Loading...
HomeMy WebLinkAboutRPT 2 INSTL BIKE LANE 11-05-90DATE: TO: FROM: �- 0/ OCTOBER 29, 1990 WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION REPORTS NO. 2 11-5-90 Inter - Com SUBJECT: REQUEST TO INSTALL BIKE LANE ON EL CAMINO REAL BETWEEN BROWNING AND JAMBOREE RECOMMENDATION: Receive and file. BACKGROUND: E1 Camino Real is currently striped for two lanes of traffic in each direction, with the outside lane being 14 feet in width. The existing right- of-way does not provide adequate room to install a bike lane on either side of El Camino Real. DISCUSSION: Engineering staff will look into possible alternative routes in the Tustin Ranch area. Bob Ledendecker Director Public Works/City Engineer BL: SD: ccg Sandra Doubleday Engineering Consultant