Loading...
HomeMy WebLinkAboutRPT 3 PKG STRUCTURE 12-18-84FROH: SUBJECT: HONORABLE MAYOR AND CITY COUNCIL MEMBERS COMMUNITY DEVELOPMENT DEPARTMENT STATUS REPORT CONCERNING CITY PARKING STRUCTURE Members of staff and Gfeller ~evelopment meet on-site with a representative from Booth Twining Laboratories to review cracks and determine which ones will require x-ray photographs. Selected beams, columns and deck slab areas were chosen, but it was decided that further confirmation of these locations was needed by the Engineer in charge of the project, Newman Engineering. After a period of time a representative from Newman Engineering has reviewed the project and confirmed the areas to be x-rayed. The x-ray photographs will be taken on December 11, and 12, 1984. In addition, GeoSoils, Inc. will be drilling and sampling the ramp area to the upper parking level. This will be accomplished on December 13, 1984. The results of these two studies will hopefully confirm the placement of reinforced steel and determine the characteristics of the backfill material underlying the concrete ramp. The information will be used to help determine the cause of the cracks and what, if any, steps need to be taken to correct the condition. Associate Planner