HomeMy WebLinkAboutCC 5 SIDEWALK RAMPS 11-17-86AG i CONSENT CALENDAR NO. 5 11-17-86 Inter i Com ER 7 1986D TO: FROM: SUBJECT: WILLIA~ HUSTON, CITY NANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION AUI'rmORIZATION TO ADVERTISE FOR BIDS FOR SIDEWALK/WREELCHAIR RAI~PS; EL CANINO REAL/TUSTIN )U~NCH ROAD RECOMMENDATION: It is recommended that the City Council, at their meeting of November 17, 1986, adopt the attached Resolution approving the plans and specifications for subject project and directing the City Clerk to advertise for bids. BACKGROUND: Subject project encompasses installing sidewalks and wheelchair ramps along E1 Camino Real from Browning Avenue.to Tustin Ranch Road. Sidewalk and wheelchair ramps will also be installed on the westerly side of Tustin Ranch Road from Bryan Avenue to approximately 890 feet south of the centerline of E1Camino Real. This construction was originally scheduled to be installed with the construction of the above mentioned streets, however, was delayed to avoid damage due to subsequent work in the area that has now been completed. The engineers estimate for this project is $115,200.00 for the construction of sidewalk and wheelchair ramps. There is currently $707,012.19 remaining within the project accounts of the East Tustin Assessment District No. 85-1 to provide funding for this project. Tabulation below is the tentative schedule for this project: City Council authorization to advertise for bids ........... November 17, 1986 1st legal advertisement .................................... November 27, 1986 2nd legal advertisement ~ ................................... December 4, 1986 Open bids .................................................. December 9, 1986 City Council awards contract ............................... December 15, 1986 Begin construction ......................................... January 5, 1987 Complete construction ...................................... February 4, 1987 . Director of Public Works/City Enginee~ BL:TT:jm Attachment Tim Tucker Junior Civil Engineer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 24 25 26 27 28 RESOLUTION NO. 86-133 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR SIDEWALK/WHEELCHAIR RAMPS; EL CAMINO REAL/TUSTIN RANCH ROAD WHEREAS, it is the intention of the City Council of the City of Tustin, California to construct certain sidewalk and wheelchair ramps on E1Camino Real from Browning Avenue to Tustin Ranch Road and on the westerly side of Tustin Ranch Road from Bryan Avenue to approximately 890 feet south of the centerline of E1Camino Real, and; WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; NOW THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for: Sidewalk/Wheelchair Ramps E1Camino Real/Tustin Ranch Road BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt~of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications which said advertisement shall be substantially in the following words and figures to-wit: "NOTICE TO CONTRACTORS" SEALED PROPOSALS will be received at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, until 10:30 A.M. on the 9th day of December, 1986, at which time they will be publicly opened and read, for performing work as follows: CONSTRUCTION OF: Sidewalk/Wheelchair Ramps E1Camino Real/Tustin Ranch Road Bids are required for the entire work described herein: ITEM NO. SCHEDULE OF WORK ITEMS DESCRIPTION 4" thick PCC sidewalk and wheelchair ramp UNIT Square Ft. QUANTITY 33,765 A-1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 The foregoing quantities are approximate only being given as a basis for the comparison of bids, and the City of Tustin does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable by the Engineer. Plans, specifications and proposal forms to be used for bidding on this project can only be obtained by prospective bidders at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, 92680, upon payment of $5.00 per set, which amount shall be non-refundable. Plans and specifications will only be mailed out upon payment of $10.00 per set, which amount shall be non-refundable. In conformance with Section 37931 of the Government Code, all bids shall be presented under sealed cover on the proposal form provided and accompanied by one of the following forms of bidder's security: a. Cash b. Cashier's check made payable to the City of Tustin. c. Certified check made payable to the City of Tustin. d. Bidder's bond executed by an accredited surety insurer, made payable to the City of Tustin . A Security Bond for payment of labor and materials will be required in the amount of fifty percent (50%) of the estimated total contract price and a Faithful Performance Bond in the amount of one hundred percent (100%) of the estimated total contract price in the form attached to the contract documents. Said bonds shall be issued by a Surety Company rated grade A or )better and Class IX or better by the latest edition of Best's Key Rating Guide. City of Tustin reserves the right to reject any or all bids, and/or waive any informality on a bid. After bids are opened, no bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof. Prior to bid opening, Bidder may withdraw his bid. Bids received after the bid opening time & date stated herein will be returned to bidder unopened. The contract will be awarded to the lowest qualified bidder. Provisions of the State Contract Act are not applicable, and prospective bidders will not be required to be prequalified. All work to be done under the direct supervision of the City Engineer, City of Tustin. All work to be paid for at the unit prices bid from appropriated monies. Pursuant to California Government Code Section 4590, the contractor will be entitled to post approved securities with the City or an approved financial institution in order to have the .City release funds retained by the City to insure performance of the contract. A-2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15' 16 17 18 19 20 21 22 23 24 25 26 27 28 The City Council of the City of Tustin has obtained from the Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed and a copy of the same is on file in the office of the City Clerk. Not less than said prevailing rates shall be paid to workers employed on this public works contract as required by Labor Code Sections 1771 and 1774 of the State of California. PASSED AND ADOPTED by the City Council of the City of Tustin, California, this day of , 1986. Donald J. Saltarelli Mayor ATTEST: Mary E. Wynn City Clerk Advertise in the Tustin News: November 27, 1986 December 4, 1986_ A-3