Loading...
HomeMy WebLinkAboutCC 6 SR CTR GAS LINE EXT 7-18-8 CONSENT CALENDAR Inter- Com DATE: TO: WILLIAM HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: TUSTIN SENIOR CENTER - CONTRACT FOR GAS LINE EXTENSION RECOMMENDATION: That the Tustin city Council at their meeting of July 18, 1988 approve the Southern California Gas Company Contract No. 05003499/U-37621 and authorize the Mayor to execute said contract. O : BACKGRUND The Tustin Senior Center project will be utilizing natural gas as a utility within the complex at 200 So. "C" Street. Each utility requires the applicant (City) to enter into a contract agreement for extension of main line facility to the requested point of service. DISCUSSION: The subject project falls within the limits of the free allowance (175 L.F.) for main line extensions. Consequently, there are no charges required for this service. The attached contract agreement outlines the routine terms and conditions that the Southern California Gas Company will provide service to the customer. This agreement is a routine service agreement and has been previously executed by the City on various other projects. ~ Bob Le-dendecker Director of Public Works/City Engineer BL:mv CONTRACT FOR EXTEl ;1~ Service I'-1 Main T~, ?PLY: No. Units I Lot(s) ION GAS Service and Main LINE Fo ~No.. 05003499/u-37621 M.E.O. No. .Ti'act No. RESIDENTIAL: I--I Individual r-I Multi-Family I'-I Subdivision I-'l Tract NON.RESIDENTIAL: ~t~, Commercial I-'1 Gas Engine r-I Firm Industrial I'-I Interruptible Address 200 S. C ST. Applicant's Name CITY OF TUSTIN City I'OSTTN AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE Gas Appliances/Equipment to be installed No. Range(s) Water Htr.(s) Space Heating Unit(s) Cooling Unit(s) Clothes Dryer(s) Input Ratin~, MBTU Service Main ~_.7_5 4O 922_To.t:_al. ___ 135 .... Maximum Free Allowance 175 Ft. Ft. When the footage of service pipe required to reach the meter location exceeds the free service footage allowance provided in Rule No. 21, the applicant will be required *to advance the cost of such excess footage at $ 7.20 per foot. If curb meter vault(s) are installed as part of the in- stallatio., tire dollar value of tree service footage allowance may be applied against the cost of the meter vault installation. [] Attached equipment list becomes a part of this contract. Applicant hereby requests Southern California Gas Company to install gas main substantially as follows: ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH RULE 20 Main Extension Required ......................................................... Ft. Less Allowance(s) for Applicant(s).. Ft. Total Advance Required ................................................... Ft. @ $ per ft. = $. Amount Advanced By Applicant ................................................................................................................ $- ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBDIVISIONS, TRACTS AND MULTI-FAMILY DWELLINGS IN ACCORDANCE WITH RULE 20. Advance Required ......................................................... Amount Postponed ........................................................ Advance Payable With This Contract ................................ $ -Installation will be made by Southern California Gas Company according to Rule 20 for main extension and Rule 21 for service extension, as filed by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions shown on the reverse side. A copy of the rule(s) will be provided upon request. /~dUTHERN CALIFORNIA. GAS COMPANY By Date Aree Sales Representative Applicant_ ~BY ~Title Division S,,~J~S - A~ea V Mail Address CITY OF TUSTIN ATTN: RON WOLFORD 300 CENTENNIAL W~. TUSTIN, CA 92680 CONTR ACT FOR EXTEt .oN GAS LINE !~ Service r-! Main !-] Service and Main ~PLY: No. Units t Lot(s) I'-1 Multi-Family RESIDENTIAL: r-I Individual NON-RESIDENTIAL: ~ Commercial Address 200 S. C ST. Applicant's Name CITY OF TUSTIN I-] Gas Engine l--I Subdivision r"l Tract r-] Firm Industrial Fo~ ~ No. 0~,603~9~/~-37621 · M.E.O. No. .Tract No. I-q Interruptible City TUSTIN AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE Gas Appliances/Equipment to be installed No. Range(s) Water Htr.(s) Space Heating Unit(s) Cooling Unit(s) Clothes Dryer(s) Input Ratinl[ MBTU Service Main 75 __ 40 . ~_22_ 'ro_ca_] ........ ]~5 .... Maximum Free Allowance 175 Ft Ft. When the footage of service pipe required to reach the meter location exceeds the free service footage allowance provided in Rule No. 21, the applicant will be required to advance the cost of such excess footage at $ 7.20 ,per foot. If curb meter vault(s) are installed as part of the in- stallation, the dollar value of free servic~ footage allowance may be applied against the cost of the meter vault installation. [] Attached equipment' list becomes a part of this contract. , Applicant hereby requests Southern California Gas Company to install gas main substantially as follows: ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH RULE 20 Main Extension Required .................... Ft. Less Allowance(s) for Applicant(s) Ft. Total Advance Required ................................ Ft. @ $ per ff. = $ Amount Advanced By Applicant ................................................................................................................ $ ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBDIVISIONS, TRACTS AND MULTI-FAMILY DWELLINGS IN ACCORDANCE WITH RULE 20. Advance Req ui red ......................................................... $ Amount Postponed ........................................................ $, Advance Payable With This Contract ............................... $ Installation will be made by Southern California Gas Company according to Rule 20 for main extension and Rule 21 for service extension, as filed by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions shown on the reverse side. & copy of the rule(s) will be provided upon request. &~/~/~,~UTHERN CALIFORNIA GAS COMPANY Area Sales Representative Date Division SALF. S - Area V Applicant By. Title Mail Address CITY OF 'jTUSTIN A'EI~: RON WOLFORD 300 CENTENNIAL WY. TUSTIN, CA 92680 SERVICE EXTENSION . . CONTRACT CONDITIONS I, as owner or authorized agent for the owner, hereby request Southern California Gas Company to install service pipe to and upon the aforementioned premises, in accordance with provisions of Rule No. 21 as filed with the Public Utilities Commission of the State of California, and grant to the Compady such easements and rights of way in, under, across and through said premises, together with such rights of ingress and egress as may be necessary or convenient to enable the* Company to install, operate, inspect, maintain, repair, replace and remove meters, gauges, pipelines, fittings and regulators and all other equipment and apparatus which the Company may install for the purpose of furnishing service to the aforementioned premises or adjoining premises, or to make a survey of number and type of appliances and equipment installed on the aforesaid premises; except that the right to furnish service to adjoining premises shall not apply in the case of non-residential premises. It is understood that if, at any time, a property owner whose premises are served from an adjoining premises requires a separate service from the main, the Company will install such service at its own expense. I agree to install and use the gas appliances and equipment listed on the face of this document, or any attach- ments hereto. In the event I fail to install one or more of the gas appliances and equipment listed, I agree that the Company may calculate and bill me and I will pay an amount according to the Company's extension rule in offect at the time the extension was made as though I had requested service on the basis of the actual appliances and equipment installed and utilized. In consideration of the gas appliances and equipment to be installed, the Company will make allowances as pro- vided in the aforementioned Rule 21, or as much thereof as is required to r'each ,~ meter location that is satisfa~'- tory to the Company. If, based upon the appliances and equipment found installed, there is a greater allowance than that originally granted and the applicant has made an advance, an appropriate refund will be made within 90 days after notice to the Company of such added appliances, provided these are installed within, one year of com- mencing service. MAIN EXTENSION 1. The appliances and/Or equipment listed on this document or attachment hereto and upon which Company al- lowances are based, will be installed and the applicant will commence using them within 6 months after com- pletion of the main extension and continue said uses for a minimum period of 3 years for the purposes for which they are intended. If the applicant fails to take service or fails to install one or more of the appliances or equip. ment contracted for,.the Company will calculate and bill the customer as provided in Rule 20 E.1. and the customer shall pay an amount according to the Company's mai n extension rule in effect at the time the extension was made as though service had been requested on the basis of the actual appliances and equipment installed and utilized. This payment when received becomes an advance, refundable as provided in the following paragrapll~ ~ [hrough 6. 2. If additional equipment is found installed for separately metered permanent,firm industrial or gas engine serv- ice (but not interruptible) resulting in an increase in the annual revenue, and there is a greater allowance than that originally granted, an appropriate refund of the applicant's advance will be made within 90 days without interest, after notice to the Company of such added equipment, provided the equipment is added within one year of commencing service. The amount of refund will be computed on the cost per foot that was applicable at the time the extension was originally constructed. Refunds may be cumulated to $25.00 minimum or the total refundable balance if less than $25.00 before each refunding. 3. Refunds also will be made for the appliances and the load permanently installed in excess of the load contracted for originally when added within one year of first taking service. Such refunds will be made within 90 days after the Company receives notice of the addition by the customer. 4. Where there are a series of extensions, on any of which an advance is still refundable, and the Company makes succeeding extensions, refunds will be made to repay in turn each of such advances which remain refundable beginning with the first in series from the original point of supply. 5. When two or more parties make a joint advance on the same extension, refundable amounts will be distributed to these parties in the same proportion as their individual advances bear to the total joint advance. 6. No payment will be made by the Company in excess of the amount advanced by the applicant or applicants nor after a period of ten years from the date the Company is first ready to render service from the extension, and any unr. efunded amount remaining at the end of the ten-year period will become the property of the ComPany. GENERAL All terms and stipulations agreed to by the parties in relation to the described gas extension are contained in this contract. No agent of the Company has authority to make any terms or representations not contained in this con* tract, and the applicant hereby waives any such terms or representations and agrees that the Company shall not be bound hereby. 2. This contract shall at all times be subject to such changes or modifications by the California Public Utilities Com- mission as that Commission may, from time to time, direct in the exercise of its jurisdiction. 3. Neither this contract nor any part of it, nor any refunds due or to become payable under it, shall be assigned without the written consent of the Company and, in the absence of such consent, no assignment will be recog* nized by the Company.