Loading...
HomeMy WebLinkAboutCC 9 AHFP PROJ 1173 01-05-87· ~ CONSENT CALENDAR Inter- Com TO: FROM: SUBJECT: WILLIA)! HUSTON, CITY FIANAGER BOB LEDENDECKER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER AUTHORIZATION TO ADVERTISE FOR BIDS FOR SEVENTEENTH STREET A.H.F.P. PROJECT NO. 1173, PAVEMENT REHABILITATION AND CENTER MEDIAN CONSTRUCTION .? RECOMMENDATION: It is recommended that the City Council, at their meet.ing of January 5, 1987, adopt the attached Resolution approving the plans and specifications for subject project and directing the City Clerk to advertise for bids. BACKGROUND: This street improvement project extends from the Costa Mesa Freeway on the west to Prospect Avenue (north) on the east and consists generally of the following improvements: Removal and replacement of deteriorated pavement at various locations Removal and replacement of damaged curb and gutter at various locations Installation of raised median with decorative concrete, between existing islands and Prospect Avenue (north) ° Asphalt concrete overlay on entire street Traffic striping and signing In addition to the above, all on-street parking will be removed in the segments of Seventeenth Street which are improved as a primary arterial highway to provide three travel lanes in each direction. This project is being funded through the Arterial Highway Financing Program which Participates on a fifty (50) percent basis with the local agency on all A.H.F.P. eligible construction items. All non-eligible items would be funded 100% by either the local agency or County of Orange depending upon jurisdictional limits of the project. DECEMBER 29, 1986 PAGE TWO The engineer's estimate for this project is $384,000.00 with the funding distribution as follows: County A.H.F.P. - .................. $105,000 County.Non-A.H.F.P. - .............. 8,000 City k.H.F.P. -, ................... 97,000 City Non-A.H.F.P. - ................ 174,000 TOTAL $384,000 Tabulation below is the tentative schedule for this project: City Council authorization to advertise for bids .............. January 5, 1987 1st legal advertisement ....................................... January 15, 1987 2nd legal advertisement ....................................... January 22, 1987 Open bids ..................................................... January 27, 1987 City Council awards contract .................................. February2, 1987 Begin construction ............................................ February 16, 1987 Complete construction ......................................... May 16, 1987 o Ledende~ker erry es n - Director of Public Works/City Engineer Assistant Civil Engi~neer BL:JO:jm Attachment 1 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 RESOLUTION NO. 87-6 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR PAVEMENT REHABILITATION AND CENTER MEDIAN CONSTRUCTION, TITLED SEVENTEENTH STREET AHFP PROJECT NO. 1173, COSTA MESA FREEWAY TO PROSPECT AVENUE (NORTH) AND DIRECTING THE CITY CLERK TO ADVERTISE FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to construct pavement rehabilitation and center medians on Seventeenl Street from the Costa Mesa Freeway to Prospeot Avenue (north); and WHEREAS, the C~ity Engineer has presented plans and specifications for the construction of said work; NOW THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for pavement rehabilitation and center median construction on Seventeenth Street from the Costa Mesa Freeway to Prospect Avenue (north). BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications which said advertisement shall be substantially in the following words and figures to-wit: "NOTICE TO CONTRACTORS" SEALED PROPOSALS will be received at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, until 10:00 A.M. on the 27th day of January, 1987 , at which time they will be publicly opened an reader performing work as follows: PAVEMENT REHABILITATION AND CENTER MEDIAN CONSTRUCTION SEVENTEENTH STREET AHFP PROJECT NO.' 1173 COSTA MESA FREEWAY TO PROSPECT AVENUE (NORTH) Bids are required for the entire work described herein: A-1 1 Item 1. 2. 4. 5. 8 6. 9 7. 10 8. g. 10. 11. 12. 15 1(~ 13. I? 14. 18 ~15. 19 16. 90 17. 18. 19. 20. 21. Unit Cu.Yd. Lin. Ft. Lin. Ft. Sq. Ft. Sq. Ft. Sq. Ft. Lin. Ft. Each Ton Sq. Ft. Sq. Ft. Sq. Ft. Ton Ton Ton Each Each Each Lump Sum Each Each SCHEDULE OF WORK ITEMS Quantit~ 934 7,819 477 1,441 88 388 3,132 7 678 8,549 69,796 1gg,i96 1,300 1,618 1,884 21 5 15 1 46 1 Description Excavate existing AC pavement and/or PCC Sawcut existing AC and/or PCC Type A-2 PCC curb and gutter 4" thick PCC sidewalk 6" thick PCC drive apron 8" thick PCC spandrel Type A PCC median curb PCC median curb Class 2 aggregate base in medians 4" thick embossed PCC median paving Cold plane existing AC pavement Heater remix existing AC pavement 3/4" - 1" depth and apply reclamite Asphalt concrete repair areas Variable thickness AC leveling course 0.10' thick AC wearing course Adjust water valve to finished grade Adjust survey well monument to finished grade Adjust M.H. to finished grade Traffic signing and striping Detector loops (6' X 6') Detector loops (6' X 8') A-2 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the City of Tustin does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work as may be deemed necessary or advisable by the Engineer. Plans, specifications and proposal forms to be used for bidding on this project can only be obtained by prospective bidders at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, 92680, upon Payment of $15.00 per set, which amount shall be non-refundable. Cross sections are available for an additional $10.00 per set, which amount shall be non-refundable. Plans and specifications will be mailed out upon payment of $25.00 per set, $30.00 with cross sections, which amount shall be non-refundable. In conformance with Section 37931 of the Government Code, all bids shall be presented under sealed cover on the proposal form provided and accompanied by one of the following forms of bidder's security: a. Cash b. Cashier's check made payable to the City of Tustin. c. Certified check made payable to the City of Tustin. d. Bidder's bond executed by an accredited surety insurer, made payable to the City of Tustin. The security shall be in an amount equal to at least ten percent (10%) of the amount of the bid. A bid shall not be considered unless one of the forms of bidder's security is enclosed therewith. A Security Bond for payment of labor and materials will be required in the amount of fifty percent (50%) of the estimated total contract price and a Faithful Performance Bond in the amount of one hundred percent (100%) of the estimated total contract price in the form attached to the contract documents. Said bonds shall be issued by a Surety Company rated Grade A or better and Class IX or better by the latest edition of Best's Key Rating Guide. City of Tustin reserves the right to reject any or all bids, and/or waive any informality on a bid. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof. The contract will be awarded to the lowest qualified bidder. Provisions of the State Contract Act are not applicable, and prospective bidders will not be required to be prequalified. A-3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 All work to be done under the direct supervision of the City Engineer, City of Tustin. All work to be paid for at the unit prices bid from appropriated monies. Pursuant to California Government Code Section 4590, the contractor will be entitled to post approved secur}ties with the City or an approved financial institution in order to have the City release funds retained by the City to insure performance of the contract. The City Council of the City of Tustin has obtained from the Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed and a copy of the same is on file in the office of the City Clerk. Not less than said prevailing rates shall be paid to workers employed on this public works contract as required by Labor Code Sections 1771 and 1774 of the State of California. PASSED AND ADOPTED by the City Council of the City of Tustin, California, this day of , 1987. ATTEST: Mayo r City Clerk Advertise in the Tustin News: January 15, 1987 January 22, 1987 A-4