Loading...
HomeMy WebLinkAboutCC 6 RELEASE OF BONDS 07-01-85A r~ ~ ~k I J'~ A ~ CONSENT CALENDAR j NO. 6 DATE: JUNE 19, 1985 TO: FROM: SU BJ ECT: WILLIAM HUSTON, CITY MANAGER BOB LEDENDECKER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER ACCEPTANCE OF PUBLIC IMPROVEMENTS AND RELEASE OF BONDS - TRACT NO. 12018 RECOMMENDATION: That the Tustin City Council, at their meeting of July 1, 1985, accept the public improvements within Tract No. 12018 and authorize the release of all pertinent bonds as indicated below. BACKGROUND: Tract No. 12018 is a condominium development located at the southeasterly corner of Holt Ave. and Warren Ave. and was developed by Pierco Development, Inc. The public improvements consist primarily of curb and gutter, sidewalks, street lights and street trees along both the Holt Ave. and Warren Ave. frontages, and a storm drain connection to the flood control channel.- DISCUSSION: All public improvements related to Tract No. 12018 have been co~leted to the satisfaction of the Public Works Department and are ready for acceptance by the City. The developer has requested release of the following bonds: Faithful Performance Bond No. 7126492 .......................... $43,000.00 Labor and Materials Bond No. 71264925 .......................... $21,500.00 Monumentation Bond No. 7126494 ................................. $ 1,100.00 The Subdivision Warranty Bo6d No. 7126493 in the amount of $4,300.00 must remain in effect for a period of one-year after the public improvements have been accepted by the City. Bob Ledendecker Director of Public Works/City Engineer BL:jr