Loading...
HomeMy WebLinkAboutOB 2 CONCRETE MEDIAN 02-01-88TO: WILLIAM HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJEOT: AUTHORIZATION TO ADVERTISE BIDS FOR EMBOSSED CONCRETE MEDIAN PAVING IMPROVEMENTS (FILE NO. 2445A) RECOMMENDATION: Pleasure of the City Council. BACKGROUND: At their meeting of January 18, 1988, the Tustin City Council raised some concerns with the proposed paving of certain median islands with embossed concrete. These concerns centered around the loss of turf and/or other landscaping within the median islands. Staff was requested to provide photographs and a map indicating the individual areas of proposed median paving. Each of the attached photographs are cross-referenced to a vicinity map for identification. DISCUSSION: The proposed embossed paving consists of eleven locations as follows: 1. Fiwe locations which require the removal of existing landscaping (areas 1, 2, 3, 4 and 5). 2. One location which requires the removal of asphalt concrete paving (area 6) . 3. Five locations which are replacement areas for previously placed embossed concrete that had to be removed for maintenance of irrigation facilities (areas 7, 8, 9, 10 and ll) c The following is a revised tentative schedule for the subject project: City Council Determination of Project Scope Authorization to Advertise Bids First Legal Advertisement Second Legal Advertisement Open Bids Contract Award Commence Construction Complete Construction - - February 1, 1988 February 16, 1988 February 25, 1988 March 3, 1988 March 10, 1988 March 21, 1988 April 4, 1988 May 2, 1988 Bob Ledendecker Department Public Works/City Engineer