Loading...
HomeMy WebLinkAboutNB 1 17TH & YORBA 12-01-86DATE: NOVEI~ER 18, 1986 TO: FROM: SUBJECT: WILLIA~ HUSTON, CITY NANAGER PUBLIC WORKS DEPAR1)tENT/ENGINEERING DIVISION SEVENTEENllt STREET AND YORBA Sll~EET (SOUllt)/CA~RROLL WAY INTERSECTION RECOMMENDATION: For the City Council meeting of December 1, 1986. Authorize staff to proceed with the intersection modifications to provide dual left turn lanes from northbound Yorba to westbound .Seventeenth Street and coordinate said work with the proposed A.H.F.P. project along Seventeenth Street, 'and authorize a supplemental budget appropriation in the amount of $6,325.00. BACKGROUND: The City Council had requested staff to review the intersection of Seventeenth Street at Yorba Street (south)/Carroll Way with respect to left turn movements from northbound Yorba Street to westbound Seventeenth Street. The major concern was the extensive number of 1.eft turn movement§ with respect to the limited storage capacity of the protected left turn lane, and the limited cycle time for said left turn movements. DISCUSSION: The intersection review indicates that dual left lanes can be accommodated on the southerly leg of Yorba Street, which would almost double the left turn capacity for that movement. This modification can be accomplished by minor modifications: Estimated Cost Restriping and signing ......................... $ 2,000.00 ° Replacement/addition of traffic signal detection loops ....................... ° Modification of ~dian island on westerly'leg of Seventeenth Street ........... 4,200.00 1,225.00 The City is 'ready to commence work along Seventeenth St. once the County Arterial Highway Financing Program (A.H.F.P.) completes the review and approval of the plans. It is estimated that approximately $2,200.00 of the above mentioned work could be included within that project and funded 50% by the A.H.F.P. process. NOVEMBER 18, 1986 PAGE TWO In the event this work is coordinated with that project, the net modification cost to the City could be reduced to $6,325.00. Attached, is a schematic drawing of the modifications that are proposed for this intersection. Bob Ledendecker Director of Public Works/City Engineer BL:jm Attachment SOUTH NORTH DETAIL A 17 TH. STREET 'WATCH OPPOSING [RAFFIC" $1C, N. /- ,9£140V£ ISLANO NOSE. Yv,~ ................ ........... : ..... -7-' Z- ',~' J ~ t .... ........ ~ ...... ~! ~ ' ......... INSTALL NEW L~ O[TECTORS ~ D ~ ~ ............... _ _ '- - : ....~- -~ ..... ~ PAINT NEE LI~IT LINE. ~l ~ I ', INSTALL NEW LOOP DETECTORS.. // / I INSTALL C,I SIC, N PER DETAIL A. INSTALL NEW LOOP DETECTOR.