COOPERATIVE AGREEMENT NO. 086-068
RECOMMENDED ACTION:
That the Tustin City Council, at their meeting of April 21, 1986, authorize the
Mayor to execute Agreement No. D86-068 on behalf of the City and authorize a
supplemental budget appropriation within the Water Enterprise Fund in the amount
of $8,100.00 to fund said work under this'Agreement.
BACKGROUND:
The County of Orange Environmental Management Agency will be awarding a third
contract for the "Resurfacing of Various Streets" within the unincorporated area
adjacent to the City of Tustin. The Tustin Water Service has various mainline
distribution facilities within the street rights-of-way where County road work
will be performed. These facilities are located within County streets under
franchise regulations, wherein the utility company/agency is responsible for any
work related to its own facilities.
In order to adjust the water valve boxes to the new street grades with the street
resurfacing contracts, the County has requested the City to enter into an
agreement which has provisions for the City to reimburse the County for said work.
The adjustment of the water valve boxes to finish street grade is required so that
full-time access is available to the City to the mainline gate valves in the event
a routine or emergency shutdown of the water lines is required.
In early March, 1986, the City Council approved two other Agreements in the amount
of $11,423.00 for similar work. The County has informed staff that this is the
final street resurfacing contract which would affect City Water facilities during
this current fiscal year.
DISCUSSION:
The attached Agreement pertains to forty six locations requiring water valve boxes
to be adjusted at an estimated cost of $8,096.00. The final cost of this work
will be computed on actual bid prices resulting from the County's competitive
bidding procedures for Public Works projects.
APRIL 14, 1986
PAGE TWO
The execution of this Agreement will require a supplemental budget appropriation
in the Water Enterprise Fund in the amount of $8,100.00.
Bob Ledendecker
Director of Public Works/City Engineer
BL:jr
Attachment
5
6
7
8
9
10
11
12
~3
14
15
16
17
18
19
2O
21
22
23
24
~5
26
27
28
AGREEMENT
THIS AGREEMENT entered into this
by and between
Agreement No. D86-068
day of 1986,
CITY OF TUSTIN
hereinafter referred to as OWNER.
COUNTY OF ORANGE,
hereinafter referred to as COUNTY
RECITALS
WMEREAS, COUNTY is preparing to contract for "Resurfacing Of Various Streets In
Orange County 1985-86 (Contract No. 3)," hereinafter referred to as PROJECT, which
consists primarily of resurfacing or reconstructing existing streets, some of which
lie within OWNER's service area; and
WHEREAS, OWNER maintains a water system, including valves, within the area of
COUNTY's PROJECT and PROJECT will require valve box adjustment to the new street grade;
and
WHEREAS, OWNER desires COUNTY to perform the adjustment of approximately 46
valve boxes (at an estimated cost of $176 each) as part of COUNTY'S PROJECT; and
WHEREAS, COUNTY is willing to include this valve box adjustment in its PROJECT at
· OWNER's cost.
NOW, THEREFORE, the parties hereto agree as follows:
1. OWNER shall deposit with COUNTY's Environmental Management Agency $8,096
as the estimated cost for said valve box adjustment. Said deposit shall be made within
30 days of receipt of this executed agreement.
2. OWNER, prior to co~nencement of said PROJECT, shall place a paint mark on the curb
opposite each valve box and indicate distance from curb face to center of valve box to
facilitate subsequent locating and adjusting valve boxes by COUNTY. COUNTY shall not be
held accountable for failure to adjust water valve boxes which are not marked.
//
6
7
8
9
10
11
12
~3
14
15
16
17
18
19
2O
21
22
23
24
~,5
26
27
28
Agreement No. D86-068
3. COUNTY shall include in PROJECT contract documents "Adjust Water Valve Box" as a bid
item and, through its contractor, shall adjust said sewer water valve boxes to grade in
accordance with PROJECT contract documents based upon the Standard Specifications for
Public Works Construction, 1982 edition.
4. OWNER shall pay the total cost fo~ adjusting said water valve boxes to grade. Said
total cost will be determined by multiplying the unit price by the total number of
valve boxes adjusted plus 10% for COUNTY inspection and administration. However, to
protect OWNER and COUNTY from unbalanced bids, regardless of the bid amount, OWNER
shall be responsible for a unit price not to exceed $160 but not less than $125. If
extra work is required, its cost will be added to said total cost, but extra work will
only be performed after prior approval by OWNER's engineer or manager.
5. COUNTY shall, upon completion of said PROJECT, prepare and submit to OWNER a
statement of the final cost authorized by this agreement, which statement will include
total number of valve boxes adjusted, unit price, 10% inspection and administration
amount, and extra work, if any.
If this final cost exceeds the deposit, Owner shall, within 30 days of receipt of
statement, pay COUNTY the difference; if the final cost is less than the deposit,
COUNTY shall, with the statement, refund the difference to OWNER.
//
//
//
//
//
//
//
//
//
//
1
2
3
4
5
Agreement No. D-86-068
6
7
8
9
10
11
-- 12
13
14
15
16
17
18
19
2O
21
22
23
24
~5
26
27
28
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
by their officers thereunto duly authorized on the date first written above.
CITY OF TUSTIN
MAYOR
CITY CLERK
COUNTY OF ORANGE
By.
Chairman of its Board of Supervisors
SIGNED AND CERTIFIED THAT A COPY
OF THIS DOCUMENT HAS BEEN DELIVERED
TO THE CHAIKMAN OF THE BOARD
Ltnda D. Roberts
Clerk of the Board of Supervisors
of Orange County, California
APPROVED AS TO FORM:
ADRIAN KUYPER, COUNTY COUNSEL
ORANGE COUNTY, CALIFORNIA
Deputy