Loading...
HomeMy WebLinkAboutRPT 5 EL MODENA IMP'S 10-19-88REPORTS TO: WILLIAM HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: EL MODENA-IRVINE CHANNEL IMPROVEMENTS RECOMMENDATION: Receive and file. BACKGROUND: At the City Council meeting of October 6, 1988, the City Council raised a concern regarding the level of the maintenance road for the E1 Modena-Irvine Channel and the yards of the adjacent residential properties. DISCUSSION: The current E1 Modena-Irvine Channel (FaCility F07) improvements extend northerly from the intersection of Bryan Avenue and Browning Avenue. These improvements provide 100-year storm protection to the surrounding properties; This 100-year protection requires a certain sized vertical wall concrete channel to pass the storm flows. Due to limited right-of- way widths by adjacent residential developments, it was necessary to design and construct a channel facility which was slightly higher in elevation than the original earthen channel in order to accommodate these 100-year storm flows. Consequently, the adjacent maintenance road has been elevated approximately one foot. Once construction has been completed, the activity on this maintenance road should be minimal. These flood control right-of-way will all be fenced and routine public access to these channels are prohibited. Bob Ledendecker Director of Public Works/City Engineer BL:mv