Loading...
HomeMy WebLinkAboutCC 8 EL MODENA CHANNEL 5-2-88DATE: APRIL 26, 1988 CONSENT CALENDAR NO. 8 5-2 -88 · Inter- Com TO: FROM: SUBJECT: WILLIAM HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION IMPROVEMENTS BY ORANGE COUNTY IN EL MODENA-IRVINE CHANNEL AND IN RED HILL CHANNEL RECOMMENDATION: That the City Council approve the County project for construction of improvements in E1 Modena-Irvine Channel (FO7) and in Red Hill Channel (Fl3). BACKGROUND: This Orange County construction project will provide for reinforced concrete vertical wall structure in the E1 Modena-Irvine Channel beginning at Browning Avenue/Bryan Avenue and going 1500' upstream to -~he confluence with La Colina Channel. This channel section will be ?om 34' to 50' wide and 12' deep and will replace the existing earth ~ection. A branch of the Red Hill Channel about 600' long is also part of the project. This will be a reinforced concrete vertical wall structure 22' wide and 12' deep to replace the existing earth section between the E1 Modena-Irvine Channel and River Ford Road. The Orange County Flood Control Act requires that before construction may proceed, the approval of the City Council is required. The City Planning Commission by Resolution No. 2470 (2-22-88) made a finding that the proposed channel improvement was in conformity with the Tustin Area General Plan. This improvement will be of great benefit to the city of Tustin in providing a higher level of protection from flooding and is financed with $1.25 million in OCFCD general funds. The attached map shows the project location. ~b Ledendecker .rector of Public Works/City Engineer BL/REW/mv ~~d~eEr in~~° 1~ Manager LEGEND IIIIIIIIIIIIIIIIIIIII W. O. It FOTI 89 R/W FII868 CONSTRUCTION I T.B;?-4B$[400I 420 515 4001 410 404 t¢+. ORANGE COUNTY ENVIRONMENTAL MANAGEMENT AGENCY EL MODENA-IRVINE CHANNEL FACILITY FO7 RED HILL :CHANNEL FACILITY F 13 I"= 600el PLATE NO. F-37 SCALE: I