HomeMy WebLinkAboutCC 6 PAC BELL CONDUIT 09-16-85AGENDA-.,- .!;?::
TO:
FROM:
SUBJECT:
WILLIAM HUSTON, CITY MANAGER
DALE A. WICK, ASSISTANT CITY ENGINEER
AGREEMENT FOR PACIFIC BELL UNDERGROUND CONDUIT INSTALLATION WITHIN
ASSESSMENT DISTRICT 85-1 TO SERVE THE TUSTIN AUTO CENTER (FILE #2731)
RECOMMENDATION:
It is recommended that the City Council, at their meeting of September 16, 1985,
by minute order, authorize the Mayor to sign and the City Clerk to attest to
attached subject agreement.
BACKGROUND:
This agreement provides the vehicle for installation of telephone conduits within
Assessment District 85-1 on E1 Camino Real and Jamboree Road. The agreement
spells out City and Pacific Bell responsibilities in order to accomplish the
work. This work will be accomplished as an Irvine Company administered contract
designated as Assessment District 85-1 (Phase IV). The Irvine Company will be
reimbursed for costs through the Assessment District 85-1.
Dale A. Wick
Assistant City Engineer
DAW:jr
Attachment
CC:
City Clerk
City Attorney
Finance Director
~:~ ~:~: PACIFIC $~ BELL~
C~sts Mesa, ~aliforni~ 92628
September 9, 1985
City of Tusttn
300 Centenial Way
Tustln, California 92680
C/O Utility Specialists Inc.,
27285 Las Rambles, Suite 160
Mission VieJo, California 92675
Reference: LE(26)1486T, Tustin Auto Center
Legal 84-1032
Attention: Gentlemen
This Letter of Agreement, by and between City of Tustin,
hereinafter referred to as "City" and Pacific Bell, hereinafter
referred to as "Pacific", sets forth instructions for placing the
underground telephone facilities to Tustin Auto Center in
accordance with the California Public Utilities Commission Tariff
Schedule 36T, Rules 15 and 16.
City agrees to:
Prior to the commencement of any work to be performed
hereunder or at a mutually agreed time thereafter, City
shall grant to Pacific all necessary easements for
Pacific's communication facilities in the locations and
in a form satisfactory to Pacific·
Construct to Pacific's specifications·
Furnish and place all required conduit, vault(s), and
incidental hardware; encase all radii and bends (80 feet
or less), where applicable, as per drawing(s).
Job Number LE(26)1468T
Drawing Numbers 3-6
NOTE: INCIDENTAL HARDWARE DOES NOT INCLUDE PEDESTALS OF
INTERFACES.
Obtain necessary permits for all excavation work.
Be responsible for loss of material, unreasonable damage,
breakage and any liability in connection with any material
furnished by Pacific.
Place a pull wire or line in all ducts and verify all ties
and provide accurate measurements for all conduit placed.
Job #: LE(26)1486T
Dwg #: 10 Issue: 1
e
Notify Pacifio's Subway Inspector on 714-835-1162 not
less than ten (10) working days prior to start of conduit
placement·
The City shall provide supervision over the coordination
between various contractors working within the project in
order to prevent damage to the facilities of the utility.
The cost of repairs, replacement or relocation of utilities
made necessary by others will be at the expense of the City
until the project is complete. Project completion is
defined as the first cable being placed in said conduit
system.
When constructed, inspected and accepted, and title to the
underground supporting structure is vested in Pacific, then
Pacific will assume maintenance of the structure. City or
his contractor, however, shall be responsible for any
liability regarding integrity of trench compaction and
paving according to public agency permit requirements for a
period of two years.
e
City shall indemnify Pacific and save it harmless from all
loss or liability of any character whatsoever, including
damage to Pacific's facilities arising directly or
indirectly out of or in connection with the work to be
performed by City, its contractors, employees, agents or
permittees, of the work contemplated hereby or of any
development activity on or for City's Property.
10. After the conduit is accepted by Pacific, provide a bill to
Pacific for the conduit material costs. Send to:
Pacific Bell
Right of Way
3939 E. Coronado, 1st Floor
Anaheim, California 92807
Pacific agrees to:
1. Furnish City with working drawings and specifications for
placing conduit and/or vault(s).
2. Furnish a list of approved contractors supplier index and
material specifications.
3. Furnish and place all pedestals and (or) interfaces.
4. Provide inspection for the placement of conduit and/or
vault(s) or manholes·
Reimburse City $175.00 each for 3 vault frame(s), and
cover(s), $.82 per duct foot for 11,184 linear feet of four
inch conduit, for a total of $9,695.88.
Job #: LE(26)1486T
Dwg.#: 11 Issue: I
Failure by either party to comply with the agreements as set
forth in this letter could cause delay in providing service to
the subject development.
Also, if there is no evidence of construction within 90 days from
the date of execution, this Letter of Agreement may be terminated
by written notice from either party.
Upon completion of work and acceptance by Paoifio's Inspector,
this letter shall be deemed as a BILL OF SALE, thereby
transferring ownership of said conduit and manholes to Pacific,
free and clear of any and all liens, claims and encumbrances.
Please sign the original copy of this letter and return to
Pacific Bell, Engineering Department, Room 105, 3160 Redhill
Avenue, Costa Mesa, CA
Yours truly,
Denise ~uby
Engineer, Pacific Bell
Telephone: 714-966-6198
92626.
CITY APPROVAL
PACIFIC APPROVAL
BY
TITLE Mayor of the City of Tustin
DATE
APPROVED AS TO FORM
By:
Title:
Date:
Attest:
City Clerk of the City of Tustin
ACCEPTED BY
PACIFIC'S SUBWAY
INSPECTOR
DATE
Job ~: LE(26)1486T
Dwg.#: 15