Loading...
HomeMy WebLinkAboutRPT 4 CITY PKG STRUC 09-17-84REPORTS ~ NO, 4 I)ATE: September 17, 1984 _ TO: HONORABLE MAYOR AND CITY COUNCIL FROM: COPl~JNITY DEVELOPMENT DEPARTI4ENT SUBJECT: STATUS REPORT CONCERNING CITY PARICING STRUCTURE BACKGROUND AND DISCUSSION: On September 10, 1984 a meeting of interested parties and City staff was held at the offices of Gfeller Development to receive the structural engineers report concerning structural problems with the "C" Street parking structure. The structural engineer stated that the design and building calculations were correct and that the cracking of the concrete may be related to construction methods or omissions of Critical features of the reinforcing elements. As a result, he recommended the following tests be performed on the structure: 1) Concrete and soil core samples of the ramp and,compacted base material. 2) X-ray investigation of wall and ramp connections to determine the location of reinforcing bars. Such 'investigations would provide the necessary information to ai'd in determining the cause of the concrete cracking. The representatives from Gfeller Development stated they would seek bids for the investigative work and acknowledged their responsibility for the maintenance of the structure as contained in their agreement with the Redevelopment Agency. The testing and reporting procedure should be completed within two weeks. Senior Planner AW:do