Loading...
HomeMy WebLinkAboutConsent Cal. #4 5-04-87DATE: APRIL 28, 1987 L ,SENT CALENDAR NO. 4 5-4-87 Inter- Com TO: FROM: SUBJECT: WIU. IAN HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE RECONSTRUCTION OF MAIN ST. FROM 'C' ST. TO PACIFIC (OCU'I-I' PROJECT PHASE I AND II) RECOMMENDATION: -. It is recommended that the City Council, at their meeting of May 4, 1987, approve the following: 1. Resolution approving the plans and specifications and authorizing advertisement for bids. 2. Appropriation of $44,919 from General Fund Reserve to provide needed project funding for increased scope of work. BACKGROUND: This project includes the replacement of deteriorated pavement, new curb a~d gutter, wheelchair ramps and drive aprons on Main St. from "C" St. to Pacific, as well as new sidewalk and catch basin improvements on the northerly side of Main St. between Myrtle Ave. and the Costa Mesa Freeway. Funding has been previously allocated. In addition, it is recommended that the City Council authorize additional funds to provide for the construction of new sidewalks on Main St. from "B" St. to Pacific. It will also be necessary to construct approximately 280 feet of new storm drain between "A" and "B" Street to accommodate the change in grade for new curb and gutter that is required to alleviate the poor drainage condition that currently exists. In conjunction with this Project, street light conduit will be installed for the new decorative type lighting fixtures which have been requested for Main St. This contract will include only the installation of the conduit. The street lights themselves will be installed by the Edison Co. once the specific type of fixture is decided upon. Since the cost will depend on the type of fixture chosen, funding for. the lights will have to be budgeted at a later time (estimated at an additional $12,000 to $15,000). The engineer's estimate for this project is $374,971. A breakdown of amounts currently budgeted and requirement for additional funds i's as follows: OCUTT Funds ........ (Phases I and II) $159,226 City S.B. 300 Gas Tax Funds ..... (City share of OCUTT Phase I and II) $159,226 APRIl 28, 1987 PAGE TWO City General Fund .............................. $ 11,600. (Sidewalk and catch basin west of Myrtle) Additional budget appropriation required from City General Fund for new sidewalk between "B" St. and Pacific ............................................. Additional budget appropriation required from City General Fund for installing new street light conduit .................... $ 34,819 $ 10,100 TOTAL $374,971 This estimate is as accurate as possible based on our past experience with similar types of projects. The actual contract award price may vary somewhat depending on the cost of the individual bid items, materials availability, and the general economic climate in the construction industry. Tabulated below is the tentative schedule for this project: City Council authorization to advertise for bids ........... May 4, 1987 1st legal advertisement ............... May 14, 1987 2nd legal advertisement ...................... .May 21, 1987 Open bids ........................... June 9, 1987 City Council awards contract ............................... June 15, 1987 Begin construction ............... July 13, 1987 (Subject to change depending on pipe delivery time) Complete construction ...... , ............... October 9, 1987 Bob Ledendecker ' ' Director of Public Works/City Engineer BL:SW:jm Steve-Wo rral 1 Assistant Civil Engineer RESOLUTION NO. 87-50 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR RECONSTRUCTION OF MAIN ST. FROM "C" ST. TO PACIFIC AND AUTHORIZING ADVERTISEMENT FOR BIDS 5 WHEREAS, it is the intention of the City Council of the City of Tustin, 6 California to construct certain improvements on Main Street consisting of' 7 8 9 10 11 A) Reconstruction of pavement, new curb and gutter, wheelchair ramps, drive aprons and conduit for new street lights between "C" Street and Pacific Street B) New sidewalk between "B" Street and Pacific Street C) New sidewalk and catch basin improvements west of Myrtle D) Storm drain and catch basin improvements between "A" and "B" Streets 12 13 14 15 16 WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; NOW THEREFORE, BE IT RESOLVED that the plans and specifications by the City Engineer be and are hereby approved as the plans and speci ficatidns for: Reconstruction of Main Street from "C" Street to Pacific (OCUTT Project Phase I and II) 17 BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or 18 proposals for the doing of the work specified in the aforesaid plans and specifications which said advertisement shall be substantially in the 19: form as the attached NOTICE TO CONTRACTORS, entitled Exhibit "A" and made a part hereof. PASSED AND ADOPTED at a regular meeting of the City Council of the City 2! of Tustin, held on the day of , 1987. 22 23 Richard B. Edgar 24 Mayor 25 ATTEST- 26 27 28 Mary E. Wynn City Clerk SECTION A NOTICE TO CONTRACTORS SEALED PROPOSALS will be received at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California ~92680 until 10'00 A.M. on the 9th day of June , 1987 at which time they will be publicly opened and read, for performing work as follows- Construction of: Reconstruction of Main St. from "C" St. to Pacific (OCUTT Project Phase I and II) Bids are required for the entire work described herein- SCHEDULE OF WORK ITEMS Item No. Description Unit Quantity 1. Sawcut LF 2. Pavement Removal SF 3. Roadway Excavation CY 4. Rubberized A.C. TN 5. A.C. Base Course TN 6. Type A-2 Curb and Gutter LF 7. Type D Curb and Gutter LF 8. Sidewalk and Wheelchair Ramps SF 9. Driveway Aprons SF 10. Cross-Gutter SF 11. Adjust Water Valves EA 12. Adjust Manholes EA 13. Street Light Conduit LF 14. 18" R.C.P. Storm Drain LF 15. New Catch Basin Type O.S. EA 16. Modify Existing Catch Basin EA 17. Modify Existing Inlet Structure EA 18. Striping, Markings, R.P.M.S LS 435 70,290 1,750 510 3,294 2,080 297 12,370 1,388 455 12 8 1,682 278 1 1 1 1 The foregoing quantities are approximate only being given as a basis for the comparison of bids, and the City of Tustin does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable by the Engineer. Plans, specifications and proposal forms to be used for bidding on this project can only be obtained by prospective bidders at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California 92680, upon payment of $10.00 per set, or will be mailed out upon payment of $15.00 per set, which amounts are not refundable. A-1 In conformance with Section 37931 of the Government Code, all bids shall be presented under sealed cover on the proposal form provided and accompanied by bidder's security in the form of cash, cashier's check, certified check or bid bond execu'ted by an accredited surety. The security shall be for an amount no less than 1~)% of the amount of the bid. A bid shall not be considered unless one of 'the forms of bidder's security is enclosed therewith. A Security Bond for payment of labor and materials will be required in the amount of (50%) of the estimated total contract price and a Faithful Performance Bond in the amount of one hundred percent (100%) of the estimated total contract p. rice in the form attached to the contract documents. Said bonds shall be issued by a surety company rated Grade A or better and Class IV or better by the latest edition of Best's Key Rating Guide. City of Tustin reserves the right to reject any or all bids, and/or to waive any informality on a bid. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof. Prior to bid opening, bidder may withdraw his bid. Bids received after the bid opening time and date herein will be returned to bidder unopened. Pursuant to California Government Code Section 4590, the contractor will be entitled to post approved securities with the City or an approved financial institution in order to have the City release funds retained by the City to insure performance of the contract. Prior to contract award, the successful bidder shall possess a valid State of California Contractor's License in the classification of either A or C12. The City Council of the City of Tustin has obtained from the Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed and a copy of the same is on file in the office of the City Clerk Not less than said prevailing rates shall be paid to workers emloyed on this public works contract as required by Labor Code Sections 1771 and 1774 of the State of California. Ordered by the City Council on May 4, 1987. Mary E. Wynn, City Clerk A-2