HomeMy WebLinkAboutCC 7 IMPROVEMENT BDS 12-17-90'-=� -- 3 0 DATE: DECEMBER 10, 1990 TO: WILLIAM A. HUSTON, CITY MANAGER CONSENT CALENDAR NO. 7 12-17-90 Inter - Com FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: REDUCTION OF IMPROVEMENT BONDS FOR TRACT NO. 12870 RECOMMENDATION: That the Tustin City Council authorize the release of Faithful Performance Bond No. 5241-05-98 in the amount of $11,540,526.00 and Labor and Materials Bond No. 5241-05-98 in the amount of $5,770,263.00 subject to the posting of replacement bonds for the six public streets and the three private streets in amounts to be determined by staff to cover the cost of all remaining improvements with Tract No. 12870. BACKGROUND: The Irvine Company, as the developer of Tract No. 12870, was required to post certain bonds to ensure the completion of the required public improvements within Tract No. 12870. These improvements include sidewalks, curb and gutter, street paving, street lights, landscaping, telephone and electric utilities, natural gas, domestic water, reclaimed water, sewer and storm drain facilities on the following public streets: * Robinson Drive between Irvine Boulevard and Jamboree Road. * Keller Drive between Robinson Drive and Jamboree Road. * Greenway Drive between Tustin Ranch Road and La Colina Drive. * La Colina Drive between Greenway Drive and Tustin Ranch Road. * Gallery Way between Tustin Ranch Road and Rawlings Way. * Rawlings Way between Gallery Way and Township Way (formerly Fairgate) The following private streets which were formerly public streets: * Township Way (formerly Fairgate) between Tustin Ranch Road and the northerly boundaries of Tract No. 12870. * Rawlings Way between Township Way and approximately 300 feet easterly. * Champion Way westerly of Jamboree Road. The following improvement bonds were posted on these streets: TYPE NUMBER AMOUNT Faithful Performance 5241-05-98 $11,540,526.00 Labor and Materials 5241-05-98 51770,263.00 Subdivision Warranty 5241-05-99 11154,052.60 Monumentation 5241-21-50 65,000.00 DISCUSSION: The Irvine Company has requested that the Faithful Performance and Labor and Materials Bonds be reduced to an amount to cover the costs of the remaining improvements. These remaining improvements are minor and basically consist of street lighting and the final wearing course of asphaltic concrete pavement. The cost to complete these improvements will be estimated by staff. As a result of the slowing economy, it is anticipated that the buildout of the residential units adjacent to these streets will take three to four years. It has been our City's practice to delay the final course of asphaltic concrete placement until most of the development is completed. Staff concurs with the release of the existing two bonds, subject to the posting of two new bonds (Faithful Performance and Labor and Materials) for the public streets and the posting of two new bonds (Faithful Performance, and Labor and Materials for the three private streets with the new bond amounts being determined by staff. Robert Ledendecker Director of Public Works/City Engineer RL:ccg