HomeMy WebLinkAboutPH 1 USE PERMIT 85-9 06-17-85 '~;~ ~ PUBLIC HEARING
Inter- Corn
Ju~e 17, 1985
TO:
FROM:
S U BJ ECT:
HONORABLE MAYOR AND CITY COUNCIL
CO~UNI'iT OEVELOPf~ENT DEPARTMENT
APPEAL OF USE PERMIT 85-9
TUSTIN PLAZA
APPLICANT:
LOCATION:
REQUEST:
CARVER OEYELOPt4ENT
PROPERTIES FRONTING ALONG THE WESTERLY SIDE OF NEWPORT AVENUE
BETHEEN EL CJ~4INO REAL AND HAIN SIREU
AUTHORIZATION TO CONSTRUCT A COI~UNITY SHOPPING CENTER AND T~O
FREESTANDING OFFICE BUILDINGS.
BACKGROUND:
The City Council at its meeting on May 20, 1985 appealed Use Permit 85-9, a
proposal be Carver Development to construct a community level shopping center
with two freestanding office buildings. The Planning Commission previously
approved Use Permit 85-9 with conditions on May 13, 1985.
DISCUSSION:
The "Tustin Plaza" shopping center site was previously approved for development
of the "Tustin Town Center" a commercial office complex proposed by California
Pacific Properties of Costa Mesa. The Planning Commission and City Council
authorized three extensions to Cal Pacific's Use Permit whereupon the final
extension expired and the property is now being offered to Carver Development.
Carver Development has. discarded the concept of a mid-rise office complex in
favor of a community level shopping center totalling approximately 91,000 square
feet of retail and service tenant space. The shopping center portion of the
project is located on 7.8 acres bounded by Main Street and Newport Avenue across
from the civic center. The second parcel included is the vacant land totalling
2.8 acres fronting along Newport Avenue between 6th Street and E1 Camino Real.
Two office buildings are proposed for this site totalling approximately 46,000
square feet in area each I~o stories in height.
The site plan and elevations for all proposed buildings have been extensively
discussed and analyzed by both staff and the Planning Commission. While the
Planning Commission approved the project, conditions included the requirement
for all final building elevations to be approved by the Planning Commission.
This condition was specifically imposed responding to both community and
Commission concerns regarding office building architecture.
City Council Report
Carver Development
page two
Pursuant to Commission direction, Carver Development has reconsidered its
architectural plan and submitted revisions to the shopping center which improve
and provide greater detail. However, since the office buildings were less
favorably accepted, Carver has submitted completely revised architectural
concepts as alternatives for Council consideration.
At this time the attached "A" plans are those approved by the Planning
Commission and appealed by City Council. The attached "B" plans are the
alternatives submitted for Council consideration. The Council has the authority
to either ratify the Commission's action, except the modifications as now
submitted, or revise any of the project plans as necessary.
Attachments to this transmittal include copies of staff's original report to the
Planning Commission and the latest revised plans and color renderings.
RECOI~ENDATION:
Pleasure of the City Council.
Director of community Development
DDL:do
attachments: Planning Commission staff report, May 13th
Original plans "A"
Revised plans "B"
Community Development Department
Repor the
Planning Commission
DATE:
SUBJECT:
APPLICANT:
LOCATION:
ZONING:
ENVIRONMENTAL
STATUS:
REQUEST:
MAY 13, 1985
USE PERMIT 85-9
CARVER DEVELOPMENT
17 CORPORATE PU~ZA DRIVE
NEWPORT BEACH, CA. 92660
THE VACANT PROPERTIES FRONTING ON THE WESTERLY SIDE OF NEWPORT
AVENUE BETWEEN MAIN STREET AND EL CAMINO REAL
PLANNED COMMUNITY COMMERCIAL
A NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT HAS BEEN APPLIED
FOR IN COHPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
TO AUTHORIZE THE CONSTRUCTION OF A + 91,000 SQUARE FOOT RE'FAIL
SHOPPING CENTER AND THE CONSTRUCTION--OF + 46,000 SQUARE FEET OF
OFFICE SPACE ON THE SUBJECT PROPERTIES.
BACKGROUND
Following several hearings before the Planning Agency in late 198l, Use Permit
No. 81-29 was approved for the vacant properties located on the westerly side of
Newport Avenue, between Main Street and E1 Camino Real. The approved project,
complete with an environmental impact report, consisted of 390,000 square feet
of mixed commercial uses. Approximately 300,000 square feet was dedicated to
professional office uses to be located in structures ranging from two (2) to six
(6) stories in height. The remainder of the available square footage was
reserved for restaurant and retail uses, along with a 15,000 square foot movie
theater.
During the public hearings, the majority of concern expressed by persons in
attendance related to traffic impacts, and to the height of the then proposed
structures. Based on information presented in EIR 81-2, 9,300 average daily
trips {ADTS) could be expected to be generated from a 390,000 square foot mixed
use complex. Although final elevations were not ever formally approved by the
Planning and Development Agencies, a condition of approval contained in
Resolution No. 2004 required' that a maximum height limit of 75 feet be
established for the site. Neither the traffic generated nor the land use issues
presented significant adverse impacts to the environment according to EIR 81-2.
FILE COPY
Cnm m~Jnitv l-)¢v~loom(~rl! DePartment
Planning Con~nission Report
May 13, 1985
page two
PROPOSEO PROdECT {USE PERlCIT NO. 8S-9):
The project currently before the Commission is a considerably different project
from that previously approved. The square footage of office area has been
reduced, from 307,000 square feet to slightly over 46,000. Conversely, the
retail and restaurant' area has been expanded from approximately 50,000 square
feet to over 90,000 square feet. The retail portion of the project will be
constructed upon the triangular shaped property bounded by Main Street, Newport
Avenue, and Sixth Street and consists 'of essentially a strip commercial concept
with two additional free-standing structures.
The office portion of the project is to be constructed on the parcel bounded by
6th Street, Newport Avenue, and E1 Camino Real, and consists of two, two-story
buildings totalling approximately 46,000 square feet.
DISCUSSION ANO PRO,]ECT ANALYSIS:
There are several areas of discussion that must be addressed with a project of
this size. For purposes of clarity each issue will be reviewed separately.
Environmental:
Pursuant to.Section 15153 (c) of the California Environmental Quality Act, an
Environmental Impact Report (EIR 81-2) prepared for an earlier project may be
used as a portion of an initial study prepared for a subsequent project. In
this particular instance, EIR 81-2 certified in conjunction with a 390,000
square foot mixed use project, identified potential impacts on the environment.
Specific focus on traffic and land use impacts was' stressed. In terms of
traffic, EIR 81-2 noted that the previously approved project would generate
9,300 average daily trips (ADTS), but that when considering existing and
projected service levels, this increased traffic volume would not create an
adverse impact on the environment. Subsequently, using the same formula
utilized in EIR 81-2, the initial study prepared for this project indicates the
estimated ADT figures are less than half of the counts for the Cai-Pacific
Project. Specifically, the trip generation figures for the subject project are
as follows:
(Bldgs 2 & 3)
78,371 square feet
12,647 square feet
Retail Floor Area 3189
Restaurant Floor Area 712
Office 568
Total ~
These figures are based on estimated square footage breakdown between retail and
and restaurant uses and are subject to change. However, the modifications in
square footage would not create a significant difference in ADTS. The figure
for the office space is, however, based upon the actual square footage
requested.
Corn munity Dcvelopmen~ Department
fPlannlng Commission Report
May 13, [985
page three
Utilizing the findings contained in EIR 81-2, the initial study for the Carver
Project concludes that a center generating less than 4,500 ADTS will likewise
not adversely impact the area.
In relation to land use impacts, both EIR 81-2 and the"current initial study
identify the land uses proposed as compatible with each other, as well as, the
surrounding community. The uses proposed will therefore not create adverse
impacts to the area.
So then, with the information referenced in EIR 81-2 within the context of the
initial study, a negative declaration of environmental impact has been applied
for in compliance with the California Environmental Quality Act.
Development Standards and Site Plan Review:
Pursuant to the Planned Community District Regulations which govern the
development on these particular properties, prior to construction of any project
a Development Plan must be approved. To meet the requirements of the Municipal
Code, the project as submitted shall constitute the development plan.
Since the site plan constitutes a portion of the development plan for the
properties, it is essential that the review of all .aspects of the design be
given special emphasis. The basic site lay-out for the triangular lot is
generally acceptable, and parking has been provided at a more than adequate
ratio. However, there are some minor alterations that wilt be necessary prior
to issuance of buflding permits. These alterations include: placement of block
walls; location and size of bike trail along Newport Avenue; adjustment of some
parking stalls to accommodate proper and safe traffic movements; and, the
possible relocation of the easterly drive-way serving. Main Street. Also, the
use of stamped concrete will not be permitted. Interlocking pavers are to be
used for the entry design feature. Similar modifications are necessary on the
parcel designated for the office buildings. Two modifications in particular are
needed. One, a 30 foot wide easement dedicated to the City shall be required at
the point where the drive-way curb cut meets Newport Avenue, continuing to the
northerly property line. This will provide a mechanism by which future
development to the north will have access to and desired exposure from Newport
Avenue. Second, the notation on the site plan stating, "Owner reserves the
right to close off parking entry" shall be removed. In working with the
applicant, it was this Department's intent to allow mutual access movements and
parking accommodations.
Finally, landscape treatment along the Newport frontage needs to be enhanced. A
three foot planter is completely inadequate and staff recommends a minimum of
10 feet be required. This will necessitate removal or relocation of parking
stalls along Newport. However, the 1:200 mixed use parking ratio can be reduced
and still provide adequate parking. Once the modifications or corrections noted
have been incorporated into the site plan, the final version will be returned to
the Commission for review.
Community Development Department
Planning Commission Report
May 13, 1985
page four
Land Use Issues:
As indicated in the section of this report related to environmental issues, the.
proposed land uses of retail shops, restaurants, and professional offices within
this project have been determined to be compatible with the surrounding area.
The g0,000 square feet committed to retail (sales tax generating uses,)
addresses recent concerns expressed by the City Council. Along these lines, the
developer has committed highly visible buildings (2 and 3) for restaurants.
Finance related businesses (i.e., Banks, Savings & Loans) or a multi-tenant
facility similar to the newly constructed building in E1 Camino Plaza will not
be permitted in either of the buildings as a requirement of the approved
development plan.
As a condition of approval the development plan shall include the retail uses on
the triangular site shall be required to comprise at least 75 percent of
leasable floor area. Since this project is considered as a singular development
(even though the two parcels can stand independently), this requirement meets
the intent of basic commercial zone standards requiring that at least 50 percent
of the total floor area of a project be designated for retail use. Tied in with
this concept, and to ensure that this intent is met, it will .be recommended that
building permits for the office structures shall not be issued until permits'for
the retail structure have been issued. This condition is to include issuance of
permits for the free standing structures numbered 1 and 2 on the site plan,
prior to the office structure.
Finally, with a parking ratio of 1:250 provided for the office structures, the
development plan for the project shall include the provision that retail users,
particularly office support users, will be authorized for the ground floors of
the office complex.
ARCHITECTURAL CHARACTERISTICS OF THE PRO~IECT:
The basic design theme of the retail portion of the project (Bldgs 3-10) is
contemporary, using terracotta colored pitched roof, an off-white plaster
fascia, and a contrasting feature color above the store front area. The
store-front is situated under covered prominade and highlighted with plaster
columns. Precise colors and materials will be presented at the Commission
meeting. For the free standing structure (Bldgs 1 and 2), the applicant wishes
to retain maximum flexibility to attract corporate or franchise tenants and
therefore, the exact architecture has not been completely formalized. To allow
this flexibility a condition of approval shall be that final elevations of
Buildings 1 and 2 will require Planning Commission review and approval.
The major concern of staff in relation to the architecture is with the Main
Street elevations. With the rear of the rental space oriented towards Main and
the requirement of the Uniform Building Code that a rear exit be included,
Community Development Department
Plannlng Commission Report
May 13, 1985
page five
the project architect is faced with a difficult task of providing aesthetically
acceptable elevations, providing the required door. The proposed solution to
these conflicting needs is to utilize a combination of a screen wall and a
landscape berm as indicated on Exhibit "B". The exterior portion of the wall
which will be visible from the street shall be treated with the same color and
materials utilized on the building. From the street, this treatment will give
the impression that the landscaping abuts the structure. Although perhaps not
the optimal design from an aesthetic standpoint, this concept addresses the
concerns. Staff, however, wishes to continue to work with the applicant on
final elevation plans. This continued effort should not preclude the Commission
from making a decision on the project. If changes to the design are
implemented, all modifications would be referred for Commission approval.
The two office buildings to be constructed are matching two story structures
using a plaster and glass design. The major primary color utilized will be an
off-white {matching the retail center) and will be accented by color bands along
the top of the parapet and bordering window areas. The glass will be treated
with a black anodized glaze. The flat roof shall be designed to screen, all
roof-top equipment from view.
As an entry point into the E1 Camino Real downtown area, this portion of the
project is a focal point and of particular concern.. Being contemporary in
nature, the structures are a slight departure from the desired down-town theme.
Therefore, staff would like to continue to work with the applicant to develop a
more acceptable architectural appearance.
COMCLUSIOMS:
From environmental and land use standpoints, the project requested in Use Permit
Application and conceptually is an appropriate project for the properties.
However, the complexity of the project necessitates further refinement to
achieve the highest quality attainable. With the attached conditions of
approval, staff is comfortable with a positive recommendation for the basic
project.
· Community Development Deparlment
Planning Commission Report
May 13, 1985
page six
RECOI~IENDED ACTION:
It is recommended that Use Permit Application No. 85-9 authorizing 91,018 square
feet of retail space on the parcel of land bounded by Main Street, Newport
Avenue, and 6th Street and authorizing 46,232 square feet of office space on the
property bounded by 6th Street be approved subject to the. conditions contained
in Exhibit "A" attached.
Associate Planner
Attachments:
Exhibit "A"
Reduced Elevations
Exhibit "B"
Full Size Elevations
Community Development Department
e
Conditions of Approval
Carver Development
Use Permit Application 85-9
All final elevations shall be subject to review and approval of' the
Director of Community Development. Elevations of buildings numbered 1 and
2 on the approved site plan must be reviewed and approved by the Planning
Commission. However, in any event, all roof top equipment must be screened
from view by parapet walls.
All final details of corner plaza designs are subject to review and
approval of the Director of Community Development.
Along the westerly property lines of the project a 6'8" high, 6" wide block
wall shall be constructed. An opening in said wall shall be created for
pedestrian access from the senior citizen housing project located at 275
6th Street onto the retail portion of the project. Further, the applicant
shall grant to adjoining property owners the right to remove the wall at
such time their properties are redeveloped. This removal shall be subject
to approval by the Community Development Director. The expense of the wall
removal shall be borne by the adjoining property owner.
An agreement shall be executed and submitted to the City stating that the
owner of this project shall maintain all landscaping located within the
public'right-of-way and along the bike trail.
The landscape area along Newport Avenue shall be at least 10 feet in width.
The developer shall provide a 30 foot wide easement at the Newport Avenue
ingress/egress point to the office project, continuing from the front
property line to the rear property line. The easement shall be granted in
favor of the city and assignable to adjoining property owners providing
access rights to Newport Avenue.
The notation on. the site plan for the office project stating "Owner
reserves the right to close off parking entry" shall be deleted , and
mutual access and parking rights maintained.
The final site plan shall be standardized and reflect all appropriate City
standard drawing numbers. The developer shall construct all missing or
damaged street improvements to said developmenmt per the City of Tustin
"Minimum Design Standards of Public Works" and "Street Improvement
Standards". This work shall consist' of, but not limited to: curbs and
gutters, sidewalks, drive apron, street pavement, street trees and
marbvelite street lights with underground conduit.
Continuous 6" concrete curbs shall be provided along landscape planters
adjacent to parking spaces and drive aisles.
Community Development Department
Exhibit "A"
Variance 85-9
Page two
10. An irrigation plan shall be submitted to the ~Community Development
Department for review and approval 'prior to installation of any irrigation
system. Said plan shall include location and description of the following:
point of connection;
back flow prevention device(s);
location and types of valves
location and sizes of piping;
sprinkler head types, locations and manufacturer model;
automatic sprinkler controller location and specifications.
A grading plan based on the Orange County Surveyor's bench mark datum
should be submitted for rev.iew and approval.
12. The size and location of the water service and sanitary sewer lateral shall
be shown on final site plan.
13. The proposed decorative pavement at all the driveway entrances and street
intersections should be designated. Embossed or stamped concrete types are
not acceptable within the areas of public right-of-way. Interlocking
pavers constructed to city standards be utilized.
14. The bike trail/path along Newport Avenue shall be minimum width of 10.0
feet, as is the current trail and .that one located northerly of Main
Street. The bike trail/path must be built to city standards with
appropriate signing, striping and pavement markings. There shall be no
right angle offsets within the bike trail as shown on attached plan. Any
landscaping along the bike trail must be maintained so as not to exceed 30
inches in height from sidewalk level.
15. The bollards, as placed along Newport Avenue, could be a hazard for the
bicyclist. Therefore bollards must be. relocated.
16. Whenever a five foot wide sidewalk is utilized adjacent to the curb, all'
street lights, signs, fire hydrants and other above ground utilities must
be located behind the sidewalk area.
17. All on-site trees must'be located so as not to interfere with the proposed
street light system.
18.
Public improvements will be required along the Main Street, Newport Avenue
and 6th Street frontages and will include but not be limited to the
following:
Street paving
Curb and gutter
Sidewalks
Bike trail, paving, signing and striping
Traffic signal installation (50%) at 6th/Newport
Community Development Department
Exhibit "A"
Variance 85-9
Page three
g.
h.
i.
j.
k.
Driveway construction
Marbelite street lights with underground ~Jnduit
Domestic and fire service systems
Connection of all structures to sanitary sewer system
Street trees as required
Storm drain extensions as required
19. Dedication of all required right-of-way for Main Street widening, Newport
Avenue widening and the Newport Avenue bike trail.
20. Enlargement of curb return radius at Newport/Main at southwesterly corner
is required.
21. Payment of following fees is required at the time the initial building
permit is issued:
80
County Sanitation District No. 7 sewer connection fee .based upon
$50.00/1,000 square feet of building area and any front footage
fee for connection to a County Sanitation District sewer (if
required).
East Orange C~unty Water District fee. Contact E~rl Rowenhorst
Of Tustin Water Service for fee amounts.
22.
Prior to approval of the subject project, the developer shall enter into an
agreement with the City of Tustin for participation in a fee program (if
adopted by the Tustin City Council) for implementation of the
Eastern/Foothill Transportation Corridor. Said agreement shall provide
that:
The fee shall not exceed that amount as established by the nine.
participating agencies within the Area of Benefit.
Subdivider's obligation to' pay fee would only commence after the
city establishes a fee program but not prior to issuance of
building permits.
Subdivider~s obligation to pay fee would cease if the fee program
were not established within three years of the issuance of
building permits.
Subdivider shall furnish surety bond or money to assure payment
of said fees.
23.
The area of land northerly of Sixth Street is comprised of three parcels
per the assessor's office maps and the-area southerly of Sixth Street is
comprised of two parcels.
Either a Covenant and Agreement to hold all parcels of land as one must be
filed or a Parcel Map should be filed on each area .northerly and southerly
o? Sixth Street.
Comrnunl~/ D~celopment Depamment
Exhibit "A"
Variance 85-2
Page four
24. All utilities serving the subject property shall be required to be
underground.
25. The final appeoved site plan, square footages, and public improvements are
hereby incorporated into the Development Plan for the subject property.
The final Resolution of Approval for Use Permit 85-9 shall adopt said plan
and shall include the following guidelines:
All land uses located within the project shall comply with the
permitted uses established in Section 9235 et seq. of the Tustin
City Code.
One hundred percent (100%) of the square footage within buildings
11 and 12 shown on the approved site plan may be occupied by
office uses. However, the first floor may also be utilized by
retail users.
Buildings 4 through 10 on the approved site plan are to be
occupied by retail commercial businesses only. Buildings 2 and 3
shall be limited to single-tenant restaurant uses. Building 1 is
strongly encouraged to be a single tenant.
A minimum of 75% of leaseable area in the retail portion of the
project shall be required to be occupied by retail users.
e®
A master sign plan shall be submitted for review and approval of
the Planning Commission.
Community Development Department
SHOPS
NI.I.SI*IJ.
J.Ng~dO'lgA3Cl ~
YZY"Id NIJ.~i'I.J.
· ,El
NIYfl · ~IOdM3N
YZ~'I¢I.-NIJ.$I'LI.
YZY"Id NI.LSt'I.L