HomeMy WebLinkAboutCC 6 MOULTON PKWY 04-16-84OA?E: MAR~H 198 Inter-Corn TO: WILLIAM HUSTON, CITY MANAGER FROM: DALE A. WICK, ASSISTANT CITY ENGINEER SUBJECT: MOULTON PARKWAY FAU PROJECT M-M032(O04) COMMON USE AGREEMENT FOR FUTURE MAINTENANCE RECOMMENDATION: It is recommended that the City Council, at their meeting of April 16, 1984, by minute order, .authorize the Mayor to sign and the City Clerk to attest to the attached Common Use Agreement. BACKGROUND: As is explained in the attached correspondence from the San Diego Pipeline Company, dated March 26, 1984, the City of Tustin was obligated to pay all costs in connection with the relocation of subject pipeline to permit construction of the Myford Road overpass at the A.T. & S.F. Railroad tracks. The City deposited '$83,600.00 with the San Diego Pipeline Company for estimated costs of engineering and construction. San Diego Pipeline has now agreed to leave its pipeline in place if the City will pay future costs of cutting and replacing the bridge abutment slope paving to allow access to its facility when and if maintenance of the pipeline is ever required. It is estimated that, in the unlikely event that maintenance is required,.these costs would amount to about $6,000.00. Execution of this document will result in the $83,600.00 deposit, less expenses, being refunded to the City. This Agreement has been forwarded to the City Attorney for his review. Dale A. Wick Assistant City Engineer DAW:jr Attachment cc: City Clerk City Attorney Finance Director RECEIVED APR 0 5 1984 Diego Pipeline Compsay (213) March 26, 1984 ENG 12-0 (RCN-536) ENG 13-0 (ER-83122) City of Tustin Department of Public Works/Engineering 300 Centennial Way Tustin, CA 92680 Attention: Mr. Dale A. Wick, Resident Engineer Regarding: Moulton Parkway FAU Project M-M032(004) Myford Road Overcrossing RECEIVED MAR 2 9 1984 TUSTIN PUBLIC, WORKS DEPT. Gentlemen: Reference previous correspondence and discussions regarding City of Tustin's construction of subject Myford Rd. Overcrossing in the vicin- ity of our 10-inch high pressure refined petroleum products pipeline. Our original proposal to relocate a section of the pipeline in order to keep it readily accessible for maintenance purposes was denied by the AT & SF Railway Company, due to insufficient clearance with the railroad tracks. San Diego Pipeline Company (SDPC) is agreeable to leaving the pipeline in its existing location, provided the City of Tustin enters into a formal agreement with this Company which recognizes and protects our easement rights, inasmuch as construction of subject Overcrossing will result in .additional fill and concrete slope paving being placed over a section of the pipeline. Enclosed are two copies of a CommDn ~se Agreement for City's execution. Please return both copies for our further handling; a fully-executed copy will be returned for your files. A refund of City's deposit, less SDPC expenses in connection with the project, will be forthcoming pending our receipt of the executed Agreement. any questions on this matter to Mr. David Schluer at Please direct (213) 629-6679. Sincerely, /2 /J. M. Abboud, A6tin9 Manager-Engineering Enclosures COMMON USE AGREEMENT THIS AGRfEMENT, dated this day of , 1984, for identification purposes only, by and between the CITY OF TUSTIN, CALIFORNIA, hereinafter referred to as 'City", and SAN DIEGO PIPELINE COMPANY, a California corporation, herein- after referred to as "Company", RECITALS 1. WHEREAS, Company holds a 10-foot wide easement for pipeline purposes within Atchison, Topeka and Santa Fe Railway Company right of way, as recorded in Book 14011, Pages 351-55, Official Records of Orange County, California; and 2. WHEREAS, City will extend Myford Road across said Atchison, Topeka and Santa Fe Railway Company right of way, by means of an overhead bridge structure, in connection with the Moulton Parkway FAU Project M-M032(004); and 3. WHEREAS, construction of the northeast embankment of said Myford Road Overhead will result in additional fill and concrete slope paving being placed over Company's 10-inch diameter pipeline; NOW, THEREFORE, in consideration of the faithful performance by the City of the following terms, covenants and conditions, Company consents to City's installation and maintenance of said additional fill and concrete slope paving over Company's 10-inch pipeline, subject to the following conditions: 1. If, at Company's sole option, it becomes necessary to excavate withing the limits of said additional fill and slope paving, in accordance with Company's easement right to construct, reconstruct, renew, relocate, maintain and operate a pipeline or pipelines, the City shall bear the entire costs of the following: a) Cutting and removal of concrete slope paving. b) Excavation of the first five (5) feet of underlying fill, and replacement of same (including compaction). c) Replacement of slope paving, in accordance with City's specifications. 2. City hereby agrees to n~tify Company's District Superintendent at (714) 877-2373, Rialto, California, at least one (1) week prior to the commencement of any work near Company's pipeline. 3. City hereby releases and agrees to indemnify and hold Company safe and harmless against any loss, liability, cost or expense by reason of any injury or damage to persons or property (including, but not limited to, persons and property of Company and City and their personnel) or any claim thereof, arising out of the abovementioned installation, restoration, replacement, maintenance or repairs, or out of the use and exercise of any or the rights, privileges or permission provided for to City hereunder. ' IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed by their officers thereunto duly authorized. CITY OF TUSTIN, CALIFORNIA By' Dated: Attest: SAN DIEGO PIPELINE COMPANY By: Dated: Attest: