HomeMy WebLinkAboutRDA CITY HALL MOD. 06-17-85DATE: June 17, 1985 REDEVELOPMENT AGENCY Inter- Corn TO: FROM: SU BJ ECT: HONORABLE CHAIPJ~AN AND HEHBERS OF THE REDEVELOPHENT AGENCY CONMNITY DEVELOPNENT DEPARTHENT AWAND OF CONTRACT FOR CITY HALL NODIFICATIONS RECOI~IENDATION: That the Tustln Redevelopment Agency at their meeting of June 17, 1985 award the bid to Frank Ultimo Construction in the amount of $80,652 for building modifications to the City Hall facility. BACKGROUND: In May, the Tustin Redevelopment Agency authorized staff to proceed with a bid to modify the City Hall facility and parking lot lighting. The preliminary cost estimate for the City Hall modifications was $65,000, while the engineer's estimate for the lighting work totaled $35,000. Although five contractors purchased a copy of the bid package for the City Hall modifications, only one contractor returned the bid to the City. The apparent lack of interest in the project could be attributed to the current high level of construction in the County, the small size of the project, and the specific nature of a small remodeling job in a municipal building. The contractor that returned the bid was Frank Ultimo Construction, with an estimated construction cost of $80,652. The breakdown by item for the bid includes: $68,622 for modifications to the City Hall facility in accordance with plans and specificatios; $400 for removal of landscaping and sprinklers and reconstruction of sprinkler system; $11,630 for selection and installation of selected item, such as carpeting, wall coverings, cabinets and plumbing fixtures, and louvered sliding doors. The price estimate is approximately $15,652 over the estimated cost of $65,000. While this project was over the estimated amount, the low bid for the modification to the parking lot fixtures was $19,910, a total of $15,090 below the engineer's estimate. When the two projects are considered together, the difference is only $562, or .56% higher than the estimated cots. Since the City received only one bid, staff has asked for references from Frank Ultimo Construction. This firm is currently performing work for Tustin Water, and the Engineering Deprtment is satisfied with their work product. Additionally, employees with the County that have administered contracts with Ultimo Construction reported excellent results and good work product. City Counctl Report City Hall Modifications page two If the Redevelopment Agency is concerned with the turnout of only one bid, the project can be readverttsed. This process will take approximately three months to reach this stage, with no guarantee that additional contractors will bid the project. Staff would recommend that Frank Ultimo Construction is a responsible bidder, and that the Redevelopment Agency accept his bid and award the contract. SeniOr Planner EK:do , ,, Community Development Department