Loading...
HomeMy WebLinkAboutOB 1 AMD P.M. 84-1032 10-21-85DATE: OLD BUSINESS '~ I- J>~ -21-85 Inter Corn OCTOBER 21, 1985 TO: FROM: S U BJ ECT: HONORABLE MAYOR AND CITY COUNCIL MEMBERS COMMUNITY DEVELOPMENT DEPARTMENT AMENDMENT TO CONOITION NO. 19 OF PARCEL MAP 84-1032, TUSTIN AUTO CENTER APPLICANT: The Irvine Company. LOCATION: Approximate location of area is bounded by the I-5 Freeway on the south, Browning Avenue on the west, Bryan Avenue on the north and Myford Road on the east. REQUEST: To amend the October 15, 1985 completion date for the E1Modena Channel improvements shown in Condition No. 19 of Parcel Map 84-1032. RECOMMENDED ACTION: Staff recommends that the City Council, by adoption of Resolution No. 85-106, accept the recommendation of the Planning Commission and adopt the amendment to Condition No. 19 of Parcel Map 84-1032 and set the completion date at May 15, 1986, subject to the following additions to Condition No. 19. That The Irvine Company pursue with all speed the O.C.E.M.A. approval of alignment change, geometric configuration of channel, hydraulic design, construction drawings for ultimate undercrossings at Bryan Avenue and at E1 Camino Real, and issuance of construction permits for channel by-pass construction at Bryan Avenue. City approval of interim channel improvements will be eligible for Assessment District reimbursement only to the extent that they are utilized in the ultimate channel design/improvement. That The Irvine Company shall execute an agreement between The Irvine Company and City of Tustin for said interim channel improvements, wherein The Irvine Company will be responsible for all maintenance of said channel, liability resulting from said channel and all silt removal downstream of said channel which is determined to originate from said earth channel. October 21, 1985 Amendment to Condition No. 19 page two SUF1FIARY: Condition No. 19 of the subject parcel map required certain off-site improvements to the E1Modena Channel. Those included: a) b) removal of the bridge structure located at 2121-2125 Bryan Avenue; and the reconstruction of the box culvert at the Bryan Avenue undercrossing easterly of Browning Avenue to the satisfaction of the City Engineer. These improvements were to commence prior to or concurrent with the issuance of building permits, and were to be completed by October 15, 1985. Section {a) has been completed, but Section (b) will not be completed by October 15, 1985. The Irvine Company is requesting that this October 15, 1985 date be amended to May 15, 1986. The Planning Commission considered this request with the support data and public input at its meeting of October 21, 1985. The Commission adopted Resolution 2275 by a vote of 4 ayes to 1 hoe, to recommend the amendment to the Condition 19 to May 15, 1986 to the City Council. The Planning Commission staff report of October 14, 1985 has been enclosed for your review. El)WARD M. KNIGHT Senior Planner EMK:em Cornrnunity Development Department 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 85-106 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OV TUSTIN, ADOPTING AN AMENDMENT TO CONDITION NO. 19 OF PARCEL MAP 84-1032 TO A COMPLETION DATE OF MAY t5, 1986 FROM OCTOBER 15, 1985, SUBJECT TO ADDITIONS TO CONDITION NO. 19 The City Council of the city of Tustin does hereby resolve as follows: I. The City Council finds and determines as follows: Ao That Parcel Map No. 84-1032 was submitted to the City Council pursuant to Ordinance No. 847 by The Irvine Co. for the purpose of creating 16 lots from a portion of Lots 22, 23, 26, and 27 of Block 44 of Irvine's Subdivision per a map filed in Book 1, Page 88 of Miscellaneous record maps, Orange County, California. That The Irvine Co. is requesting an amendment to Condition No. 19 of said Parcel Map, requesting that the completion date for improvements to the E1 Modena Channel be amended from October 15, 1985 to May 15, 1986. C. That said map is in conformance with the Tustin Area General Plan. D. An Environmental Impact Report (84-2) has been certified to comply with the California Environmental Quality Act'. That the Planning Commission has adopted Resolution No. 2275, recommending to the City Council that the subject amendment to Condition No. 19 be adopted. II. The City Council hereby adopts the amendment to Condition No. 19 of Parcel Map 84-1032 to show a completion date for improvements to the E1 Modena Channel to May 15, 1986, subject to the following conditions: All other conditions of Parcel Map 84-1032 are still valid and unchanged. Be That the following additions to Condition No. 19 shall be included: That The Irvine Co. pursue with all speed the O.C.E.M.A. approval of alignment change, geometric configuration of channel, hydraulic design, construction drawings for ultimate undercrossings at Bryan Ave. and at E1 Camino Real, and issuance of construction permits for channel by-pass construction at Bryan Ave. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Resolution No. 85-106 page two 2o City approval of interim channel improvements will be eligible for Assessment District reimbursement only to the extent that they are utilized in the ultimate channel design/improvement. e That The Irvine Co. shall execute an agreement between The Irvine Co. and city of Tustin for said interim channel improvements, wherein The Irvine Co. will be responsible for all maintenance of said channel, liability resulting from said channel and all silt removal downstream of said channel which is determined to originate from said earth channel. PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on the day of , 1985. Attest; FRANK H. GREINKE, Mayor MARY E. WYNN, City Clerk 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 26 27 28 RESOLUTION NO. 2275 A RESOLUTION OF THE PLANNING COMMISSION OF TNE CITY OF TUSTIN, RECOMMENDING TO THE CITY COUNCIL THAT CONDITION NO. 19 OF PARCEL MAP 84-1032 BE AMENDED TO A COMPLETION DATE OF MAY 15, 1986 FROM OCTOBER 15, 1985, SUBJECT TO ADDITIONS TO CONDITION NO. 19 The Planning Commission of the city of Tustin does hereby resolve as follows: I. The Planning Commission finds and determines as follows: Ae That Parcel Map No. 84-1032 was submitted to the City Council pursuant to Ordinance No. 847 by The Irvine Co. for the purpose of creating 16 lots from a portion of Lots 22, 23, 26, and 27 of Block 44 of Irvine's Subdivision per a map filed in Book 1, Page 88 of Miscellaneous record maps, Orange County, California. Be That The Irvine Co. is requesting an amendment to Condition No. 19 of said Parcel Map, requesting that the completion date for improvements to the E1 Modena Channel be amended from October 15, 1985 to May 15, 1986. Tha~ said map is in conformance with the Tustin Area General Plan. D. An Environmental I.mpact Report {84-2) has been certified to comply with the California Environmental Quality Act. II. The Planning Commission hereby recommends to the City Council that Condition No. 19 of Parcel Map 84-1032 be amended to show a completion date for improvements to the E1Modena Channel to May 15, 1986, subject to the following conditions: A. All other conditions of Parcel Map 84-1032 are still valid and unchanged. That the following additions to Condition No. 19 shall be included: That The Irvine Co. pursue with all speed the O.C.E.M.A. approval of alignment change, geometric configuration of channel, hydraulic design, construction drawings for ultimate undercrossings at Bryan Ave. and at E1Camino Real, and issuance of construction permits for channel by-pass construction at Bryan Ave. 5 ? 8 9 10 11 12 13 14 15 16 17 18 19 2O 22 23 24 25 26 27 28 Resolution No. 2275 page two 2. City approval of interim channel improvements will be eligible for Assessment District reimbursement only to the extent that they are utilized in the ultimate channel design/improvement. 3. That The Irvine Co. shall execute an agreement between The Irvine Co. and city of Tustin for said interim channel improvements, wherein The Irvine Co. will be responsible for all maintenance of said channel, liability resulting from said channel and all silt removal downstream of said channel which is determined to originate from said earth channel. PASSED AND ADOPTE~at a regular~eti~g o~ the Tustin Planning Commission, held on the ~_.~,~/ day of y~f..Z~J--~.q--~ , 1985. i~01~NA' ORR, RECORDING'SECRETARY KATHY WEIL, Chairman Report to the Plannin Commission ~TEM NO. 3 DATE: SUBJECT: APPLICANT: LOCATION: OCTOBER 14, 1985 AMENDMENT TO CONDITION 19 OF PARCEL HAP 84-1032, TUSTIN AUTO CENTER THE IRYINE COMPANY APPROXIMATE LOCATION OF AREA IS BOUNDED BY THE I-5 FREENAY ON THE SOUTH, BROWNING AVENUE ON THE WEST, BRYAN AVENUE ON THE NORTH AND MYFORD AVENUE ON THE EAST. REQUEST: TO AMEND THE OCTOBER 15, 1985 COMPLETION DATE FOR THE EL MODENA CHANNEL IMPROVEMENTS DETAILED IN CONDITION NO. 19 OF PARCEL MAP 84-1032. BACKGROUND: On January 14, 1985, the Planning Commission adopted Resolution No. 2207 recommending that Parcel Map 84-1032 be approved by the City Council. The City Council approved this parcel map at its January 21, 1985 meeting, by the adoption of Resolution No. 85-11. In keeping with the recommendation of flood studies prepared for the environmental impact report, a condition was added to the map that detailed certain off-site improvements to the E1 Modena Flood Channel. These improvements included: a) removal of the bridge structure located at 2121-2125 Bryan Avenue; and b) the reconstruction of the box .culvert at the Bryan Avenue undercrossing easterly of Browning Avenue to the satisfaction of the City Engineer. These improvements were to commence prior to or concurrent with the issuance of building permits, and were to be completed by October iS, 1985. Section (a) has been completed, but Section (b) will not be completed by October 15, 1985. The Irvine Company is requesting that this October 15, 1985 date be amended to May 15, 1986. DISCUSSION: In evaluating this request, the main issues that surface include the timetabl~ for improvements to the channel in accordance with the map condition, and the impact on the drainage system in the area by improvements to the Auto Center and Phase I site. Community Development Department Planning Commission Auto Center page two Enclosed with this staff report is a letter from The Irvine Company outlining the process involved to construct improvements to the E1 Modena Channel. Briefly, in order to optimise retail development in the Mixed Use area east of the Auto Center, it was determined that the E1 Modena Channel should be relocated adjacent to the Tustin Auto Center. This new ~lignment of the channel has impacted the scope of improvements and the schedule for constructing the improvements. Although the County is not concerned with the new location of the channel, processing the plans for approval through the County has been difficult and has caused delays. Plans have been submitted to the County and still are being processed through the O.C.E.M.A. for approval. In order to meet the Tustin Auto Center/Phase I residential flood control requirements, The Irvine Company, working with the City Engineer, propose the following program: Obtain permits and construct a bypass along an east-west section of the E1 Modena Channel, as shown in the enclosed exhibit. Start construction on the ultimate facilities for the bridge and channel sections at Bryan Avenue and E1Camino Real, when the bypass is complete. o Grade, Construct and open an interim channel from Bryan Avenue to the connection near the Santa Ana freeway, located approximately 470 feet westerly of the existing E1 Modena Channel, along the Eastern boundary of the Auto Center. By relocating the interim earth channel, the construction of these interim facilities and channel undercrossings at Bryan Avenue and E1 Camino Real would be in a dry condition, and not subject to the O.C.E.M.A. restriction on channel work after October 15th. The Company anticipates that the permit to start this construction can be secured by October 31, 1985. They further anticipate that all improvements can be completed, barring unforeseen problems, by April, 1986. The Company is requesting, with a reasonable contingency, that Condition No. 19 be altered from a completion date of October 15, 1985 to May 15, 1986. Although the undercrossing of Bryan Avenue will be an ultimate facility and meet the intent of Condition No. 19(b), the remaining channel is an interim earth facility, and O.C.E.M.A. will not accept or maintain the channel. They will not accept this responsibility until the ultimate channel is completed; and this is scheduled to occur with the formation of the assessment district. It will be the responsibility of the city to assume the maintenance/liability of this interim facility. Since this proposal comes from The Irvine Company, the financial/operational responsibilities of the maintenance program should not be borne by the city. It is recommended that The Irvine Company, through an agreement with the city, be responsible financially and operationally for said responsibilities. Community Development Department Planning Commission Auto Center page three The other issue is the impact of improvements in the area without the construction of the box culvert under Bryan Avenue. The approvals of the Auto Center and Phase I covered an area approximately bounded by Browning Avenue, Bryan Avenue, the I-5 freeway, and the eastern boundary of the Auto Center. To this date, the Auto Center site has been rough graded and bermed and Phase I is being rough graded and bermed to the railroad berm. No grading has taken place west of the berm. The current assessment of drainage conditions in the area is drawn from the flood control report prepared by Robert Bien William Frost & Associates (RBF) for the environmental impact reports done for each project. A representative from RBF will be at the Commission meeting to further elaborate on this subject. According to the report, the removal of the bridge adjacent to Bryan Avenue increased the conveyance of the channel from 700 cbs to 1350 cfs. This measure will reduce the frequency of flooding along Browning Avenue. Eliminating the two restrictions causes a reduction in the flooding depth that the residents along Browning Avenue will experience. The report goes on to say that creating a berm around the Auto Center site displaces the.greatest volume of water because of the location of the natural sump in the south east corner. The volume displaced by this project amounts to 76 acre feet which creates a five-inch rise in water surface in surrounding areas. The influence of this rise in water surface level would extend westerly to the existing railroad embankment where existing topographic features will prevent the spread of flood water. According to this report, the grading and berm of the Auto Center will not affect the flooding potential in existing residential areas, which are west of the railroad embankment. Currently, no grading has been allowed west of the railroad embankment. According to the exhibits enclosed, this area is the main storage for shallow flooding conditions, with areas east of the embankment left unaffected by the flood water. Preventing grading west of the railroad embankment should serve the purpose of leaving the surrounding area in the same state of flood potential as in previous years. In reality, the removal of the bridge as a restriction should improve conditions in the area by reducing the flooding depth along Browning. Although staff cannot condition the Auto Center parcel map to prevent grading in another tract, the tract in question (no. 12345) has a condition {no. 30) which prevents the issuance of a grading plan until a storm drain phasing plan has been prepared and submitted by The Irvine Company and approved by the City Engineer. This plan has been completed by the Company and reviewed by the City Engineer. It is the determination of the City Engineer that no grading should take place west of the railroad embankment until the interimby-pass channel and and overflow weir have been constructed. Community Development Department Planning Commission Auto Center page four It must be noted that even with the required off-site improvement, the E1Modena Channel will still be under capacity for areas north of Bryan/Browning, through the project area, and south Qf the I-5 freeway. The proposed assessment district will cause the channel to be improved to ultimate capacity for the project area, approximately from Bryan/Browning to the Santa Aha Freeway (I-5), yet the berms must stay in place until ultimate channel improvements are made within the upper tributaries of the channel. To quote RBF's report: "At the present time, there is no advantage to constructing ultimate channel improvements for the reach adjacent to the project since no measurable level of increased flood protection would be achieved due to the under-capacity of existing channel facilities in the upper reaches of the watershed." RECOMMENDATION: Staff recommends that the Planning Commission, by the adoption of Resolution No. 2275, recommend to the City Council that Condition 19 of Parcel Map 84-1032 be amended and that the completion date be set at May 15, 1986 instead of October 15, 1985, subject to the following additions to Conditions No. 19. That The Irvine Company pursue with all speed the O.C.E.M.A. approval of alignment change, geometric configuration of channel, hydraulic design, construction drawings for ultimate undercrossings at Bryan Avenue and at E1 Camino Real, and issuance of construction permits for channel by-pass constructidn at Bryan Avenue. o City approval of interim channel improvements will be eligible for Assessment District reimbursement, only to the extent that they are utilized in the ultimate channel design/improvment. o That The Irvine Company shall execute an agreement between The Irvine Company and city of Tustin for said interim channel improvements, wherein The Irvine Company will be responsible for all maintenance of said channel, liability resulting from said channel and all silt removal downstream of said channel which is determined to originate from said earth channel. EI~WARD M. KNIGHT, Senior Planner EK:do enc.: Irvine Co. letter dated Oct. 1, 1985 Memo from Bob Ledendecker, dated Oct. 8, 1985 exhibits . Community Development Department IRVII COMMUNITY DEV LOPMC-'NT COMPANY October l, 1985 Mr. Donald Lamm Director of Community Development City of Tustin 300 Centennial Way Tustin, California 92680 Re: Tentative Parcel Map 84-1032 (Tustin Auto Center) Tentative Tract Map 12345 (Phase I Residential) Dear Don: As you know during the time since approval of Tentative Parcel Map 84-1032 and Tentative Tract Map 12345 we have been working with the County of Orange and Bob Ledendecker, the City Engineer, in regards to the improvements to the E1Modena Channel. During this process a number of changes have occurred to the work program and schedule to make the required improvements. In evaluating the future retail development opportunities in the mixed use area it was determined that the relocation of the E1Modena Channel adjacent to the Tustin Auto Center was the best ultimate alignment. This allows the mixed use area to be planned for optimal use in a manner beneficial to both The Irvine Company and the City of Tustin. The enclosed map illustrates the new planned channel location. The County of Orange, who wilt ultimately maintain the channel, has been reviewing our studies and have not expressed any concerns with the new channel alignment. Unfortunately, the new alignment of the channel has impacted the scope of improvements and the schedule for constructing the improvements. The processing for approval of the 'improvements with the County of Orange has also been difficult and has delayed us significantly. The county has just recently agreed to check the construction plans which they have had since June. In an effort to meet the Tustin Auto Center/Phase I Residential project's flood control requirements and the county requirements, we have, along with Bob Ledendecker, worked out the following program. Obtain permits to construct a bypass of the existing channel to allow construction of the Bryan Avenue crossing. The same permit would allow 'a tie in of the future channel near the freeway. This will allow the existing channel to remain operational until the new alignment of the channel is complete. It will also allow work on the new channel facilities to proceed into the rainy season after October 15th. 550 Newoorl Center Drive, BO. Box I, Newport Beach, Califorma 92658-8904 (714) 720-2000 A O~v,s,on of The Irv~ne Company Letter, Mr. Lamm October l, 1985 Page Two 2. Start construction of the bridges and channel section at Bryan Avenue and E1Camino Real when the bypass is complete. 3. Grade, construct and open an interim channel from Bryan Avenue to the connection near the Santa Ana freeway. The attached schedule outlines the dates for processing and construction. Unfortunately, the work program for the channel and the processing has taken longer than anyone anticipated and it is not possible to complete the modifications to the channel as specified in condition #19 of the Conditions of Approval for Tentative Parcel Map 84-1032. As you know, that condition required removal of the bridge structure along Bryan Avenue (which has been completed) as well as reconstruction of the box culvert undercrossing at Bryan Avenue by October 15, 1985. The attached schedule is current and contains our most optimistic thinking with no contingency for delays due to rain or unforseen processing problems with the county. In conjunction with this schedule and a reasonable contingency we request that Condition #19 of the Conditions of Approval for Tentative Parcel Map 84-1032 be amended to change the completion date from October 15, 1985 to May t5, 1986. It has always been our intent that the interim channel improvements be completed as soon as possible. This is still our goal. We feel that the work program identified in this letter is the first step towards completing regional flood control improvements. We think you will agree that it is critical that this matter be heard before the Planning Commission prior to October 15, 1985. If there is anything we can do to help you expedite this matter please let us know. Sincerely, THE IRVINE COMMUNITY DEVELOPMENT COMPANY Michael C. Ellis Vice President, Land Development 10. Pro ect Submit project report and interim channel plans to county. Met with county to review report and interim channel plans. Received county con~ents, revise and resubmit report. Received county coammnts, revise and resubmit report. Submit permit application for temporary bypass channel. Receive county comments, revise and resubmit report· Start county review of interim plans. County approval of project report. County approval of permit for bypass channel and start construction. City approval Of bridge plans for Bryan Avenue and E1 Camino Real Start construction.of Br~an Ave. and E1Camino Real .bridges. 12. County approval of interim channel 'Flans 13. Complete construction of bridges 14. 15. Start interim channel improvements Complete and open interim channel. Date Dune, 1985 Duly, 1985 August, 1985 September, 1985 September, 1985 October 3, 1985 October 7, 1985 October 31, 1985 October 31, 1985 November, 1985 November,:.lg85 _De·ember, 1985 February, 1986 February, 1986 April, 1986 Status Complete Complete Complete Complete Complete Complete Complete In Process Permit in Process Plans .in Process Plans in Process DATE: OCTOBER 8, 1985 TO: FROM: SUBJECT: DON LAMM, COMMUNITY DEVELOPMENT DIRECTOR BOB LEDENDECKER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER PARCEL MAP NO. 84-1032 BACKGROUND: The following is a recap of past City actions pertaining to Parcel Map No. 84-1032 (Tustin Auto Center): January 14, 1985 Planning Commission adoption of Resolution No. 2207 recommending approval of Tentative Parcel Map No. 84-1032 as conditioned. January 21, 1985 City Council adoption of Resolution No. 85-11 approving Tentative Parcel Map No. 84-1032 as conditioned. June 10, 1985 Planning Commission adoption of Resolution No. 2245 recommending approval of Final Parcel Map No. 84-1032 as conditioned. June 17, 1985 City Council adoption of Resolution No. 85-87 approving Final Parcel Map No. 84-1032. The Irvine Company, subdivider of the properties within Parcel Map No. 84-1032, have requested an amendment to Condition No. 19 of Parcel Map No. 84-1032. Condition No. 19 reads as follows: ° Modifications to improve flood control capabilities of the E1Modena- Irvine Flood Control Channel consisting of: a. Removal of bridge structure located at 2121-2125 Bryan Avenue. The reconstruction of the box culvert at the Bryan Avenue under- crossing easterly of Browning Avenue to the satisfaction of the City Engineer. Said modifications shall be commenced prior to or concurrently with the issuance of building permits for any structures in the project area with completion on or prior to October 15, 1985. The Irvine Company is requesting an amendment to the above mentioned Condition No. 19. As of the writing of this memo, the scope of the amendment has not been defined in writing by The Irvine Company. PARCEL MAP NO. 84-1032 OCTOBER 8, 1985 PAGE 2 DISCUSSION: At the time of the final parcel map approval when Condition No. 19 was applied, The Irvine Company plan was to make the required improvements to the E1 Modena-Irvine Channel undercrossing of Bryan Avenue within the existing alignment of the facility. Hence, the completion dates of October 15th were applied as requirements of theOrange County Environmental Management Agency (O.C.E.M.A.) or Flood Control District. These requirements do not allow any substantial reconstruction/work within a major waterway between October 15th and April 15th under normal circumstances. Since the initial parcel map approval, The Irvine Company has opted to realign the E1Modena-Irvtne Channel approximately 470 feet westerly to the easterly edge of the Auto Center. This relocation will provide the following: ° Composite land mass between the Channel and Myford Road for improved land use and development. Potenti al E1 Cami no O.C.E.M.A for constructing channel undercrossings at BrYan Avenue and Real in a dry condition, which would not be subject to the · construction date restrictions. As of this date, The Irvine Company has completed a portion of Condition 19. This completed portion is Section "a", which consists of the removal of the bridge structure located at 2121-2125 Bryan Avenue. In addition to this removal, The Irvine Company has also removed the abandoned A.T. and S.F. Railroad bridge across the channel which also served as a constriction to storm flows. Due to the realignment of the channel, Condition 19b has not been commenced. Plans are still being processed through O.C.E.M.A. for approval. The major components of the project approval are as follows: Change of alignment Geometric configuration of channel Hydraulic design Issuance of permit for channel bypass construction Construction drawings Until these approvals/confirmations have been received from O.C.E.M.A. the Bryan Avenue undercrossing can not be commenced. The Irvine Company proposes to construct an interim earth channel between Bryan Avenue and the I-5 Freeway as well as the ultimate facilities at the Bryan Avenue and E1Camino Real undercrossings. The O.C.E.M.A. will not accept/maintain an interim earthen facility due to their major concerns pertaining to erosion and silt deposition downstream. In order to build this interim facility it will be necessary for the City to assume the maintenance/liability of the interim earthen channel, as well as the responsibility for all downstream silt removal resulting from said interim channel. The financial/operational responsibilities of the maintenance program should not be borne by the City, therefore, it is suggested that The Irvine Company, through an agreement with the City, be responsible financially and operationally for said responsibilities. TENTATIVE PARCEL MAP NO. 84-1032 OCTOBER 8, 1985 PAGE 3 The realignment of the E1Modena-Irvine Channel creates an additional problem with respect to the timing and construction of E1Camino Real (Laguna Road) as it relates to crossing the existing E1Modena-Irvine Channel. This existing channel cannot be abandoned/removed until such time the ultimate realigned channel is completed by Assessment District construction and accepted by the O.C.E.M.A., or until an adequate crossing facility is in place. The original committed schedule for the completion of E1Camino Real was January 1, 1986. The earliest feasible date for completion under the proposed scenario is April 1, 1986 dependent upon approvals of O.C.E.M.A. All discussions regarding the channel realignment and interim improvements have been based upon the formation of an Assessment District (No. 85-1) which would provide funding for the ultimate channel improvements as welt as other infrastructure improvements. The final formation of the Assessment District is currently underway and it is estimated to be in place and bond sale completed after the first of the year, about two months after the certification of the East Tustin Specific Plan EIR. In the event the certification of the East Tustin EIR is delayed, the funding vehicle for and construction of the ultimate E1 Modena-Irvine Channel improvements will also be delayed accordingly. This could extend the City's responsibility for maintenance on the interim channel improvements for an indefinite period of time. In the event Condition 19b of Planning Commission Resolutions No. 2207 and 2245 are amended, the following pertinent requirements should be completed prior to any- amendment: O.C.E.M.A. approval of alignment change, geometric configuration of channel, hydraulic design, construction drawings for ultimate undercrossings at Bryan Avenue and at E1 Camino Real, and issuance of construction permits for channel by-pass construction at Bryan Avenue. 2. City approval of interim earth channel improvements, which would not be included in Assessment District reimbursement. Execution of Agreement between The Irvine Company and City of Tustin for said interim channel improvements, wherein The Irvine Company would be responsible for all maintenance of said channel, liability resulting from said channel and all silt removal downstream of said channel which is determined to originate from said earth channel. 'Bbb Led-endecker Director of Public Works/City Engineer BL:jr ,_.Z il - !1 ::: ::: :::::::::::::::: .. ,,.,,.. ;,: ;,; ' · ::::::::::::::::::::::::::::: 'qI'IN3^ ¥ ONINAA O~d~