COLUMBUS TUSTIN PARK PHASE II
RECOMMENDATION:
Pleasure of the City Council.
BACKGROUND:
A detailed Design Development Report, a copy of which is
attached, has been completed for Columbus Tustin park. This
report recommended that the Columbus Tustin facility remain a
high intensity sports facility serving youth and adults. The
concept favored was construction of a multi-purpose
gymnasium/locker facility. In addition, a multi-purpose
classroom facility was recommended, but parking may be inadequate
for both. The recommendations were the result of a participation
process that included a citizens task force, consultants, and
staff.
The City Council has not formally approved the specific design
concepts for the park as delineated in the Design Development
Report; however the Council has approved the general sports-
orientation concept as a part of the Recreation Element of the
General Plan.
Since the site plan and concept design are complete, the next
step would be to complete working drawings. Normally, funding
for working drawings is not appropriated until the entire
construction project is budgeted. There are no funds in the
1987/88 capital improvement budget either for working drawings or
for construction of Phase 2 of Columbus Tustin Park. Total
construction cost would be approximately $1 million; normally,
working drawings are approximately l0 percent of construction
cost: $100,000. (This figure is for the gymnasium complex only
without the additional classrooms.)
Columbus Tustin Project Phase II
October 14, 1987
Page 2
Should the Council wish to in proceed with working drawings, the
procedure would be to: 1) Formally approve the design concept in
the Design Development Report~ 2) Appropriate funding for the
working drawings in the amount of $100,000~;3~a0~00. could come
from the County revenue sharing payment;~w_~n~, appears to be
available in the Park Bond fund) and ~~U~ould have to be
appropriated from either the general fund or the Town Center
Redevelopment Project fund.
Royleen A. White, Director
Community and Administrative Services
kaw
Attachment: Design Development Report
~ d~ rep~.
columbus-tt n para
re--on
acknowledgements'
Richard B. Edgar, Mayor
Ursula E. Kennedy, Mayor Pro-Tem
Frank H. Greinke, Councilperson
Ronald B. Hoesterey, Councilperson
Donald J. Saltarelli, Councilperson
William A. Huston, City Manager
George Banks
Patty Banks
Jim Bickley
Lois Cart
Tony Coco
Sarah Colenmn
Joe De Camp
Mary Hernandez
Bob Hill
Ruby May
Jeff McElderry
Vivian Owen
Bill Teter
Kathy Well
Royleen A. White, Director
Co.m,~unity Services Depar13nent
TABLE OF CONTENTS
INTRODUCTION
AUTHORITY
PURPOSE
SITE ASSESSMENT
PLOT PLAN
PLANNING PROCESS
EXECUTIVE SUMMARY
BACKGROUND
Facility Assessment
Design Precepts
ISSUES AND RECOMMENDATIONS
Multi-Purpose Recreation Activity Center
Clifton C. Miller Community Center
Floor Plan - Clifton C. Miller Community Center
Recreation Activity Building
SUMMARY
DEVELOPMENT CONCEPT
OVERVIEW
CIRCULATION/PARKING
LANDSCAPING/IRRIGATION
GYMNASIUM/MAT ROOM FACILITY
FUTURE DEVELOPMENT
FLOOR PLAN - GYMNASIUM
SITE PLAN A
SITE PLAN B
Page No.
1.
1.
1.
2.
3.
4.
6.
6.
8.
9.
9.
13.
14.
15.
17.
19.
19.
22.
23.
23.
24~
25.
27.
28.
COST ANALYSIS
PROPOSED IMPROVEMENTS - PHASE 1
PROPOSED IMPROVEMENTS - CLIFTON C. MILLER
COMMUNITY CENTER
PROPOSED FUTURE RECREATION ACTIVITY BUILDING
PROPOSED ADDITIVE ALTERNATE - PHASE 1 -
COLUMBUS-TUSTIN PARK IMPROVEMENTS
PROJECTED MAINTENANCE AND OPERATIONAL COSTS
BUILDING DESIGN
GENERAL
ROOM FEATURES AND FINISHES
POSSIBLE ENVIRONMENTAL IMPACTS
AESTHETICS
NOISE
TRAFFIC AND PARKING
NEGATIVE DECLARATION
29.
29.
29.
30.
30.
30.
31.
31,
31.
37.
37.
37.
37.
38.
introduction
"The only legitimate purpose of a city is to provide for the
health and welfare of its residents." ... James Rouse.
On March 24, 1982, the City of Tustin entered into an agreement
with Recreation Systems, Inc. to furnish architectural and land-
scape architectural services associated With the proposed com-
pletion of Columbus-Tustin Park. The tentative work scope in-
volved the preparation of a Design Development Report to establish
the scope of site improvements for the balance of the undeveloped
lands within the park and to develop a precise program for the
provision of a major recreation building to meet the needs of the
residents of Tustin.
The Design Development Report is an association of planning func-
tions composed specifically to meet the needs of the public
agency in processing the initial design of any facility~ Its
purpose is tO establish a master plan that depicts the ultimate
development of the proposed building and site improvements
through a planning process that encourages the citizen, adminis-
trators, and elected officials to participate effectively in the
decisions on scope, function, and phasing priorities. The Design
Development Report evaluates environmental impacts, investigates
site constraints and opportunities, and promotes community under-
standing and support for the development program.
Columbus-Tustin Park, currently the only park area providing
Citywide services in Tustin, has been generally viewed as the
panacea for all of the specialized recreation needs and interests
for the entire community. The site has alternately and collect-
ively been designated as the location for facilities to serve the
performing arts; a gymnasium to house all types of indoor sports
activities; a general recreation center for life enrichment
classes; and a social center capable of serving the myriad of
private and organizational special events and social gatherings.
Because of its relationship to the Columbus-Tustin Intermediate
School and the recent development of lighted athletic facilities,
the park is currently serving the recreation needs of a variety
of field sports, with capacity and scope limited only by its.
physical boundaries.
A primary purpose of this report will be to review basic recre-
ation needs; study alternative solutions to facility require-
ments; and recommend actions that will protect the integrity
of diverse recreation activities while preserving the quality
of the experiences within all interest areas. Because future
conditions and circumstances cannot be forecasted with any
degree of accuracy, recommendations provide a maximum number of
options.
Columbus-Tustin'Park is located on the northeast corner of
Irvine Boulevard and Prospect Avenue adjacent to the Columbus-
Tustin Intermediate School. The site extends north along Prospect
Avenue to the Orange County Flood Control Channel and is severed
by Beneta Way, which serves as access to the school and a subdi-
vision north of the channel.
The park area involves properties of the Tustin Unified School
District, the Orange County Flood Control District, and the City
of Tustin. The existing lighted ballfields and a portion of the
tennis courts are located on school properties under a joint
powers agreement between the City and the School District. The
existing parking, the restrooms/concessions building, and the
balance of the tennis court improvements occupy a portion of the
5.4 acres owned by the City of Tustin. The Orange County Flood
Control District has leased to the City approximately .8 acres
lying north of Beneta Way.
The effective size of Columbus-Tustin Park is difficult to assess
or measure. Although the lighted ballfields and tennis courts
primarily serve a recreational need, they are also available for
school use. The balance of the field sports area and hard courts
are also serving educational needs. However, these resources are
available for public recreation use. It is estimated that'the
total site involves approximately 15 acres of usable recreation
space.
columbus-tustin park plot map
A major constraint of the City-owned pFoperties involves the
~McCalla leasehold. This parcel, involving approximately 1.1
acres of land, is currently encumbered by a lease to the former
OWner, with a term extended to coincide with thelife of the
lessee. This property faces on Prospect Avenue, roughly
centered between the channel and 1trine Boulevard. Because of
the circumstances surrounding this lease and the age of the
tenants, there is no intention on the part of the City to sever
the lease commitment.
Small commercial businesses occupy the frontage across from the
park 'along Irvine Boulevard. Similar development extends one
block northward from 1trine along the west side of Prospect
Avenue. Single family residential development with side lot
exposure to Prospect Avenue continues northward. A single
family residential subdivision is also located north of the
Flood Control Channel. Primary access to the park-will be from
Prospect Avenue, with a secondary access from Beneta Way re-
quired only if future development of the McCalla properties
would involve a significant increase to parking acco,~odations.
Every effort has been made to generate input and reaction to the
planning program from affected governmental agencies, special
recreation interests, individual citizens, and staff. A Citi-
zens' Advisory Committee was formed to work with staff and the
Consultant throughout the planning program. This Committee
was composed of twelve citizens, representing a variety of
special recreation interests, several existing community organi-
zations, and the adjoining neighbors. The Committee was care-
fully selected to balance the concerns of potential user groups,
the community as a whole, and adjacent residents.
Since May 1982, the Committee has met six times, and most members
also participated in a tour of similar facilities within nearby
co,u~unities. Meetings were conducted in the eveningand were
attended by the Director of Community Services, as well as the
Consultant.
The determination of need was quite elementary. It was not
necessary to conduct scientific surveys or extensive interviews
to establish deficiencies. Most of the suggested activity needs
-were either in operation in temporary facilities, or there were
no facilities available to accommodate identified interests. Co-
ordination of planning efforts with the concurrent preparation of
a Master Plan for the City further supported the ultimate direction
and scope. The issues of need, alternative solutions, and priori-
ties were debated in the Committee forum, with discussion generated
to explore each subject from a variety of perspectives. The recom-
mendations contained in this report, although not unanimous in all
instances, reflect the consensus of the Committee.
executive summary
The acquisition and development of Columbus-Tustin Park was
initiated in the early 1970's as a Joint venture between the
Ctty, School Otstrtct, and the County of Orange. The County
allocated revenue sharing funds on a matching basfs to the City
for acquisition and initial development. The County Flood Con-
trol District sold the surplus land south of Beneta Way to the
City under a lease-purchase agreement and is currently leasing
the property north of Benete Way for open space development as
part of the park.
The Tustin Unified School District has entered into a joint
powers agreement with the City for the development and opera-
tion of recreational improvements on school properties.
This planning and design program has been referred to as a
Master Plan and Report for Colu~us-Tustin Park. The implica-
tion is that issues would revolve around site improvements and
the relationships between functions throughout the park. Actually,
the l'imitattons of the site, both from a configuration and owner-
ship standpoint~ have pretty much dictated space allocation and
arrangement of facilities. The primary issue relates to the size,
scope, and function of the proposed recreation structure and the
required site improvements to serve and support this facility.
The existing improvements are performing their intended functions
effectively and all design efforts will be directed toward the
undeveloped portions of the site.
FACILITY ASSESSMENT
Currently, the City of Tustin has only two buildings that can be
scheduled exclusively to serve the growing recreation program
needs of the community. The Clifton C. Miller Community Center
is a relatively large, single room structure located adjacent to
the City Council Chambers within the Civic Center Complex. This
facility has an. ass~ly hall of approximately 4,300 square feet,
a small residential-type kitchen, and limited storage.
The second building is a classroom structure located on the cam-
pus of the Lambert School and currently leased to the City by the
Tustin Unified School District. The building has approximately
7,800 square feet of space and has been partitioned into several
classrooms and special use areas to meet specific program needs.
Currently, both buildings are scheduled to their capacity. In
addition, the City uses many school multi-purpose rooms and pri-
vately owned spaces when they are'available.
The Clifton C. Miller Conm~nity Center is used for a variety of
private and public sponsored social events and, when available,
it isscheduled for recreation programs such as senior citizen
meetings, "slim and trim", or aerobic classes. The facility has
.limited flexibility, and its inability to adapt to small group
needs makes it inefficient for most recreation programs or
activities.
The architectural style makes division into separate functional
units impractical;' restroom facilities are shared with City Council
chambers, making control and use during inclement weather difficult;
and, the'close proximity to City Hall inhibits use for teenage
activities or special events during the work day.
Use of the "closed" Lambert School is certainly cost effective and
relative)y convenient. However, it is temporary. Although no
future use by the School District has been established, best in-
formation would indicate that potential growth of the City would
eventually require its use. for educational purposes.
Attempted long term use of other closed school sites has met with
similar results, and although this option may have value in the
future, no commitment can be resolved at this time. It should
also be established that permanent building deficiencies exist
now. Any future growth in population will merely compound these
deficiencies.
There are currently four gymnasiums within Tustin; one is at Tustin
High School, and expanded school use during recent years eliminates
any possibility of use for public recreation. The Boys' Club gym
is scheduled to capacity, and the remaining church facilities are
also filled and unavailable for public use. It is obvious that a
public recreation gymnasium could be easily scheduled to capacity
to serve existing youth and adult needs for boys, girls, men, women,
and co-ed activities.
Similarly, facilities to serve the performing and visual arts
~t the introductory or recreation levels are non-existent. Need
is apparent for a location to have drama and music productions,
and studios or classroom space to teach and practice the various
visual arts and crafts.
The question is not whether recreation buildings are needed.
The only uncertainties are related to the level of service de-
sired and the most effective method of implementing an accept-
able service.
· DESIGN PRECEPTS.
Early'in the planning process, there were several design and
planning precepts that were developed by theCity or the Citi-
zens' Advisory C~,a~lttee that have been used to guide and direct
studies and concepts. These precepts are as follows:
McCalla Leasehold. The City of Tustin will continue to honor
the lease agreement with the McCallas, and any program of de-
velOpment'should protect the integrity of this property until
the lease is terminated. However, plans should be prepared to
allow for the effective integration of this parcel into the park
at some future date.
Residential Character. The design of any structure within
Columbus-Tustin Park should recognize and conform with the
residential character of the area, with necessary building
masses softened through set-backs, landscaping and styling to
be compatible, with surrounding developments.
Existing Resources. Every effort shall be made to retain and
integrate existing improvements within Columbus-Tustin Park.
Furthermore, maximum use of existing resourses must be carefully
evaluated and considered when resolving facility deficiencies,
regardless of their location within the City.
Off-Street Parking. The final design of Columbus-Tustin Park
must recognize the critical problems of parking and traffic
within the immediate area. Adequate off-street parking shall
be provided to meet anticipated design loads of all proposed
activity centers to minimize the impact of street parking
within adjacent residential areas.
issues and recommendations
In an effort to meet current and future recreation demand in Tustin,
the planning team has reviewed and discussed a number of options and
alternatives. Discussions between members of the Committee, staff
representatives, and the' Consultant have been detailed, candid, and
sometimes controversial. Alternative solutions include: the interim
use of closed schools to alleviate current needs; the construction
of a major recreation activity center at this time, or later when
the McCalta properties become available, or when some other location
is feasible; the possibility of a community theatre as a part of the
Town Center project; and the renovation of the Clifton C. Miller
Community Center to better serve social and cultural activities.
Concern has been expressed over the cost of needed improvements and
the uncertainty and expense of interim use of "closed" school
facilities. There is also some opposition to specific priorities
and the use of Columbus-Tustin Park as a site for the gymnasium.
Unfortunately, the limited number of alternative solutions leaves
very few..options, and none appear to satisfy all interests or
concerns. There is only one unanimous opinion--there is a critical
need for positive action.
Establishing the critical issues was one of the first tasks of the
Citizens' Advisory Committee after assessing recreation building
facility needs in Tustin. Following study and review of a number
of alternative solutions, a series of specific recommendations were
developed. The Comnittee, along with staff and the Consultant,
present the following issues and recommendations for consideration
and appropriate action:
MULTI-PURPOSE RECREATION ACTIVITY CENTER
Issue No. 1. Should the City of Tustin plan for a major recrea-
tion complex within Columbus-Tustin Park that would permanently
acconmnodate the myriad of public recreation activities, happenings,
and events that serve the athletic, social, cultural, and life
enrichment interests of present and future Tustin residents?
Discussion. It is conservatively estimated that a single complex
to serve the recreation building needs of Tustin residents would
involve a structure of 23,000 to 27,000 square feet. A facility
o¢ this size and complexity could attract up to 350 people a~ one
~ime, requiring parking accommodations for 150 cars. Although it
' is not expected that the building will experience peak loads con-
currently with the lighted sports fields, the majority of this
parking requirement will be in addition to existing parking space.
A proposed program for the recreation complex would include the
following:
A. Life Enrichment - 7,500'square feet*
Three or more classrooms/meeting rooms for a
variety of recreation classes and special
interest activities.
A multi-purpose meeting/crafts room and
two large assembly rooms for scheduling
other life enrichment classes, light
crafts, classes in aerobics and dance, and
group meetings.
B. Social Activities - 4,000 square feet*
1. A large multi-purpose assembly hall {with
operable wall to separate into two smaller
rooms) and a meeting room for serving various
types of social activities scheduled by com-
munity groups, private parties, or City pro-
grams.
2. Facilities could be used with kitchen for lunches,
dinners, or special banquets. Schedule would be
shared with life enrichment classes.
C. Cultural Activities - 2,000 square feet*
A special stage {platform} would be developed as
an adjunct to the large assembly hall for drama and
musical productions. Also, provide a minimum of
two studios for art instruction and performance.
D. Physical Fitness and Sports - 13,000 square feet*
1. A large regulation gymnasium to accon~nodate
*Square footage includes factor for storage, offices, restrooms,
lobby, kitchen, and mechanical.
10.
youth and adult basketball, volleyball and
badminton leagues, some open play, and use
by the Tustin Unified School District.
2. Lockers an~ showers to serve team activities.
· 3. Mat room for acrobatics and gymnastics.
It is impossible to accurately separate the functional categories
of public recreation into specific facilities or square footage
requirements. Not only will there be a certain amount of overlap
between areas of interest, but economic logic will dictate that
most structural facilities should be designed for multi-use, when-
ever practical.
The above square footages generally reflect physical accv,,,,,odations
that are required to alleviate the current deficiencies in Tustin.
This projection is based on a multi-use policy that considers the
compatibility of participants, as well as the conformity of anti-
cipated activities.
The current encumbrance imposed by the unavailability of the McCalla
properties prohibits consideration of either the Life Enrichment or
the Social and Cultural portions of the total complex at this time.
Actually, even with the McCalla property, there is limited space
available for a complex of this scope and complexity. The required
parking and structural space would take the bulk of the land, leaving
little for circulation, set-backs, and park~ use.
It is possible to phase improvements within the available space at
Columbus-Tusttn Park and retain the potential for a quality de-
velopment if the first phase were limited to the gymnasium/locker
room porti~of the total building. Although the gymnasium in-
volves approximately one-half of the floor space of the proposed
recreation complex, its parking requirements would be only one-
third of that required for the recreation activity portion of the
building. Typical use of the gymnasium would require about forty
to fifty parking spaces, or less than one-half an acre of space.
The multi-purpose assembly rooms, meeting room and classrooms
would require approximately 130 parking spaces to serve anticipated
crowds of 300 people, at 2.3 people per automobile.
II.
An alternative to the provision of a total recreation complex
within ¢olumbus-Tustin Park would be ~o plan for the provision
of several activity centers at different locations throughout
the City. Separation would be based on the types of interests
served and the compatibility of activities and projected users.
The dispersal concept is based on the knowledge that most
building-oriented functions are "destination events" -- that
is, the activities are the primary attraction, rather than the
resource itself. Convenience to the participants is paramount.
The creation of a social environment that enhances the quality
of the activity is much more important than its relationship to
a variety of diverse recreation interests and events. This con-
cept would allow the City to make maximum use of all resources~
retain options for the provision of services that are currently
limited by site restrictions at Columbus-Tustin Park; and, not
c~m~it the City to a.course of action now that could preclude a
more desirable solution in the future.
Columbus-Tustin Park is currently identified as a sports com-
plex serving youth and adults in tennis, softball, soccer, and
youth baseball. A gymnasium facility would not only be com-
patible, it would actually augment and enhance the service
potential of the entire complex. Space would be reserved to
replace the existing Life Enrichment facilities located at
Lambert School (when the McCalla properties become available)
· in case permanent facilities cannot be established in a more
Convenient location. Realistically, this option is probably
restricted to facilities that serve smaller groups of 50 to 75
individuals. To also provide for service to social groups or
special events that would attract 200 to 300 persons would re-
quire parking space beyond the capability of the site.
The Clifton C. Miller Community Center facility has the
potential to serve this specialized need.
Recommendation No. 1. It is recon~nended that the City of
Tustin proceed with 'the development of a multi-purpose
gymnasium/locker facility at Columbus-Tustin Park.
12.
CLIFTON C. MIt~R COMMUNITY CENTER
Issue No. 2. Should a cultural center be constructed or leased,
or would it be more cost effective to modify the Clifton C.
Miller Cmm,~nity Center to better accommodate this function?
Discussion. There is a growing interest throughout Southern
California in the recreation-oriented aspect of the performing
arts. Currently, there are no public facilities available within
Tustin that can effectively serve this specialized interest.
The Clifton C. Miller Cu,,,,~nity Center is utilized extensively
for large social activities and special events serving City-
sponsored classes and programs, private groups, and non-profit
community organizations. All users have expressed satisfaction
with the attractive architectural style, central location, and
the expansive floor space (4,350~ square feet). Although the
Center is particularly suited for large social events, there are
a few deficiencies that reduce its effectiveness for most of the
existing uses. The primary concern expressed by many users is the
poor acoustics. Even with public address systems, it iS difficult
to hear speakers or special programs. Additionally, the existing
lighting is deficient for many uses; there is insufficient storage;
and, the outdoor restrooms are both inconvenient for all uses,
inadequate for large events, and not practical for activities that
require controlled access.
Although the absence of adequate lighting and poor acoustics
inhibit use of the building for the performing arts, it is felt
that these deficiencies can be resolved. An unobtrusive rigid
structure can be installed to accm,maodate stage lighting and pro-
vide a remote controlled spot~ Lighting control for stage use would
be from a new panel at the back of the auditorium.
The acoustical problem does not appear to be from reverberation or
echos. The room seems to have a deadening effect on the spoken
word, making it difficult to hear any type of speaker or performance.
Although an acoustical engineer should be consulted, the problem
appears to be correctable and will probably include a good sounding
board as a backdrop, with some acoustical "clouds" suspended to
contain the sound. The staging can, and should be, portable to
retain capacity for other social gatherings.
13.
I
Proposed expansion of storage space and the addition of rest-
rooms would further enhance the capability of this facility
to serve all types of uses.
Recommendation No. ~. It is rec~mnended that the City pro-
ceed with the design of acoustical treatment, a new storage
addition, and special lighting for the Clifton C. Miller
Cbm,unity Center. These improvements would allow for the use
of a portable stage and provide for better sound control and
electrical service to facilitate dramatic, dance, and musical
productions. The addition of restrooms is highly desirable,
but this portion of the improvement program can be phased, if
necessary.
RECREATION ACTIVITY BUILDING
Issue No. 3. There is a definite need to provide permanent
acc~mnodations for the extensive recreation activities, pro-
grams, and life enrichment classes currently scheduled in
leased facilities.
Oiscusston. Currently, the only permanent City-owned recreation
structure within the City is the Clifton C. Miller C~,m~unity
Center located within the Civic Center Complex. This facility
Consists of a single room of approximately 4,300 square feet,
with a small kitchen. The architectural style, as well as the
layout, and relationship to restrooms and service, are not con-
ducive to multi-use, nor can the Center be partitioned into
separate spaces for use by several small groups or classes.
Although there is adequate space for relatively large assemblies,
its use for the typical recreation class or activity is in-
efficient, at best.
The City is leasing Building "C" at the "closed" Lambert School
site. This 7,800+ square foot structure has been altered to
accommodate a wide variety of recreation classes and special
interests. Use is exceptionally heavy, with activities pre-
dominantly of the life-enrichment category, with limited clubs
or special interest, groups served. Additionally, the City is
currently using space in other schools throughout Tustin; how-
ever, availability is encumbered by regular school use and
educationa) priorities.
The balance of the Lambert site is currently being used for
overflow high school classes. Although the School District
expects the high school use to be reduced during t. he next
year or ~wo, long term use of the site cannot be projected.
Investigation has also been made of the Utt School site.
This facility is also "closed" and .currently partially
leased by a church organization. Lambert School is an
elementary school. Utt School was designed for junior
high level, and consequently enjoys more specialized ele-
ments. There is a large multi-use room with stage, a music
room, and a variety of laboratories and shop facilities.
Again, the major portion of this facility could be made
available through a lease program with the School District.
The length of the lerm or the possibility of some permanent
program with the District would appear to depend on the
schedule of development within the Irvine properties.
Another Option that has been discussed is the possible move
of the School District administrative offices to a closed
school site. Should such a move occur, the'existing Admin-
istration Building on "C" Street would become available for
other uses. This structure appears to have significant
potential for recreation use. [ts location and size would
be ideal for senior citizens use, as well as other adult-
oriented activities. Again, the current uncertainties
associated with school projections relegate this possibility
to one of many concepts and options that may become viable in
the future.
Columbus-Tustin Park appears to be the only existing City-
owned site that has/the potential to accmmnodate a major
recreation activity building to replace the Lambert facility.
As previously indicated, the McCalla leasehold prohibits con-
sideration of this option at this time. It should be noted
that there is no indication that the Lambert School facility
will be reclaimed for educational purposes within the imme-
diate future and continuation and possible extension of this
lease with the School District is important.
At this time, it is impractical to project a specific plan
to replace Lambert School, if and when it becomes unavailable.
There appear to be a variety of alternatives, including:
16.
(1) the possibility of one or more school facilities being
declared surplus and made available; (2) dependent on de-
velopment schedule and scope of improvements on Irvine pro-
pertles, a-park site could possibly be available for this
use~ and {3) the Columbus-Tustin site may be used when the
current McCalla properties are available for development.
An option that needs consideration is one that retains the
balance of the Columbus-Tustin Park site (including the
McCalTa properties).as open space and incorporates family
picnic units, a small children's play area, and a passive open
lawn, retaining existing trees where possible. This option
would achieve a much needed balance to the park development,
while providing anciliary benefits for the sports activities.
Tomaintain the current level of recreation service, it is
essential that the City of Tustin either continue the lease.
with the School District for Lambert School, or provide an
adequate' replacement facility. A primary objective at this
point in time. is to keep all options open.
Recommendation No. 3. It is recommended that the City of
Tustin investigate and continue to monitor the availability of
"closed" or potentially surplus public school facilities that
are capable of meeting public recreation needs, and either
purchase or negotiate a long term lease to assure continued
availability for public purposes. Further, that the City
Council recognize the provision of permanent housing for pro-
gram services currently provided at Lambert School as a top
priority, and that evaluation of all possible options be
continued until a suitable plan for the provision of permanent
ecc~mnodations can be established.
The above issues and recommendations reflect the consensus
of the Citizens' Advisory Con~ittee and were developed through
objective study and effort by the individuals involved. The
Committee feels strongly that all three recommendations should
be acted upon with equal resolution. The three issues de-
veloped by the planning ream reflect the essense of an action
program to meet the expressed needs of the community in a
thoughtful and cost-effective manner.
17.
The goal ts to avoid the homogeneity of suburbia--to provide a
living environment that will encourage and enhance individual-
ity. To recognize this goal is to recognize a standard and
quality of urban amenities that cannot be sacrificed or com-
promised.
18.
development concept
Columbus-Tustin Park is classified as a community park and
is currently serving as a sports center, with facilities to
accommodate adult softball, tennis, youth baseball, and
soccer. There are approximately four acres of City-owned
land that are not currently developed for park purposes.
This area includes the McCalla property of l+ acres, leaving
a total of 3± acres available for development at this time.
The City of Tustin is deficient in recreation resources,
particularly in park areas and facilities that are suitable
for the specialized interests of a community-wide nature.
Consequently, the available space within Columbus-Tustin
Park is at a premium, with a number of special interests
vying for consideration. Unfortunately, the absence of
adequate public park space within the City as a whole be-
comes a major factor in the determination of projected uses
within this park area. Because the available space was too
small to meet all specialized needs, the Citizens' Advisory
Committee was forced to consider the question of citYWide
priorities on needs that had little, if any, relationship to
the existing function of Columbus-Tustin Park. Only after
suggested solutions to the major deficiencies had been re-
viewed and evaluated could discussion focus on the compati-
bility of proposed uses to the existing development. Several
concepts were discussed to resolve this dilemma.
One of the newer concepts in recreation planning suggests
that government agencies discard the traditional classifica-
tion system for city recreation areas, and consider the loca-
tion of individual facilities based on the target population
to be served and the relationship of the specific activity to
the immediate surroundings.
Traditionally, urban parks are classified into several cate-
gories based on city planning subdivisions or some other geo-
graphical identification. Specific facilities within each
classification are selected by type and number to serve the
average population of these planning areas. As an example,
if the standard of Service for tennis is one court for every
2,000 people and a neighborhood park serves 5,000 people, each
neighborhood park would have two courts, with the balance of
need assumed by a community park.
19.
Under this traditional system, no consideration is given to the
.relationship between the various recreational activities and
surrounding land uses, or the social barriers created by con-
flicting interests or age groups within the park itself. De-
sign and planning are limited to the puzzle of fitting physical
requirements into the limited space available.
Consequently, we see playgrounds with their hustle and bustle
of sounds and movement immediately adjacent to a seniors' quiet
area$ night-lighted ballfields with their late hours, noise and
light spillage'impacting nearby residential areas; and the
special event sharing restrooms, parking, access, and supervision
with an activity serving a diverse clientele or interest area.
Planners are beginning to understand that recreation is not re-
stricted to the traditional park complex. If we consider the
physical and social environment as a major contributor to the
quality of the experience, then it is time that we took the indi-
vidual activity out from under the umbrella of the traditional
park area, and disperse individual activities into the social
fabric of the co,,u,~nity as a whole. Primary emphasis should be
placed on convenience to projected users, and on the creation of
a physical environment that is compatible with the activity and
will enhance the quality of the experience.
Just think of the advantages of.locating lighted sportsfields for
adults within the industrial sections of the urban area. Late use,
and even all-night use for swing-shift participants, would not have
negative impacts on adjacent properties; concessions could sell beer
without the implication of influencing the children image of the
typical park; and the facility could become a separate profit center
that not only serves a definite need, but also pays its own way.
Cultural centers designed within commercial developments could
blend into the ambiance of sophistication, share the parking,
and benefit from social amenities such 'as restaurants and lounges.
There are similar opportunities in Tustin. While traditionally,
cities anU recreation departments have looked at meeting the
needs of the community through one or two larger facilities that
areall on park land, it seems apparent as we study the alterna-
tives in Tustin that several facilities in different areas of the
City make more sense from a needs standpoint, as well as a
20.
functional standpoint. For example, the following scenario
.could be possible: -.
A multi-use center at a "closed" school, which
would serve community groups with meeting space
as well as classroom space for life enrichment
classes offered by the Community Services De-
partment. The potential also exists for re-
modeling of a mullti-purpose room or the eventual
addition of another large room such as is lo-
cated at the Clifton C. Miller Community Center.
The potential exists to lease a closed school
Site fram Tustin Unified School District, thus
saving construction dollars.
Social and cultural activity space also can prob-
ably be handled adequately with minor alterations'
to the existing Clifton C. Miller Community Center.
The size is roughly equivalent to that proposed in
the original Committee concept, and a remodeling of
the kitchen could resolve deficiencies there. By
addressing the problems of acoustics and lighting,
space could be provided to acco,,w))odate a portable
stage and allow for dramatic, musical, and dance
productions to crowds of 250 or more without limit-
ing the social function.
The gymnasium could be constructed within Columbus-
Tustin Park and provide a compatible expansion of
the athletic function. [t can also be developed
within available space.
Under this same concept, although not a part of
this particular assignment, a senior citizens'
center could effectively be developed within
existing Tustin Unified School District Adminis-
trative offices.
It can be readily seen that while some of these facilities may be
in the future, they are all viable alternatives at this time.
It has been determined that Columbus-Tustin Park can accommodate
a major gymnasium-locker room facility at this time. Although-a
21.
gymnasium will require Foughly the same square feet of floor
-space as the proposed recreation center, it will not require
the same parking capacity. Where a recreation and social
center can and will attract groups of 300 to. 350 people, the
recreation-type gym will rarely attract a total attendance of
100. It should be noted that this gym will not be designed
to serve spectators in any number. While a high school gym
could attract up to 700 or 1,O00 spectators, the teams in the
recreation program would rarely attract 50, including husbands,
wives, and all their kids. This factor reduces traffic to a
minimum, avoids the need for large public restrooms, extensive
bleachers, and crowd control amenities.
The Colu~us-Tustin Park is the major sports center at this
time. The majority of adult softball, youth field sports and
court activities currently are accon~nodated here. The addition
of a gym-and mat room would extend this type of activity to a
year-round program serving similar needs to a large segment of
Tustin. The installation of the gym within Columbus-Tustin Park
would not prohibit the future development of a recreation build-
ing as part of the total complex.
Vehicular access to Columbus-Tustin Park will continue to be from
Prospect Avenue following completion of the gymnasium facility as
depicted in Concept A. The existing parking area has been ex-
panded to provide space for 130 cars. Provision will also be
provided for bicycle parking adjacent to the gymnasium.
Concept B shows the option to locate a recreation activity building
to form a broader service complex if this need warrants future
action. Because of the limited space for parking, this building
does not incorporate facilities to accommodate large groups or
major events. The intent would be to provide a number of small
meeting rooms, studios, and craft rooms to serve the life enrich-
merit portions of service. Additional parking for 60± cars would
be provided with primary access from Beneta Way.
The inclusion of this building along with required parking would
effectively eliminate the proposed picnic, open lawn space, and
play apparatus area contained in Concept A.
22.
ndscap /
Landscaping will reflect the established character of the existing
-park while enhancing the new gymnasium and possible recreation
activity building addition. Throughout the landscape design pro-
cess, care will be exerted to create an aesthetic atmosphere that
will enhance the recreation experience, as well as the visual
quality of the entire are~. Every effort will be made to pre-
serve existing trees where possible.
Irrigation of redeveloped areas will mirror the established auto-
matic system currently being used in the park.
The gymnasium facility is located immediately west of the exist-
ing tennis courts. Extended set-backs from both Beneta Way and
Prospect Avenue will mitigate the impact of this structure on
adjacent developments to the north and west. Building design
incorporates a wrap-around concept with lower roof heights soften-
ing the elevations from 1trine Boulevard and Prospect Avenue. The
set-back.from Beneta Way will allow for ample landscaping to re-
duce the appearance of size and height..
The building contains a 102 foot by 90 foot g3nnnasium with a 26
foot clear ceiling; a 62 foot by 30 foot mat room with a 20 foot
ceiling; two team locker facilities with showers; a large storage
facility of over 600 square feet; restro°ms for participants and
spectators; and a small control office with equipment storage.
The entrance is located at the southwest corner with direct
access from the parking lot. The control office includes a pass-
through window with visual access to the entrance, as well as the
gym floor. A small ticket window is provided out of an adjacent
storage room for possible events or tournaments that may require
this type of control.
For basketball, the gymnasium provides for either a championship
84' x 50' center court or two 7¢' x 42' cross courts. Volleyball
enjoys a similar arrangement. Badminton will have three cross
courts..For both volleyball and basketball center courts, there
will be roll out seating along the easterly wall to accommodate
seating for spectators. The floor will be commercial grade parquet
hardwood, "floating" on a double thickness of plywood and stringers.
23.
The mat room will have a 20' high ceiling to accommodate vault-
ing and rings. This 30' by 60' room is designed to serve
classes and training in acrobatics and gymnastics. A large
{18' x 30') storage area with access to both the g3nn and the
mat room will provide for adequate storage of mats, vaults,
standards, balance beams, and other required materials and
equipment. Its 20 foot high ceiling will also provide space
for off-season storage in a loft.
Uni-sex team lockers and showers are provided for competing
teams of either sex. Layout provides for separate access from
adjacent restrooms to allow for both spectator and participant
use of restroom facilities concurrently. Restrooms have also
been designed to allow for outside access to serve the tennis
courts.
The structure would not be air conditioned, but would have a
good ventilation system. See Floor Plan.
fly. re devek n
The site design was carefully developed to retain alternative
options for future improvements after the McCalla properties
become available. The gymnasium can serve as the single
structure within the park, and future improvements can involve
the development of a picnic area, open lawn areas, and a child-
ren's play apparatus area. These facilities would be ancillary to
the gym and sportsfields and serve to expand and enhance their
use. See Site Plan A.
A second alternative that remains open is the potential to con-
struct a second structure to accommodate recreation classes,
a variety of crafts and visual arts, as well as the ongoing
special interest activities such as bridge, chess clubs, photo-
graphy, etc. Scope of this second structure should be limited
to about 7,500 to 8,000 square feet. It is suggested that this
addition should not be designed to accommodate the large social
or cultural event involving 200 or more participants due to the
inability to provide adequate parking.
With this limitation, a second parking area for 60± cars would
adequately serve the second facility. A central plaza between
the gymnasium building and the recreation activity center would
serve to'separate participants and provide convenient access
from the two parking areas. See Site Plan B.
26.
cos anabys
Cost estimates have been prepared using latest costing informa-
tion, including comparisons to similar projects or facilities
'that have been constructed during the last six months period.
No allowance has been made for future inflation, and these
estimates should be periodically updated during the preparation
of construction plans.
Cost estimates exclude any projections for improvements to the
McCalla property. Furthermore, since the absence of the McCalla
property would render the balance of the open space to Beneta
Way unusable, costs do not reflect use areas or equipment such
as the play apparatus area or picnic facilities.
PROPOSED IMPROVEMENTS - PHASE
1. Gymnasium/Locker Rooms
2. Parking Lot Expansion and Renovation
3. Concrete Curbs, Slabs and Walks
4. Landscaping
5. Irrigation
Overhead and Profit g 10%
TOTAL ESTIMATED COSTS
$974,400.00
65,000.00
34,000.00
30,500.00
32,000.00
$1,135,900.00
113,-500.00
$1,249,400.00
PROPOSED IMPROVEMENTS - CLIFTON C. MILLER COMMUNITY CENTER
PHASE 1
1. Acoustic Treatment (including
sound walls)
2. Electrical Improvements
3. Storage Facility (306 sq. ft.)
Overhead and Profit @ 10%
$ 30,200.00
24,600.00
19~890.00
$ 74,690.00
7,469.00
$ 82,159.00
29.
PROPOSED IMPROVEMENTS - CLIFTON C.. MILLER COMMUNITY CENTER (continued)
PHASE 2
1. Restrooms $ 76,600.00
PROPOSED FUTURE RECREATION ACTIVITY BUILDING
1. Structure--8,000± sq. ft.
2. Site Improvements
$600,000.00
126~000.00
$726,000.00
PROPOSED ADDITIVE ALTERNATIVE - PHASE 1 - COLUMBUS-TUSTIN
PARK IMPROVEMENTS
l. Orange County Flood Control Properties
$ 32,400.00
PROJECTED MAINTENANCE AND .OPERATIONAL COSTS (ANNUAL).
PHASE I - COLUMBUS~TUSTIN PARK
1. Gymnasium
2. Site Improvements
TOTAL ESTIMATED M & 0 COSTS - PHASE
69,000.00
25,960.00
94,960.00
The above estimated costs include personnel, equipment, and materials,
as well as an estimated overhead factor.
30.
btalding design
The Design Development Report is for the purpose of establishing
scope and to control the functional aspects of the ultimate pro-
ject. It is not the intent of this document to dictate archi-
tectural style, building materials, or elevation designs except
where these elements affect the basic function of the project.
As an example, the report has recommended that the building de-
sign be compatible with adjacent uses and that design reflect an
effort to mitigate the impact of the structure from the street.
The actual selection of materials, roof styles, elevations, etc.,
will be resolved during the preparation of preliminary construction
plans and specifications under the direction of William E. Skinner,
the architect for the project.
BUILDING:... COLUMBUS-I~JSTIN GYMNASIUM
ROOM:
FUNCTION:
CONTROL
This room will serve as the control center for the
building and house the attendant. Visual control
of the entrance and the gymnasium floor is
necessary.
SPECIAL
UTILITIES:
SPECIAL
AMENITIES:
Provide simple one-way P.A. system to announce
messages for paging individuals or enforcing
schedules, rules, etc. Speakers in mat room,
gymnasium, restrooms and locker rooms. Capable
of selective direction to (1) mat room, (2) gym,
and (3) restrooms and locker rooms.
Special cabinets to store issuable sports equip-
ment such as balls, nets, racquets, etc. Must
be designed with City staff approval.
Counter-top desk with drawers. Wire glass in window
with pass-through capabilities and keyed locks.
FINISHES:
Floor: Vinyl tile.
Walls: Paint
Ceiling: Acoustical.
31.
BUILDING:
~OOM:
FUNCTION:
SPECIAL
UTILITIES:
SPECIAL
AMENITIES:
FINISHES:
COLUMBUS-TUSTIN GYMNASIUM
GYM
House a variety of team and individual sports
activities. May, on occasion, have special
events with heavy participation.
Heating and heavy ventilation.
Pay telephone in secondary lobby.
Electrical outlets for maintenance and refinishing.
Lighting designed at two levels of intensity.
door to be hardwood (co~nercial grade).parquet
on two layers of plywood or hardwood strips on
stringers.
Striping to accommodate the following:
Basketbal 1:
Volleyball:
Badminton:
One center court - 84'-0" x 50'-0".
Two cross courts - 74'-0" x 42'-0".
Retractable backstops where fixed
position would encroach on sight
lines or play areas.
One center court
Two crosscourts
Suitable floor fasteners for standards.
Three cross courts
Suitable floor fasteners for standards.
Acoustic treatment required. Must be resistant to
balls.
Rollaway bleacher seating for 100 people.
Floor: H&rdwood' parquet or' regular hardwood {9/16" thick)
Ceiling: Acoustic panels on plywood.
Walls: Painted.
32.
BUILDING:
OOM:
FUNCTION:
SPECIAL
UTILITIES:
SPECIAL
AMENITIES:
FINISHES:
COLUMBUS-TUSTIN GYMNASIUM
MAT ROOM
Conduct classes and provide space for practice in
gymnastics and acrobatics.
Heating and ventilation.
Ceiling and roof structure should be designed to
receive gymnastic rings and training aids at
variable locations. Should be coordinated with
staff.
Ceiling shall have 20'-0" clearance as may be
required.
Floor: Vinyl tile.
Ceiling:
Walls: Painted.
33.
BpILDING: COLUMBUS-TUSTIN GYMNASIUM
ROOM:
FUNCTION:
SPECIAL
UTILITIES:
'SPECIAL
AMENITIES:
FINISHES:
LOCKER ROOMS
Provide space for dressing for competing teams.
Heating and ventilation.
Must be designed for security (locked doors) during
competition. Can be used by either males or females.
Provision should be made for coin locker installation
on raised step. Rooms should drain adequately and be
designed for hosing down or wet mopping.
Showers.should be group showers with tile floors and
walls.
Floor:
Ceiling:
Walls:
Polished concrete with coves at wall and
locker steps.
Painted.
Painted.
34.
BqILDING:
ROOM:
FUNCTION:
SPECIAL
UTILITIES:
SPECIAL
AMENITIES:
FINISHES:
COLUMBUS-TUSTIN GYMNASIUM
MEN AND WOMEN RESTROOMS
Plastic laminate partitions.
Counters--plastic laminate.
Spittoon and drinking fountain on gym side.
Floor: Ceramic tile.
Ceiling: Paint.
Walls:' Tile.
35.
BUILDING:
OOM:
FUNCTION:
SPECIAL
UTILITIES:
SPECIAL
AMENITIES:
FINISHES:
COLUMBUS-TUSTIN GYMNASIUM
STORAGE
Storage for mats, gym and gymnastic equipment.
Partial loft with ladder access for off-season storage.
Floor: Polished concrete.
Ceiling: Unfinished.
Walls: Pminted.
36.
possible, environmental impacts
This preliminary evaluation of environmental conditions and
.possible impacts has been made without the benefit of thorough
scientific assessments or testing techniques. These preliminary
findings are based on visual inspection of the site; comparison
with similar projects; and a working knowledge of the £1R process.
The primary intent is to identify critical impacts early in the
design program so that solutions reflect both environmental con-
cerns and functional criteria.
The transition from an open undeveloped field to a landscaped
area with a functional gymnasium offering amenities not currently
available in the community is direct, major, and extremely bene-
ficial. The proposed gymnasium will be designed to be compatible
with adjacent developments and will contribute to the recreational
and aesthetic character of Tustin as a whole and the surrounding
neighborhood.
Because of the closed design of the gymnasium, it is not expected
that this addition will contribute to existing noise levels to a
discernable degree. In fact, due to the mass of the building, it
is expected that adjacent properties to the north will realize
diminished noise from the existing sportsfields. During con-
struction, there may be significant, though temporary increases
in noise level. Control of construction noise will require en-
forcement of construction specifications and inspection. Noise
generated from park maintenance equipment will continue to be
controlled by adequate muffler devices and work scheduling. Pro-
gram scheduling will control organized activities and the noise
they generate.
By adding the gymnasium to Columbus-Tustin Park, additional
traffic (vehicular and bicycle} will be experienced in the imme-
diate vicinity of the park. Normal scheduling of recreation
activities avoids major conflicts with existing peak traffic
37.
loads caused by school transportation or during' periods prior to
and after regular working hours.
Impacts are direct, minor, and adverse. Mitigation measures in-
clude the provision of an additional 40 off-street parking stalls
to accommodate gymnasium users; provision of bicycle parking
facilities; and a redesign of the existing parking lot to improve
access from and egress to Prospect Avenue.
nec dean
A careful evaluation of the Negative Declaration of Environmental
Impact as adopted by the Tustin City Council on September 20,
1976, reveals that the proposed development of the gymnasium does
not alter anticipated environmental impacts significantly while
the'proposed site improvements are genera.lly consistent with
improvements projected in 1976. The 1976 report referred to the
designation of this site for a "co,m~unity cultural arts center"
and other improvements to "serve a multi-functional purpose"
aimed at providing a wide range of recreational programs and
activities of interest to Citywide residents.
It is submitted that the gymnasium will generate negative impacts
of a lesser magnitude than those contained in the original pro-
posal. It would appear that the negative declaration adopted in
1976 would be adequate to cover environmental assessment require-
ments.