SUBJECT: AUTHORIZATION TO ADVERTISE FOR BIDS FOR EL CAMINO REAL EXTENSION FROM
TUSTIN AUIO CENTER TO MYFORD ROAD
RECOMMENDATION:
It is recommended that the City Council, at their meeting of March 3, 1986, adopt
the attached Resolution approving the plans and specifications for subject project
and directing the City Clerk to advertise for bids.
BACKGROUND:
This project encompasses the extension of E1Camino Real from the easterly line of
the Tustin Auto Center to Myford Road including the construction of a bridge over
the proposed relocated E1 Modena-Irvine FO7 Channel. Per previous agreements, the
constr~ction will consist of a two lane facility from the new bridge to Myford
Road. The bridge will be constructed to ultimate width to accommodate four travel
lanes.
The engineer's estimate for this project is $680,600.00. There is presently
$400,000.00 allocated in the F.Y. '85-'86 Budget for this work. The Irvine
Company share of this project for certain work within the existing FO7 Channel is
estimated at $139,000.00. Thus, the net City Share for this work is estimated at
$541,000.00 or $141,000.00 over the budgeted amount. Depending on bid results, it
may be necessary to allocate additional funds in the F.Y. '86-'87 Budget for this
project.
Tabulated below is the tentative schedule for this project:
City Council authorization tO advertise for bids ............... March 3, 1986
1st legal advertisement ........................................ March 13, 1986
2nd legal advertisement ........................................ March 20, 1986
Open bids ...................................................... March 27, 1986
City Council awards contract ................................... April 7, 1986
Begin construction ............................................. May 5, 1986
Complete construction ................................. ~ ........ September 8, 1986
bale A. Wick
Assistant City Engineer
DAW:jr
CC:
City Cler~
Finance Director
Street Maintenance Superintendent
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
23
2~
26
27
28
RESOLUTI.ON NO. 86-35
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR EL CAMINO
REAL EXTENSION FROM TUSTIN AUTO CENTER TO MYFORD ROAD AND
DIRECTING THE CITY CLERK TO ADVERTISE FOR BIDS.
WHEREAS, it is the intention of the City Council of the City of Tustin,
California to construct certain street improvements and appurtenant work
designated as E1 Camino Real extension from Tustin Auto Center to Myford Road,
and;
WHEREAS, the City Engineer has presented plans and specifications for
the construction of said work;
NOW THEREFORE, BE IT RESOLVED that the plans and specifications
presented by the City Engineer be and are hereby approved as the plans and
specifications for the extension of E1 Camino Real from Tustin Auto Center to
Myford Road.
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and
directed to advertise as required by law for the receipt of sealed bids or
proposals for the doing of the work specified in the aforesaid plans and
specifications which said advertisement shall be substantially in the
following words and figures to-wit:
"NOTICE TO CONTRACTORS"
SEALED PROPOSALS will be received at the office of the City Clerk,
Tustin City Hall, 300 Centennial Way, Tustin, California, until 10:00 A.M. on
the 27th day of March, 1986 , at which time they will be publicly opened and
reader performing ~ork as follows:
CONSTRUCTION OF EL CAMINO REAL EXTENSION FROM
TUSTIN AUTO CENTER TO MYFORD ROAD
Bids are required for the entire work described herein:
A-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
25
26
27
28
SCHEDULE OF WORK ITEMS
Item No. Unit Quantity
1. Lin. Ft. 1,400
2. Sq. Ft. 9,810
3. Cu. Yd. 4,820
4. Lin. Ft. 80
5. Lin. Ft. 45
6. Lin. Ft. 285
7. Lin. Ft. 42
8. Each 1
9. Cu. Yd. 135
10. Cu. Ydo 855
11. Ton 2,655
12. Ton 2,290
13. Ton 2,175
14. Ton 610
15. Lin. Ft. 97
16. Sq. Ft. 60
17. Lin. Ft. 215
18. Lump Sum 1
19. Lump Sum I
Description
Sawcut AC or PCC
Remove and dispose existing AC pavement
Roadway excavation
42" Dia. RCP - 1,500 D
48" Dia. RCP - 1,000 D
84" Dia. RCP - 850 D
21" Dia. CSP
33" Dia. CSP riser per OCEMA Std. #327
Rip-rap slope protection w/weepholes
Grouted rip-rap protection
Aggregate subbase
Aggregate base
Asphalt concrete base course
Rubberized asphalt concrete wearing course
AC berm curb
AC overside drain 0.25' thick
Metal beam guard rail per OCEMA Std. No.
403.
Signing and striping
Construct bridge
A-2
1
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
23
26
27
28
The foregoing quantities are approximate only, being given as a basis for
the'comparison of bids, and the City of Tustin does not, expressly or by
implication, agree that the actual amount of work will correspond therewith,
ibut reserves the right to increase or decrease the amount of any class or
portion of the work, or to omit portions of the work as may be deemed
necessary or advisable by the Engineer.
Plans, specifications and proposal forms to be used for bidding on this
project can only be obtained by prospective bidders at the office of the City
Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, 92680, upon
payment of $15.00 per set, which amount shall be non-refundable.
Plans and specifications will be mailed out upon payment of $25.00 per
set, which amount shall be non-refundable.
In conformance with Section 37931 of the Government Code, all bids shall
be presented under sealed cover on the proposal form provided and accompanied
by one of the following forms of bidder's security:
a. Cash
b. Cashier's check made payable to the City of Tustin.
c. Certified check made payable to the City of Tustin.
d. Bidder's bond executed by an accredited surety insurer, made payable
to the City of Tustin.
The security shall be in an amount equal to at least ten percent (10%)
of the amount of the bid. A bid shall not be considered unless one of the
forms of bidder's security is enclosed therewith.
A Security Bond for payment of labor and materials will be required in
the amount of fifty percent (50%) of the estimated total contract price and a
Faithful Performance Bond in the amount of one hundred percent (100%)
of the estimated total contract price in the form attached to the contract
documents. Said bonds shall be issued by a Surety Company rated Grade A or
better and Class IX or better by the latest edition of Best's Key Rating
Guide.
City of Tustin reserves the right to reject any or all bids, and/or
waive any informality on a bid. No bidder may withdraw his bid for a period
of thirty (30) days after the date set for the opening thereof.
The contract will be awarded to the lowest qualified bidder.
Provisions of the State Contract Act are not applicable, and prospective
bidders will not be required to be prequalified.
A-3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
23
24
25
26
27
28
All work to be done under the direct supervision of the City Engineer,
City of Tustin.
All work to be paid for at the unit prices bid from appropriated monies.
Pursuant to California Government Code Section 4590, the contractor will
be entitled to post approved securities with the City or an approved financial
institution in order to have the City release funds retained by the City to
insure performance of the contract.
The City Council of the City of Tustin has obtained from the Director of
Industrial Relations the general prevailing rate of per diem wages and the
general prevailing rate for legal holiday and overtime work in the locality in
which the work is to be performed for each craft or type of work needed and a
copy of the same is on file in the office of the City Clerk.
Not less than said prevailing rates shall be paid to workers employed on
this public works contract as required by Labor Code Sections 1771 and 1774 of
the State of California.
PASSED AND ADOPTED by the City Council of the City of Tustin, California,
this day of , 1986.
Mayor
ATTEST:
city Clerk
Advertise in the Tustin News:
March 13, 1986
March 20, 1986
A-4