HomeMy WebLinkAboutCC 8 LOSSAN CORR RR 10-02-89)ATE: SEPTEMBER 27, 1989
CONSENT CALENDAR
NO. 8
10-2-89
Inter - Com
TO: WILLIAM HUSTON, CITY MANAGER
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: LOSSAN CORRIDOR RAILWAY IMPROVEMENTS AT RED HILL AVENUE
RECOMMENDATION:
That the Tustin City Council at their meetingbf October 2, 1989 approve
a change in dates for planned improvements to the AT&SF Railroad
crossing at Red Hill Avenue. It is recommended that the closure of Red
Hill Avenue be implemented on the weekend beginning Friday evening at
10:30 p.m., October 27, 1989 through Sunday afternoon at 3:00 p.m.,
October 29, 1989 instead of the weekend of October 6th through October
8th.as initially proposed.
A copy of the press release and alternate routes sketch informing the
public of this proposed work is attached for your information.
BACKGROUND:
At their meeting of September 18, 1989, the City Council approved
implementation of the Plan C (total closure) program for improving the
Atchison, Topeka and Santa Fe Railroad (ATSF) crossing at Red Hili..
Avenue from Friday, October 6, 1989 through Sunday, October 8, 1989
( copy of staff report attached) .
Since that meeting, AT&SF officials have asked that the City consider
changing the previously approved dates for the construction to Friday,
October 27 through Sunday, October 29 in order to allow more time for
the extensive coordination required to implement this work. City staff
is in concurrence with this request and feels that a change in dates
will improve the effectiveness of the public notification process by
providing an additional period of time prior to the roadway closure.
It' should be noted that the details for provision, at all times during
construction, of a viable emergency
Avenue are being finalized. In
program to route traffic around the
signing program are being developed.
access across the tracks at Red Hill
addition, a detailed detour signing
closure and a public notification
A0 /
Bob Ledendecker Dana R. K da
Director of Public Works/City Engineer Engineer' g Sn ices Manager
BL: DRK:mv
Attach.
FOR IMMEDIATE RELEASE
RAILROAD IMPROVEMENTS AT RED HILL AVENUE
The City of Tustin is anticipating major construction to occur
on Red Hill Avenue at the AT&SF Railway crossing. To improve
the existing railway crossing located just north of Edinger,
Tustin will permit the Atchison, Topeka and Santa Fe Railroad
Company to close both sides of Red Hill Avenue between Edinger
Avenue and Service Road. The closure will be implemented Friday
evening at 10:30 p.m., October 27, 1989, and will be removed on
Sunday afternoon at approximately 3:00 p.m., October 29, 1989.
To minimize the inconvenience to motorists over the one weekend
period, a sketch of the closure area has been provided to assist
motorists in developing alternate routes. Appropriate detours
and informational signs will be installed along numerous roadways
in Tustin prior to construction.
6-7
aim 1.
nu
• 1: .-W � ";• .•T �,.✓- _ , tir .�
I �
ROUTES
AVE_
CLOSURE
AT SANTA FE RAILWAY TRACKS
r,
1
tm
L J.. -11
04,
V1.
MCFADPEN kvEi N
WIN I W I N I IN
co
AK -A
Ab.
4f
tv
44 Ab
A4.
A,1
ROAD CLOSED
A* FRIDAY (OCT. 27) 10:30 pm TO`� , � ,,,� '
SUNDAY (OCT. 29) 3:00 pm
(APPROXIMATELY)
LEGEND
viol ALTERNATE
RED HILL AVE. CLOSURE
BETWEEN SERVICE RD.
& EDINGER AVE.
�►LSs�`�► Inter - Com
DATE: SEPTEMBER 15, 1989,
TO: WILLIAM HUSTON, CITY MANAGER
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: LOSSAN CORRIDOR RAILWAY IMPROVEMENTS AT RED HILL AVENUE
RECOMMENDATION:
For review by the City Council at their meeting of September 18, 1989.
Staff would recommend implementation of the Plan C (total. closure)
program for.improving the AT&SF crossing at Red.Hill.Avenue from Friday,
October 6, 1989 through Sunday, October 8, 1989. The City Council is
encouraged to contact staff with any questions or comments and to
indicate their concurrence with the proposal so that notification
signing can be installed as soon as possible.
BACKGROUND:
The Atchison, Topeka and Santa Fe Railway (AT&SF).Company is. -in the
process of upgrading"allroadway railway crossings in Orange County
which do not have rubberized crossing surfaces. This is part of a mayor
improvement program for the entire Lossan Corridor.
The AT&SF crossing of Red Hill Avenue is one of the locations slated tee
be improved. Work will include installation of new ties, rails, ballast
and a rubberized roadway crossing surface.* At -the request of city
staff, alternate plans for performing this work were investigated by
representatives of Santa Fe. They ranged from closing one lane at a
time. on Red Hill ,Avenue for. a period of eighteen days -(Plan A) to . a
complete closure of Red Hill Avenue during one weekend period beginning
at 10:30 p.m. Friday to 3:00 p.m. Sunday (Plan C). A third alternative,
Plan B, was also developed which would close one-half of the roadway
during one weekend and complete the construction the following weekend
by closing the other half of the roadway.
Each of tie plans has its own unique advantages and disadvantages;
however, staff -.-recommends implementatioir--of ' Pian C since it has the
shortest construction period, minimizes potential traffic control safety
problems, and enables the railway company to complete its Lossan track
improvements to higher quality levels. than. would be possible under
either a Plan A or B scenario. Santa Fe is targeting the weekend of
Friday, October 6.through Sunday, October 8, 1989 as their desired time
frame to improve the crossing.
LOSSAN CORRIDOR RAILWAY IMPROVEMENTS
SEPTEMBER 15, 1989
PAGE 2
This would be subject to the concurrence of the City -Council and the
provision at all times during construction for viable emergency access
across the tracks. Notification signing would be placed at key
locations at least two weeks prior to the October 6th date with letters
being sent to adjacent businesses regarding the weekend closure.: In
addition, a detailed detour signing program would be implemented to
route traffic around the closure.
Bob Ledendecker Dana R. Kas n
Director of Public Works/City Engineer Engineerin Serv'ces Manager
BL:DRK:mv
RED HEIL AVENUE CROSSING NO. 2-177.9
• . PROPOSED RENEWAL PLAN C .
This plan is designed to close all of Red Hill•Avenue•starting at
10;30 p.m., Friday night, renewing both North and South tracks in the same man-
ner as Plan B. and being finished about 3;00 p.m. on Sunday afternoon, and the;
street open for traffic. Mlis would require a complete closure. -and detour of .
all traffic. Traffic could be detoured southeast on •
...to Jamboree Boulevard, nOrthGast -on Jamboree Boulevard to-- Avenue and
miles,
northwest on Walnut Avenue to Red Hill Avenue.