HomeMy WebLinkAboutNB 4 SIDEWALK REPAIR 06-06-88DATE:
MAY 31, 1988
NEW BUSINESS
TO: WILLIAM HUSTON, CITY MANAGER
FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT: AWARD OF CONTRACT FOR SIDEWALK AND CURB AND GUTTER REPAIR
PROJECT, 1987-88 FY
RECOM/~ENDATION:
That the City Council award the contract for subject project to General
Procurement & Construction Co., Inc. of Costa Mesa, California in the
amount of $184,745.50 and authorize staff to add additional work to the
contract to utilize all budgeted funds.
BACKGROUND:
Subject project encompasses removal and replacement of sidewalks and/or
curbs and gutters, root pruning, and installing root barriers at various
locations throughout the City. These locations were mainly damaged by
City parkway trees. Trees to be pruned will first be top-trimmed by the
Field Services Division to reduce the possibility of losing trees during
strong winds.
Five bids were submitted for bid opening on May 31, 1988 at 2:00 P.M.
and are summarized as follows:
General Procurement & Construction Co., Inc., Costa Mesa, -- $184,745.50
Sully-Miller Contracting Co., Long Beach $193,093.65
Damon Construction Co., Gardena $202,202.15
B-1 Enterprises Corp., Rancho Cucamonga $223,026.26
Bruce Paving Co. Inc., Gardena $253,430.10
The low bid is 9.55% below the Engineer's Estimate of $204,243.10.
There is presently $211,000 allocated for sidewalk and curb and. gutter
repair, Approximately $5,000 will be spent on grinding of sidewalk at
various locations to reduce slab differentials that need attention but
are not as severe as others to be handled under this project. This will
be done by purchase order. This will leave approximately $21,000 to be
spent on additional work under this project to utilize the budgeted
funds.
Director of Public Works/City Engineer
BL:WA:mv
Wisam Altowaiji
Assistant Civil Engineer
to,
�.q
SECTION B
PROPOSAL TO THE CITY OF TUSTIN. CALIFORNIA
FOR THE CONSTRUCTION OF
SIDEWALK AND CURB AND GUTTER REPAIR PROJECT, 1987-88 FY
(Project No. 6235)
Name of Bidder: IFENERAL PROCUREMENT & CONSTRUCTION CO., MIC.
Business Address • COSTA MESA, CA 92626
Phone Number:
The work to be done and referred to herein is in the City of
Tustin, California, and is to be constructed in accordance with the
specifications and contract annexed hereto and also in accordance with
the Standard Specifications of the State of California, Business and
Transportation Agency, Department of Transportation, dated July, 1984
and the latest edition.of the "Standard Specifications for Public Works
Construction" where referred to.
The work to be done is shown upon plans and specifications
entitled:
SIDEWALK AND CURB AND GUTTER REPAIR PROJECT, 1987-88 FY
Said plans and specifications are on file in the office of the City
Engineer, Tustin, California.
TO THE CITY OF TUSTIN
The undersigned, as bidder, declares that the only persons or
parties interested in the proposal as principals are those named herein;
that this proposal is made without collusion with any other person, firm
or corporation; that he has carefully examined the location of the
proposed work, the annexed proposed form of the contract, and the plans
therein referred to; and he proposes and agrees if this proposal is
accepted,that he will contract with the City of Tustin, in the form of
the copy of the contract annexed hereto, to provide all necessary
machinery, tools, apparatus and other means of construction, and to do
all work and furnish all materials specified in the contract, in the
manner and time prescribed, and according to the requirements of the
Engineer as therein set forth, and that he will take full payment
therefore at the following unit prices, to -wit:
B-1
IF '
PROPOSAL
SIDEWALK AND CURB AND GUTTER REPAIR PROJECT, 1987-88 FY
(PROJECT NO. 6235)
ITEM
CONTRACT ITEM
APPROXIMATE
UNIT
TOTAL
NO.
DESCRIPTION
QUANTITY
PRICE
AMOUNT
1.
Remove and replace PCC sidewalk
25,305
SF
7S-
2.
Sawcut asphalt or concrete
4,503
LF
3.
Remove and replace PCC drive apron
1,086
SF
F`
4.
Remove and replace Type A-2 C&G
1,655
LF
i5_ "=
J4,
5.
Remove and replace Type B curb
41
LF
a (,, e =
E ;, (,-
6.
Remove and replace Type D C&G
1,011
LF
�d ,=
1L� :-Il
7.
Root pruning/barrier Type A
98
LF
) ;
8.
Root pruning/barrier Type B
622
LF
`-'
�)Q°-`
9.
Asphalt concrete pavement
113
TNOC
iO-
10.
New sidewalk
239
SF
TOTAL BID
B-2
The undersigned understands that the foregoing quantities are approximate
only, being given as a basis for the comparison of bids and the City of
Tustin does not, expressly or by implication, agree that the actual
amount of work will correspond therewith, but reserves the right to
increase or decrease the amount of any class, or portion of the work or to
omit portions of the work as may be deemed necessary or advisable and
in the best interests of the City by the Engineer.
In case of discrepancy between the unit price and the total amount for a
contract item, the unit price shall prevail. The basis for determining
the low bid shall be by correctly multiplying the number of units by the
unit price bid to calculate a total amount for each contract item and
obtaining a total bid by correctly adding together all contract item
total amounts. If a unit price is not legible or is missing, the total
amount for that contract item shall be divided by the approximate
quantity of units to arrive at the unit price bid. If both the unit price
and total amount for a contract item are left blank, then the entire bid
shall be rejected.
If this proposal shall be accepted and the undersigned shall fail to
enter into the contract and to furnish the two bonds in the amounts
required, with surety satisfactory to the City of Tustin, and the
required Certificate of Insurance within ten days, not including
Saturdays, Sundays and legal holidays, after the date of the Notice of
Award from the City Engineer, the City of -Tustin may, at its option,
determine that the bidder has abandoned the contract, and thereupon this
proposal and the acceptance thereof shall be null and void, and the
forfeiture of such security accompanying this proposal shall operate and
the same shall be the property of the City of Tustin.
The undersigned bidder hereby acknowledges that he/she understands the
bonding requirements of the City of Tustin which, per City Code, states
that the surety company must be rated Grade A and Class IV, or better,
in the latest edition of Best's Key Rating Guide.
ACCOMPANYING THIS PROPOSAL IS
(NOTICE: Insert the words "Cash ($ ),", "Cashier's Check",
"Certified Check", or "Bidder's Bond", as the case may be) in an amount
equal to at least ten percent of the total bid.
The names of all persons interested in the foregoing proposal as
principals are as follows:
�'-0C ! IC
B-3
IMPORTANT NOTICE: If the bidder or other interested person is a
corporation, state legal name of corporation and names of the president,
secretary, treasurer, and manager thereof; if a co -partnership, state
true name of firm and names of all individual co-partners composing firm;
if the bidder or other interested person is an individual, state first
and last names in full.
k=A k ftL s I f) £sj T -
Signed:
Title: L(ajAf CSS OfUC--
Date•
NOTE: If the bidder is a corporation, the legal name of the corporation
shall be set forth above, together with the signature of the officer or
officers authorized to sign contracts on behalf of the corporation; if the
bidder is a co -partnership the true name of the firm shall be set forth
above, together with the signature of the partner or partners authorized
to sign contracts on behalf of the co -partnership; and if the bidder is
an individual, his signature shall be placed above. If signature is by
an agent, other than an officer of a corporation or a member of a
co -partnership, a Power of Attorney must be on file with the City of
Tustin prior to the opening of bids or submitted with the bid; otherwise,
the bid will be disregarded as irregular and unauthorized.
B-4
Bidder shall -set forth the name and address of the place of business of
each subcontractor who will perform work, labor, furnish materials or
render service to the bidder on said contract and the portion of the work
to be done by such contractor:
Name of Address of Work to be done
Subcontractor Place of Business by Subcontractor
0
B-5
CONTRACTOR'S LICENSING STATEMENT TO BE PROVIDED BY SUCCESSFUL BIDDER
PRIOR TO AWARD OF CONTRACT
The undersigned contractor, or corporate officer, declares under penalty
of perjury that the attached copy of contractor's pocket license or
certificate of licensure is a true and correct copy of the original, that
said license is contractor's, is current and valid, and is in a
classification appropriate to the work to be undertaken for this project.
PROJECT: Sidewalk and Curb and Gutter Repair Project, 1987-88 FY
(Project No. 6235)
NAME OF CONTRACTOR:
SIGNED:
TITLE:
Subscribed and sworn before me,
California, on
SIGNED:
NOTARY SEAL
a Notary Public in and for the State of
, 1988.
B-8