HomeMy WebLinkAboutCC 6 SR CTR GAS LINE EXT 7-18-8 CONSENT CALENDAR
Inter- Com
DATE:
TO:
WILLIAM HUSTON, CITY MANAGER
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: TUSTIN SENIOR CENTER - CONTRACT FOR GAS LINE EXTENSION
RECOMMENDATION:
That the Tustin city Council at their meeting of July 18, 1988 approve
the Southern California Gas Company Contract No. 05003499/U-37621 and
authorize the Mayor to execute said contract.
O :
BACKGRUND
The Tustin Senior Center project will be utilizing natural gas as a
utility within the complex at 200 So. "C" Street. Each utility requires
the applicant (City) to enter into a contract agreement for extension of
main line facility to the requested point of service.
DISCUSSION:
The subject project falls within the limits of the free allowance (175
L.F.) for main line extensions. Consequently, there are no charges
required for this service. The attached contract agreement outlines the
routine terms and conditions that the Southern California Gas Company
will provide service to the customer.
This agreement is a routine service agreement and has been previously
executed by the City on various other projects. ~
Bob Le-dendecker
Director of Public Works/City Engineer
BL:mv
CONTRACT FOR EXTEl
;1~ Service I'-1 Main
T~, ?PLY: No. Units I Lot(s)
ION GAS
Service and Main
LINE
Fo ~No.. 05003499/u-37621
M.E.O. No.
.Ti'act No.
RESIDENTIAL: I--I Individual r-I Multi-Family I'-I Subdivision I-'l Tract
NON.RESIDENTIAL: ~t~, Commercial I-'1 Gas Engine r-I Firm Industrial I'-I Interruptible
Address 200 S. C ST.
Applicant's Name CITY OF TUSTIN
City I'OSTTN
AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE
Gas Appliances/Equipment
to be installed
No.
Range(s)
Water Htr.(s)
Space Heating Unit(s)
Cooling Unit(s)
Clothes Dryer(s)
Input
Ratin~,
MBTU
Service Main
~_.7_5 4O
922_To.t:_al. ___ 135 ....
Maximum Free Allowance
175 Ft. Ft.
When the footage of service pipe required
to reach the meter location exceeds the
free service footage allowance provided in
Rule No. 21, the applicant will be required
*to advance the cost of such excess footage
at $ 7.20 per foot. If curb meter
vault(s) are installed as part of the in-
stallatio., tire dollar value of tree service
footage allowance may be applied against
the cost of the meter vault installation.
[] Attached equipment list becomes a
part of this contract.
Applicant hereby requests Southern California Gas Company to install gas main substantially as follows:
ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH RULE 20
Main Extension Required ......................................................... Ft.
Less Allowance(s) for Applicant(s).. Ft.
Total Advance Required ................................................... Ft. @ $ per ft. = $.
Amount Advanced By Applicant ................................................................................................................ $-
ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBDIVISIONS, TRACTS AND MULTI-FAMILY DWELLINGS IN ACCORDANCE
WITH RULE 20.
Advance Required .........................................................
Amount Postponed ........................................................
Advance Payable With This Contract ................................ $
-Installation will be made by Southern California Gas Company according to Rule 20 for main extension and Rule 21 for service extension, as
filed by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions shown on the reverse side.
A copy of the rule(s) will be provided upon request.
/~dUTHERN CALIFORNIA. GAS COMPANY
By
Date
Aree Sales Representative
Applicant_
~BY
~Title
Division S,,~J~S - A~ea V
Mail Address
CITY OF TUSTIN
ATTN: RON WOLFORD
300 CENTENNIAL W~.
TUSTIN, CA 92680
CONTR ACT FOR EXTEt .oN GAS LINE
!~ Service r-! Main !-] Service and Main
~PLY: No. Units t Lot(s)
I'-1 Multi-Family
RESIDENTIAL: r-I Individual
NON-RESIDENTIAL: ~ Commercial
Address 200 S. C ST.
Applicant's Name
CITY OF TUSTIN
I-] Gas Engine
l--I Subdivision r"l Tract
r-] Firm Industrial
Fo~ ~ No. 0~,603~9~/~-37621
·
M.E.O. No.
.Tract No.
I-q Interruptible
City TUSTIN
AGREEMENT FOR FREE EXTENSION ALLOWANCE FOOTAGE
Gas Appliances/Equipment
to be installed
No.
Range(s)
Water Htr.(s)
Space Heating Unit(s)
Cooling Unit(s)
Clothes Dryer(s)
Input
Ratinl[
MBTU
Service Main
75 __ 40 .
~_22_ 'ro_ca_] ........ ]~5 ....
Maximum Free Allowance
175 Ft Ft.
When the footage of service pipe required
to reach the meter location exceeds the
free service footage allowance provided in
Rule No. 21, the applicant will be required
to advance the cost of such excess footage
at $ 7.20 ,per foot. If curb meter
vault(s) are installed as part of the in-
stallation, the dollar value of free servic~
footage allowance may be applied against
the cost of the meter vault installation.
[] Attached equipment' list becomes a
part of this contract.
,
Applicant hereby requests Southern California Gas Company to install gas main substantially as follows:
ADVANCE FOR MAIN EXTENSIONS BEYOND FREE FOOTAGE ALLOWANCE IN ACCORDANCE WITH RULE 20
Main Extension Required .................... Ft.
Less Allowance(s) for Applicant(s) Ft.
Total Advance Required ................................ Ft. @ $ per ff. = $
Amount Advanced By Applicant ................................................................................................................ $
ADVANCES FOR MAIN EXTENSIONS TO SERVE SUBDIVISIONS, TRACTS AND MULTI-FAMILY DWELLINGS IN ACCORDANCE
WITH RULE 20.
Advance Req ui red ......................................................... $
Amount Postponed ........................................................ $,
Advance Payable With This Contract ............................... $
Installation will be made by Southern California Gas Company according to Rule 20 for main extension and Rule 21 for service extension, as
filed by the Company with the California Public Utilities Commission. Terms of this contract are subject to conditions shown on the reverse side.
& copy of the rule(s) will be provided upon request.
&~/~/~,~UTHERN CALIFORNIA GAS COMPANY
Area Sales Representative
Date
Division SALF. S - Area V
Applicant
By.
Title
Mail Address
CITY OF 'jTUSTIN
A'EI~: RON WOLFORD
300 CENTENNIAL WY.
TUSTIN, CA 92680
SERVICE EXTENSION
.
.
CONTRACT CONDITIONS
I, as owner or authorized agent for the owner, hereby request Southern California Gas Company to install service
pipe to and upon the aforementioned premises, in accordance with provisions of Rule No. 21 as filed with the
Public Utilities Commission of the State of California, and grant to the Compady such easements and rights of
way in, under, across and through said premises, together with such rights of ingress and egress as may be
necessary or convenient to enable the* Company to install, operate, inspect, maintain, repair, replace and remove
meters, gauges, pipelines, fittings and regulators and all other equipment and apparatus which the Company
may install for the purpose of furnishing service to the aforementioned premises or adjoining premises, or to
make a survey of number and type of appliances and equipment installed on the aforesaid premises; except that
the right to furnish service to adjoining premises shall not apply in the case of non-residential premises. It is
understood that if, at any time, a property owner whose premises are served from an adjoining premises requires
a separate service from the main, the Company will install such service at its own expense.
I agree to install and use the gas appliances and equipment listed on the face of this document, or any attach-
ments hereto. In the event I fail to install one or more of the gas appliances and equipment listed, I agree that the
Company may calculate and bill me and I will pay an amount according to the Company's extension rule in offect
at the time the extension was made as though I had requested service on the basis of the actual appliances and
equipment installed and utilized.
In consideration of the gas appliances and equipment to be installed, the Company will make allowances as pro-
vided in the aforementioned Rule 21, or as much thereof as is required to r'each ,~ meter location that is satisfa~'-
tory to the Company. If, based upon the appliances and equipment found installed, there is a greater allowance
than that originally granted and the applicant has made an advance, an appropriate refund will be made within 90
days after notice to the Company of such added appliances, provided these are installed within, one year of com-
mencing service.
MAIN EXTENSION
1. The appliances and/Or equipment listed on this document or attachment hereto and upon which Company al-
lowances are based, will be installed and the applicant will commence using them within 6 months after com-
pletion of the main extension and continue said uses for a minimum period of 3 years for the purposes for which
they are intended. If the applicant fails to take service or fails to install one or more of the appliances or equip.
ment contracted for,.the Company will calculate and bill the customer as provided in Rule 20 E.1. and the customer
shall pay an amount according to the Company's mai n extension rule in effect at the time the extension was made
as though service had been requested on the basis of the actual appliances and equipment installed and utilized.
This payment when received becomes an advance, refundable as provided in the following paragrapll~ ~ [hrough 6.
2. If additional equipment is found installed for separately metered permanent,firm industrial or gas engine serv-
ice (but not interruptible) resulting in an increase in the annual revenue, and there is a greater allowance than
that originally granted, an appropriate refund of the applicant's advance will be made within 90 days without
interest, after notice to the Company of such added equipment, provided the equipment is added within one
year of commencing service. The amount of refund will be computed on the cost per foot that was applicable
at the time the extension was originally constructed. Refunds may be cumulated to $25.00 minimum or the total
refundable balance if less than $25.00 before each refunding.
3. Refunds also will be made for the appliances and the load permanently installed in excess of the load contracted
for originally when added within one year of first taking service. Such refunds will be made within 90 days after
the Company receives notice of the addition by the customer.
4. Where there are a series of extensions, on any of which an advance is still refundable, and the Company makes
succeeding extensions, refunds will be made to repay in turn each of such advances which remain refundable
beginning with the first in series from the original point of supply.
5. When two or more parties make a joint advance on the same extension, refundable amounts will be distributed
to these parties in the same proportion as their individual advances bear to the total joint advance.
6. No payment will be made by the Company in excess of the amount advanced by the applicant or applicants nor
after a period of ten years from the date the Company is first ready to render service from the extension, and
any unr. efunded amount remaining at the end of the ten-year period will become the property of the ComPany.
GENERAL
All terms and stipulations agreed to by the parties in relation to the described gas extension are contained in this
contract. No agent of the Company has authority to make any terms or representations not contained in this con*
tract, and the applicant hereby waives any such terms or representations and agrees that the Company shall not
be bound hereby.
2. This contract shall at all times be subject to such changes or modifications by the California Public Utilities Com-
mission as that Commission may, from time to time, direct in the exercise of its jurisdiction.
3. Neither this contract nor any part of it, nor any refunds due or to become payable under it, shall be assigned
without the written consent of the Company and, in the absence of such consent, no assignment will be recog*
nized by the Company.