Loading...
HomeMy WebLinkAboutRPT 8 FORMER RESIDEN 11-16-87REPORTS NO. 8 TO: FROM: SUBJECT: WILLIAFI HUSTON, CITY MANAGER PUBLIC WORKS DEPARllqENT/ENGINEERING DIVISION STATUS REPORT - FORGER RESIDENCE OF WATER SERVICE MANAGER RECOMMENDATION: Receive and file. BACKGROUND: A single-story three bedroom structure located at 245 East Main Street served as the residence of the Tustin Water Works Water Superintendent until November 1980 when the City purchased the private water system. After the purchase of the Tustin Water Works by the City, thi-s structure continued to be used as a residence by the Water Service Manager (same person as the Tustin Water Works Superintendent) until September 1987, a few months after his retirement in July 1987. Currently, the structure is vacant and is not being utilized by any full-time use. The structure has been secured/locked and is routinely inspected for any vandalism or forced entry. The City is fortunate in that the structure is located on the premises of the water plant facility .and has a high visibility of usa during the five-day work week and usually a fair amount of activity on Saturdays by the Water staff. No definite uses for the structure have been identified as of this time, but some of the possibilities are identified as follows: 1. Sale of structure and removal from site. 2. Demolition of structure. 3. Use as a City building for expansion of various departments. 4. Use as a City building for community events/programs. Items 3 and 4 would most likely require building modification to bring the structure in conformance with current building codes. In the event additional information on this item is required, please advise. Bob Ledendecker Director of Public Works/City Engineer BL/mv