Loading...
HomeMy WebLinkAboutRPT 3 UNDGRND UTIL'S 05-05-86DATE: APl{IL 28, 1986 REPORTS NO, 3 5-5-86 Inter- Corn TO: FROM: SUBJECT: WILLIA~ HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION #AIN Sll~EET UNDERGROUNI)II~ OF UTILITIES AND STREET LIGKFING INSTN_I. ATION RECOMMENDATION: For the City Council meeting of May 5, 1986. Pleasure of the City Council. BACKGROUND: The City Council, at their meeting of April 21, 1986., requested staff study the feasibility and cost of undergrounding the overhead utilities and the installation of new street lighting along West Main Street. Staff has completed a very preliminary study of that portion of Main Street lying between "C" Street and Pasadena Avenue (extended) for the undergrounding of Edison Company electrical facilities, Pacific Bell telephone facilities and Communicom cabletelevisien facilities. DISCUSSION: The area being considered for undergrounding along Main Street currently has marbelite street light standards with underground feed in place at the following locations: South side of Main Street between "C" Street and "B" Street. ° South side of Main Street adjacent to the Tustin Greens condominium development {640-6g0 Main Street). The two Pacific Street intersections at Main Street will have safety lighting installed as a part of the planned traffic signal project. There are a total of nine (9) existing street lights on wood poles which would be credited against any proposed underground district. This results in an additional estimated requirement of six street lights. A preliminary cost-figure for the undergrounding of utilities ranges' from $110 to $150 per lineal feet. The low range will be utilized in this case due to the potential for cost savings with the upcoming street reconstruction project on Main Street between "C" Street and Pacific Street. APRIL 28, 1986 PAGE TWO A cost estimate for this undergrounding project is as follows: 2,350+ feet of conduit, structure and cable at at~llO.OO/L.F. - ................................... $258,500 Six additional street lights at $500/each ............ , 3,,000 TOTAL ESTIMATED COST ................... $261,500 In addition to the above cost, each residence along Main Street within the proposed district will be required to convert their overhead services tO underground if they are currently served by an overhead facility within Main Street. The private property conversions could range from $1,200 to $2,500 per parcel depending upon the complexity of required work. Staff has not had the opportunity to establish an exact list of properties requiring conversion. This will be done at a later date if the Council desires to proceed with the project. It is proposed that any undergrounding along.Main Street would be done with Edison Co.any Rule 20A allocations. The City currently has a balance of $335,912 as of January, 1986. This balance will be depleted with a planned project identified as Newport Avenue Underground Utility District No. 7. The final cost of this prqject has not yet been determined, but it is estimated to be in excess of $300,000. It appears that it will take between two and three years for the City to accummulate adequate Rule 20A funding to complete this project. Director of Public Works/City Engineer BL:jr PACIFIC ~ ST. PAc,,,c ST ~ ~ .T. v,[~, '~-;~ ~[ - c_ . ' ST -- ~0. C S.~ $$.$- 5'//.0 CALl,; ST