Note: at the same time replacing broken material. 3. Develop exterior statement which reflects elements used at REDEVELOPMENT A�GEN� N0. 5 DATE: OCTOBER 1, 1990 .� Inter - Com WILLIAM HUSTON, EXECUTIVE DIRECTOR TO: COMMUNITY DEVELOPMENT DEPARTMENT FROM: CIVIC CENTER EXPANSION - LIBRARY DESIGN COSTS SUBJECT: RECOMMENDATION It is recommended that the Agency approve a contribution to the County Library for design costs of the Civic Center Library facade modifications not to exceed $50,000, subject to conditions contained herein. BACKGROUND The Orange County Library Department has reviewed and supports the proposed changes to the Civic Center site as the changes affect Library parking. Amendments to the current Library lease will be negotiated prior to initiation of the bid process for the Civic Center project. While the County Library has considered refurbishment of their Tustin facility as part of their Capital Improvement program, their current budget does not include design costs for the modification to the facade of the Library to establish architectural compatibility with the proposed modifications to the Civic Center. The County has met with John Bates, the architect preparing the City's remodeling plans to discuss alternatives regarding the Library facade renovation. In conversations with Mr. Bates, possible exterior alterations to the building that will be necessary include the following: 1. Replace the entire building stucco surface including scoring and removal of existing natural wood fascia. Substitute trellis with similar stucco detail as incorporated in the Civic Center. 2. Replace existing roof tile with the same concrete roof tiles as used on the Civic Center remodel. Note: at the same time replacing broken material. 3. Develop exterior statement which reflects elements used at City Council Report October 1, 1990 Page 2 primary entries to Community center and City Hall. Add colonnade elements to primary elevation(s). 4. As a corollary of entry statement development, remove/replace windows or refinish same to blend with new Civic Center. 5. Upgrade landscaping and flatwork treatment to blend with Civic Center. The preliminary construction costs of the foregoing appear to range from approximately $250,000 to approximately $330,000. These costs are preliminary, predicated on conceptual ideas rather than construction documents. The County has indicated that they would like to utilize the services of Mr. Bates. However, at this time their budget does not permit them to secure services from Mr. Bates. They are, therefore, requesting that Tustin consider providing the fee for architectural services for Library facade modifications. Average architectural design services would normally range from 8 to 10 percent of construction costs with additional minor reimbursable costs for plan reproduction, etc. Proposed improvements to the Library facade will significantly improve the appearance of the entire Civic Center site. Redevelopment Agency staff would, therefore, support the Library's request provided that any design cost contributions are limited to the County utilizing the services of John Bates Associates, costs do not to exceed a total amount of $50,000 and no funds are released to the County until a modification to our current Lease Agreement is approved by the County Board of Supervisors. Christine Shingleton Director of Communit Development CAS:kf/ccexpan.cas Community Development Department