Loading...
HomeMy WebLinkAboutCC 8 FINAL P.M. 84-1032 6-17-85 Inter Corn DATE JUNE 10, 1985 ~ TO: FROM: SUBJECT: HONORABLE HRYOR AND CITY COUNCIL CO~4UNITY DEVELOPMENT DEPARTNENT FINAL PARCEL HAP 84-1032 APPLICANT: LOCATION: THE IRYINE COMPANY AN AREA BOUNDED BY THE I-5 FREEWAY, PROPOSED JAHBOREE ROAD, PROPOSED LAGUNA ROAD AND A LINE 192 FEET NEST OF THE El. HODENA CHANNEL ZONING: PLANNED COI~UNITY COMMERCIAL ENVIRONMENTAL STATUS: AN ENVIRONMENTAL IMPACT REPORT HAS BEEN CERTIFIED TO COMPLY WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ALT (EIR 84-2) BACKGROUND AND DISCUSSION: The proposed final map of 55.94 acres consists of 12 numbered parcels for the auto dealerships and four lettered parcels for public utilities and landscape maintenance districts. The tentative map was approved by the Planning Commission on January 14, 1985 and by the City Council on January 21, 1985. All conditions of approval as listed in Exhibit "A" have been met. On June 10, 1985 the Planning Commission recommended approval of this final map by the adoption of Resolution No. 2245. The final map is in substantial compliance with the tentative map. RECOP~ENDED ACTION: Approve Final Parcel Map 84-[032 by the adoption of Resolution No. 95-57. MARY ANN CHAMBERLAIN, Associate Planner MAC:do attach: Tentative Map Final Map Exhibit A, Conditions of Approval Resolution 85-57 PJ~RGTL MAP NO. 84-10~2 $*IGNkTURE OFtIOOIONS NOTE PIItCEL MAP N,Q. 84-10:52 NOTIr BOUNDARY I~ INDEX: HAP PAR~iL MAP N-O. 84.-10:.'52 P&i~C~t. 8 PARCEL MAP NO. 84'1032 PARCEL6 BLOCK 44 PARCel ? EXHIBIT "A" CONDITIONS OF APPROVAl FOR TENTATIVE PARCEL MAP 84-1032 The following are conditions of approval for Tentative Parcel Map No. 84-1032 as incorporated into Resolution No. 85-11 of the City Council of the City of Tustin: e Preparation and submittal of a final grading plan delineating the following information: Co de Final street elevations at key locations. Final pad elevations, one foot above the base flood elevation of 81.0 as defined by F.E.M.A., and interim grading swales. Location and elevations of all flood protection berms related to Parcel Map 84-1032. All flood hazard areas of record. Preparation of a sedimentation and erosion control plan for all on-site and off-site construction work related to Parcel Map No. 84-1032. Provision for maintenance and ownership of the flood protection berms, and associated landscaping to be the responsibility of' the "Property .Owners Association" and enforced by CC&E's, and/or the City of Tustin, with said determination to be made prior to recording the parcel map. 4. Provision for irrevocable easements for the required term of all flood protection berms in favor of the "Property Owners Association", and/or the City of Tustin, with said determination to be made prior to recording the parcel map. 5. Landscape maintenance of areas within the public right-of-way between the backedge of sidewalks and the property lines to be the responsibility of the "Property Owners Association", if not included within a Lighting/Landscape Maintenance Assessment District. Annexation of land within this development and related off-site access areas into an appropriate street lighting district to provide for ongoing maintenance and energy costs of said system. Community Development Department Exhibit "A" page two Preparation of plans for and construction of full public improvements for all streets wtthtn the boundaries of safd parcel map. Additionally, Laguna Road between Jamboree Road and Browning Avenue and the intersection of Jamboree Road at Bryan Avenue inclusive of wtdening along Bryan Avenue 'co accommodate protected left turn movements to Jamboree Road shall be fully Improved. These Improvements shall tnclude all Improvements as designated by the City Engtneer and may include but not be limited 'co the following: aD Curb and gutter/cross gutters Sidewalk Drive aprons Street paving Street signing and striping Landscaping/facilities with proper irrigation (including median islands) Sanitary sewer service facilities Domestic water service facilities Gas, electric, telephone and cable television facilities Traffic signal facilities Street light standards all 8. Placement of all above ground facilities such as signing, street lights and fire hydrants behind the sidewalk, on all streets on-site and off-site, when said sidewalks are constructed adjacent to the curb and less than minimum city standard widths. g. Dedication of all required right-of-way for Laguna Road between Browning Avenue and Jamboree Road and Bryan Avenue at the intersection of Jamboree Road and Laguna Road between the east auto center boundary and Myford Road. [0. Execution of an irrevocable offer of dedication of all required right-of-way adjacent to said map for the construction of the future Jamboree Road interchange, subject to approval of Caltrans for interchange construction. 1[. Preparation of plans and construction of all sewer facilities as required by the City Engineer.. These facilities shall include a gravity flow system per standards of the Irvine Ranch Water District, primary lift station and standby facilities with alternate emergency power source construct 1.0 feet above the flood hazard elevation of 8[.0 and a force main connected to Orange County Sanitation District No. 7 facilities located in the vicinity of Browning Avenue and Laguna Road or to I.R.W.D. facilities at Walnut Avenue and Jamboree Road. Dedication of easements for all off-site sewer facilities located outside of public rights-of-way. 12. Preparation of a hydrology and hydraulic study of the tributary area in, acting the proposed development. Preparation of plans and construction of all storm drain facilities as required by the City Engineer. These Community Development Department Exhibit "A" page three facilities shall include a gravity flow system per city standards, primary lift station and standby facilities with alternate emergency power source constructed 1.0 feet above the flood hazard elevation of 81.0 and a source main to the existing E1Modena-Irvine Drainage Channel. DedicationI of easements for all off-site drainage facilities located outside of public rights-of-way. Preparation of plans and construction of domestic water system to the standards as set forth by the 1tv, ne Ranch Water District and to the satisfaction of the City Engineer. Provision for a secondary feed source to the developments system for fire protection reasons and uninterrupted supply. Dedication of easements for all off-site water facilities outside of public rights-of-way. 14. Cash/surety deposit if deemed necessary by City engineer for the reconstruction of Jamboree Road and Laguna Road at locations adjacent to temporary flood protection berming to return roadway interim profiles to long term grades when berms are no longer required for flood protection purposes. 15. Cash/surety deposit in an amount determined by the City Engineer for traffic signal installations at the following intersections as follows: 16. 17. 18. 19. Laguna/Jamboree Rd. - 75% of cost Bryan Ave./Jamboree Rd. - 33% of cost Dedication of vehicular access rights to Jamboree Road and Laguna Road adjacent to Parcels 1, 2, 3, 4, and 9. Reservation of adequate right-of-way for future Santa Aha Freeway widening, Jamboree Road interchange, and Eastern Corridor connector/transition roads. Payment of all required Orange County Sanitation District No. 7 sewer connection fees that may be required as a result of the interim connection to the District 7 facilities at the time the initial building permit is issued. Modifications to improve flood control capabilities of the E1Modena/Irvine Flood Control Channel consisting of: removal of the bridge structure located at 2121-2125 Bryan Avenue, and the reconstruction of the box culvert at the Bryan Avenue undercrossing easterly of Browning Avenue to the satisfaction of the City engineer. Community Development Department Exhibit "A" page four 20. Said modifications shall be commenced prior to or concurrently with the issuance of building permits for any structures in the project area with completion on or prior to October 15, 1985. A hydrology study of the project area shall be prepared and submitted to the City Engineer for review and approval prior to the issuance of any grading permits for the project. Community Development Department 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 85-57 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, APPROVAL OF FINAL PARCEL MAP 84-1032 LOCATED IN AN AREA BOUNDED BY THE I-5 PROPOSED JAMBOREE ROAD, PROPOSED LAGUNA ROAD AND A LINE 192 FEET WEST OF THE EL MODENA CHANNEL FREEWAY, The City Council of the City of Tustln does hereby resolve as follows: 1. The City Council finds and determines as follows: That Final Parcel Map No.- 84-1032 was submitted to the City Council pursuant to Ordinance No. 847 by The Irvine Company for the purpose of creating 16 lots from a portion' of Lots 22, 23, 26 and 27 of Block 44 of Irvine's Subdivision per a map filed in Book 1, Page 88 of Miscellaneous record maps, Orange County., California. B. That said map is in conformance with the Tustin Area General -plan. C. An Environmental Impact Report (84-2) has been certified to comply with the California Environmental Quality Act. D. That the final map is in substantial compliance with the tentative map. II. The City Council hereby approves Final Parcel Map No. 84-1032 subject to the final approval of the City Engineer. PASSED AND ADOPTED at a regular meeting of the Tustin City Council, held on the day of , 198 Attest: FRANK H. GREINKE Mayor Mary E. Wynn, City Clerk