Loading...
HomeMy WebLinkAboutCC 3 STREET IMPROV'S 07-18-88 CONSENT CALENDAR DA" ~ _ "~ 7-18-88 __ Inter Corn DATE: JULY 12, 1988 ~ TO: WILLIAM HUSTON, CITY MANAGER F~OM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: AUTHORIZATION TO ADVERTISE FOR BIDS FOR STREET IMPROVEMENTS ON GREEN VALLEY, UTT DRIVE AND PUBLIC ALLEY SOUTH OF BONITA STREET RECOMMENDATION: It is, recommended that the City Council, at their meeting of July 18, 1988 adopt the attached resolution approving the plans and specifications for subject project and directing the City to advertise for bids. BACKGROUND: This project provides for the installation of street improvements on Green Valley, .Utt Drive, and the public alley located south of Bonita Street which runs between Newport Avenue and Orange Avenue. The work on Green Valley and Utt Drive will consist of the complete reconstruction of the pavement section, replacement of deteriorated curb, gutter and sidewalks and construction of new drive aprons and wheelchair ramps as required. The allev improvements will consist of a new concrete gutter down the center of the alley, a new drive apron at Orange Street and asphalt concrete overlay of the existing pavement. There is presently allocated a total of $291,400 in the 1988-89 FY budget for the above-mentioned work. During the design phase of this project, it became apparent that the existing water main on Green Valley was at such a shallow depth and in such poor condition (i.e., old deteriorated 2" galvanized line) that it would be impractical to reconstruct the pavement without replacing said water main. The Engineer's Estimate for this additional water main work is $27,850. Once the bids are tabulated and an exact figure is known, it is recommended that the City Council allocate the required amount from the Water Fund Enterprises Account to cover the cost of these improvements. The tentative schedule for this project is as follows: Authorization to advertise for bids ............... 7/18/88 1st Legal Advertisement ........................... 7/28/88 2nd Legal Advertisement ........................... 8/04/88 Open Bids ......................................... 8/23/88 Award Contract ................... - 9/06/88 Begin Construction ................................ 9/26/88 Complete Construction ................... 12/23/88 r ~'~~~ Worrall Bob Ledendecn Steve Director of Public Works/City Engineer Assistant Civil Engineer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 RESOLUTION NO. 88-85 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR STREET RECONSTRUCTION IMPROVEMENTS ON GREEN VALLEY, UTT DRIVE, AND PUBLIC ALLEY SOUTH OF BONITA STREET, AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS it is the intention of the City Council of the City of Tustin, California to contract construction street improvements on Green Valley, Utt Drive, and the public alley located south of Bonita Street; and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; NOW THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for: Street reconstz-action improvements on Green Valley, Utt Drive, and public alley south of Bonita Street BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications; BE IT FURTHER RESOLVED that this project is categorically exempt from the requirements of the California Environmental Quality act; Class I: Existing Facilities. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin, held on the day of , 1988. ATTEST: RONALD HOESTEREY Mayor MARY E. WYNN City Clerk