HomeMy WebLinkAboutCC 7 PUBLIC ST. IMP'S 10-22-86CONSENT CALENDAR
NOo 7
TO:
WILLIAM HUSTON, CITY MANAGER
FROM:
S U BJ ECT:
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
ACCEPTANCE OF PUBLIC STREET IMPROVEMENTS AND REDUCTION OF BOND
AMOUNTS IN TRACT NO. 12345
RECOMMENDATION:
For the City Council meeting of October 22, 1986.
Acceptance of street, storm drain, water, sewer and other public utilities within
Parkview Way, Parkcenter Lane and related easements within Tract No. 12345 and
authorize a reduction of the following bonds in the amounts shown:
Perentage
of Amount
Bond No. Type Reduction Reduced
5241-00-68 Performance 75% $510,150.00
5241-00-68 Labor and Materials 75% $255,075.00
5241-00-69 Monumentation 100% $ 6,800.00
BACKGROUND:
Tract No. 12345 is a subdivision which was initiated by The Irvine Company and is
sometimes referred to as the Phase I Residential Development in the East Tustin
area. This tract is bounded by the Santa Ana Freeway on the south, Tustin Ranch
Road on the east, Bryan Avenue on the north and Browning Avenue on the west.
Public improvements within this tract included streets, storm drains, sewers,
water, utilities and landscape and irrigation work within Lot 8 adjacent to
Browning Avenue.
DISCUSSION:
Staff had requested The Irvine Company to accelerate the completion of the public
street system within Tract No. 12345 so that these streets could be utilized as
part of a detour when a portion of Bryan Avenue is closed during the construction
of the upstream reach of the E1Modena-Irvine Channel construction.
All public improvements within the two public streets, Parkview Way and Parkcenter
Lane, have been completed to the satisfaction of the Public Works Department.
However, the landscape and irrigation improvements for Lot 8 has not been totally
completed and it is suggested that only a portion of the total improvements be
accepted at this time and the following bonds be reduced as follows:
Percentage
of Amount
Bond No. Type Reduction Reduced
5241-00-68 Performance 75% $510,150.00
5241-00-68 Labor and Materials 75% $255,075.00
5241-00-69 Monumentation 100% $ 6,800.00
OCTOBER 14, 1986
PAGE TWO
The Subdivision Warranty Bond Number 5241-00-68 in the amount of $68,020.00 must
remain in effect for a period of one year after all improvements have been
accepted by the City Council.
ob Ledendecker
Director of Public Works/City Engineer
BL:jm