Loading...
HomeMy WebLinkAboutRDA DESIGN REVIEW 03-05-84I~TE: March 5, 1984  ~EVELOPMENT AGENCY hu. 4 3-5-84 Inter-Corn TO: SUBJECT: Honorable Chairman & Members of the Redevelopment Agency Community Development Department Design Review - 14851-14921 Newport Avenue Background and Discussion At the February 27, 1984 meeting the Tustin Planning Commission approved the development of a 156-unit residential condominium project at the southerly terminus of Newport Avenue. The design of the complex is nearly identical to the previously approved design of the property as approved by the City Council in October, 1983 (Resolution No. 83-75). Notable items of change include: In addition to the two (2) parking spaces per unit, 31 additional unassigned p~rking spaces have been provided for visitor use. The units have been reduced from the 161 originally approved to 156. The architectural style is similar in nature with the use of stucco walls and hip roof design. The units, however, are divided up into smaller individual structures tied together by elevated walkways instead of the larger structure of the.previous approval. The Planning Commission report and Exhibit "A" conditions as amended by the Commission are included with this report. The Redevelopment Plan does not require a public hearing for site review and as such does not require a discretionary action by the Agency. The Redevelopment Agency Can make suggestions it feels prudent and justifiable i*n order that the proposal meet the intent of the Redevelopment Plan. This project will also increase the quantity and quality of the housing stockin the area which is an objective of the Redevelopment Plan. Recommendati on The pleasure of the Redevelopment Agency with regard to review and input from the proposed project. Senior Planner Attachments: Planning Commission Report Packet Exhibit "A" (as amended by the Planning Commission) Repor Planning Commission PUBLIC HEARING NO. 5 FEBRUARY 27, 1984 SUBJECT: Use Permit 84-5 APPLICANT: The Robert P. Warmington Company LOCATIO#: 14851-14921 Newport Avenue ZONING: Rlanned Development (PD) District ENVIRONMENTAL ~ATUS: A request for Negative Declaration of environmental impact has been filed REQUEST: Authorization to develop 156 residential condominiums and to vary from the open space requirements Background -In March, 1980, the City Council re-zoned the subject property to Planned Development {PD) District to bring the zoning into conformance with the land use designation of the Tustin Area General Plan. On February 2, 1981, the Planning Agency approved the development of a 208-unit residential condominium project upon an application of The Robert P. Warmington Company. The project was never acted upon and the permit expired. In September of 1983, Use Permit 83-16 was approved to authorize construction of a 161-unit residential condominium project to Pacific Coast Builders. The sale of the property was not finalized and The Robert P. Warmington Company retained ownership of the parcel. Discussion This application proposes the development of 156 condominiums on a site of approximately 5.9 acres. An additional 5,150 square feet is currently being considered for addition to the project from two adjoining parcels in the City of Santa Aha. The acquisition of the additional land is to aid in qualifying for a 5% waiver of open space. The PD District authorizes 45% open, rather than the usual 50% when a project abuts permanent open space. In this case, the Costa Mesa Freeway embankment, fully landscaped by the developer, is proposed to satisfy the waiver requirement. However, the project still requires an approval to vary from the open space requirement with a total coverage of 58%. Community Development Department Use Permit 84-5 February 27, 1984 Page 2 The site design provides for three groups of buildings each surrounding an open recreation area. Vehicle and pedestrian access is via a single driveway entrance, secured by a gate house. The circulation pattern provides complete access to the rear of all units. Parking is provided at the correct ratio of two spaces per unit, half of which are covered, plus thirty-one (31) visitor spaces. This site layout is almost identical to that proposed by Pacific Coast Builders with less units, however, and more parking spaces. The site is impacted environmentally by freeway and rail noise. An initial environmental study with a supplementary noise impact .study was submitted and reviewed by the Planning Commission with the Pacific Coast project. The revised plans were reviewed by a contract consultant retained by the City: The analysis of the noise environment is as follows: A. The existing railroad noise level (63dBA) at the southwest facing units is above California state limits which requires attenuation of the levels within the individual units. B. The existing freeway greatly impacts the site from 78dBA (CNEL) at the third floor level to 75dBa (CNEL) at the second floor level. Such levels also require interior sound alteration by the state. The courtyard of Phase I would be impacted by levels of 68dBA.. Sixty-five (65) dBA is considered the maximum level acceptable for recreational areas. C. The proposed high speed rail system is expected to impact the nearest units by single events of about 80dBA and at worst case 130 operations per day this could result in 66dBA (CNEL) reading (including Amtrak freight). D. The potential noise impact from increased Newport Avenue traffic due to a railroad crossing, could reach CNEL levels of 66dBA at the uppers floors and 60dBA at the ground level. Analysis The application conforms to zoning code regulations with the exception of the open space issue. Without the purchase or long-term lease of the two small adjoining parcels,, the project is slightly below the 45% open space figure. Since the freeway embankment is going to remain as open space, its landscaping will definitely enhance the view of this feature and the 45% open space allowed could be considered. But, since this additional land is not within the City, annexation of said parcel should be instituted at the owners expense. The design should minimize any negative visual effect of the parking and driveway by the use of mounding and screening perimeter walls. The preliminary planting plans provide a conceptual plant palet but does not indicate locations of specific species, The species selected would appear not to present any problems unless improperly located. Community Development Department Use Permit 84-5 February 27, 1984 Page 3 The architecture is a contemporary style but should easily be compatible with the surrounding buildings by the use hip roofs. The elevations should be viewed as conceptual. Detailed plans will be reviewed by staff at the plan c'heck phase which will then be submitted for Commission review. Staff has some concern regarding the three-phase construction proposal. If this plan is to be approved, the developer should provide the City with a precise program work schedule. Each phase should be able to stand by itself in regard to zoning, building and safety matters upon each completion. Also, provisions should be presented to insure the health, safety and comfort of those residents occupying the first phase while construction work continues on the site. Parking accommodation should be assigned at two (2) spaces per unit and included in the Covenants, Conditions and Restrictions {CC&R's). The extra visitor spaces, located near the main entrance, should not be assigned. The noise study found that interior noise criteria could be met without use of a highway noise barrier. Non-opening windows and well-sealed doors can be utilized to reach specific limits. Recreational use of areas between the development and freeway would not be feasible with this approach, and walls would need to be constructed across building gaps to shield interior courtyard areas. The effect of existing and planned rail activity would require additional insulati'on treatment than proposed in the study for units facing the southwest boundary. Visual improvements for these units could be made by appropriate landscaping at the boundary. Additional insulation treatment is also recommended along the southeast boundary to prepare for a possible extension of Newport Avenue and to mitigate noise from traffic entering and leaving through the entry gate area. Noise insulation criteria which must meet worst case noise conditions for the potential intruding noise sources described above, are presented in Figure 1. The values of Sound Transmission Class (STC) shown represent the minimum design values which would not violate interior noise limits. They apply particularly to windows and doors, and presumably would be met by proposed wall/ceiling construction design. Recommendation Through building arrangement and use of recommended mitigation measures, the development can comply with the Noise Element of the Tustin Area General Plan and the Noise Ordinance. The proposed project complies with all provisions of the Planned Development District with the exception of open space requirements. This application was noticed with a variance request for that purpose. Community Development Deparlment Use Permit 84-5 February 27, 1984 Page 4 Staff therefore recommends the following: 1. Approve staff's finding of Negative Declaration for the subject project. 2. Approve Use Permit 84-5, including a variance, subject to conditions attached in Exhibit "A". Staff will present a resolution at your next meeting reflecting the Commission's decision and necessary findings. Senior P~anner AGW:jh Attachments: Development Review Summary Figure 1 Exhibit "A" Exhibit "B" Project Plans Community Development Department Project: Location/District: Action: DEVELOPMENT REVIEW SUMMARY 156-UNIT RESIDENTIAL CONDOMINIUMS 14851-14921 Newport Avenue/Planned Development USE PERMIT 84-5 Building: Front Setback Side Setback Rear Setback Gross Square Footage Net Floor Square Footage Height Number of Stories Materials/Colors Lot Size Lot Coverage Parking: Number of Spaces Ratio (space/square footage) Percent of Compact Spaces Type Uses: Number of Public Notifications (Owners): Environmental Status * No Standard District Requirement Proposed 35' from 15' (arterial) cul-de-sac 5' 4g' * 49' 127,600 149,620 sq.ft. None 37.5' None 3 Not Commission Review Determined 257,000 + * 5,150 sq. ft. S5% when adjacent to permanent open space 58% 312 344 2/unit 2.2./unit 20% 9.3% 50% covered 50% covered Multi-family Residential Residential Condo Application for Negative Declaration Cornmunity Development Department o EXHIBIT "A" CONDITIONS OF APPROVAL USE PER,lIT 84-5 The Covenants, Conditions and Restrictions for this .condominium project shall be reviewed and approved by City Staff and City Attorney prior to their recordation. The CC&R's shall specifically dictate responsibilities between the homeowners association and private property owners for the maintenance, both interior and exterior, of all buildings, plumbing and electrical facilities. The CC&R's shall also specifically prohibit the storage of recreational vehicles within the complex. A landscape and irrigation plan approved by the State Department of Transportation shall be submitted for staff approval prior to landscaping the Costa Mesa Freeway embankment as indicated on the approved project site plan. A written commitment from Caltrans shall 'be submitted providing for the long-term maintenance*of the freeway embankment. If such commitment cannot be obtained, the condominium homeowners association shall be responsible for the embankment maintenance as provided in their recorded CC&R's. Included within this use permit is the proposed use of adjoining privately held property and the Costa Mesa Freeway embankment for landscape and open space purposes. Since portions of the aforementioned areas are located outside of the City of Tustin, written authorization shall be provided the City of Tustin from the governing agency certifying conformance with Santa Ana zoning regulations for the proposed property use, prior to issuance of any City Building Permits for the subject condominium project. Additionally, the project applicant shall initiate on behalf of the City of Tustin a jurisdictional reorganization application with the County Local Agency Formation Commission and pay all necessary processing fees. The City boundary line between the cities of Tustin and Santa Aha shall be re-aligned coterminius with the edge of pavement along the southerly side of the Newport Freeway. The final site plan fully dimensioned and detailed along with the final building elevations fully dimensioned and detailed, shall be submitted for Planning Commission final approval including consideration of the final color scheme and architectural treatment of all building exteriors. All open dirt areas of future phases shall be maintained free of weeds, building materials and debris during construction of the project. Dust retardant or seeding with grass shall be utilized to prevent airborne dust and soil erosion. The final site plan architectural drawing and landscape, submitted for review and approval by the Planning Commission shall be consistent with the illustrative site plan prepared and submitted by Hogan, Ray Partners, Inc. for Planning Commission review. All amenities shall be substantially constructed including pools, spas, patios and clubhouse. Landscape and driveway pavement treatments shall also be constructed as indicated and an expanded driveway re-alignment shall be incorporated to allow for more open space within interior open space area. Community Development Department Exhibit "A" Use Permit 84-5 Page 2 10. 11. Should security access gates be installed, all units shall be properly wired to provide communication from the guard house to each unit. The CC&R's shall contain restrictions against the conversion of garage spaces to any other use except the storage of motor vehicles. The City shall be a part of the CC&R's and any modification of the CC&R's concerning this condition shall require approval by the City of Tustin. Due to the minimal number of project parking spaces to promote usage of single car garages for the storage of automobiles and not for storage or conversion to living spaces, garage door openers shall be installed on all garage doors. The CC&R's and the Final Department of Real Estate report shall contain disclosure statements concerning the following matters: 1. Potential Newport Avenue grade crossing to Edinger Avenue. 2. Potential noise impacts from high speed commuter'trains on the railroad tracks adjacent to site. 3. Noise impacts from existing Costa Mesa Freeway potential increases in Newport Avenue road traffic. 4. Future buyers shall be made aware of the City's plans to either extend Newport southerly to Edinger Street with an at-grade crossing of the railroad tracks or with a grade separation above the tracks (approximately 22 feet above existing ground level). Environmental mitigation measures shall be required to reduce both exterior and interior noise levels to conform with the interior requirements of the City of Tustin Noise Ordinance. Said mitigation measure as recommended by the City-retained firm of Engineering Sciences shall be included on the final plans for approval by the Planning Commission. Such mitigation measures may include construction of sound attenuation walls, increases in the quantity of structural insulation and reduction of exposed glazing. Noise attenuation measures shall be incorporated into the construction drawings as indicated in Figure 1 and in the body of this Use Permit No. 84-5 report. Evidence of complying with value of Sound Transmission Class (STC) as indicated on Figure ! (plot plan) shall be required of the developer upon submittal of plan check drawings to the City Building Department. All work within the public right-of-way will require a permit from the City of Tustin Engineering Department. Community Development Department Use Permit 84-5 Exhibit "A" Page 3 13. Sanitation District, Water District, new development taxes, and parkland dedication fees are to be paid to building permit issuance as follows: 1. East Orange County Water District fees in the amount of $500.00 per unit. 2. County Sanitation District fees in the amount of $250.00 per unit. 3. New development tax fees in the amount of $73,800. 4. Parkland dedication fees in the amount of $39,000. 14. The final site plan shall be standardized and reflect all appropriate City - standard drawing numbers. The developer shall construct all missing or damaged street improvements adjoining said development per the City of Tustin "Minimum Design Standards of Public Works" and "Street Improvement Standards". This work shall consist of but is not limited to: 1. curbs and gutters; 2. sidewalks; 3. drive aprons; 4. street pavement; 5. street trees; 6. street lights; and 7. sanitary sewer facilities. 15. The entry drive shall be revised to conform to City of Tustin Standard Plan No. 108E. This radius type drive requires dedication of additional right-of-way as shown on said Standard Plan. 16. Continuous 6" concrete curbs shall be provided to separate landscape planters from parking spaces and drive aisles. 17. All roof equipment and vents must be screened from view to the satisfaction of City Staff. 18. All signs must be approved by the Planning Department prior to permit issuance. 19. Separate permits are required for plumbing, electrical, grading, signing and any work performed within the public right-of-way. 20. A looped domestic water system and easements shall be provided per the requirements of the City Engineer. If this water system is phased, the first phase shall be sized for a dead end system. A minimum of 4-5 water meters will be required depending on the building and plumbing layout. Separate meter{s) will be required for the landscape irrigation system. Community Development Department /"-Use Permit 84-5 Exhibit "A" Page 4 21. The developer shall provide the City with a construction schedule of project phasing which will include the following: A. Time schedule for the anticipated commencement and completion of each phase. B. List of all community facilities to be completed in each phase. Each phase must satisfy all zoning, building and safety requirements and said requirements must be completed prior to final release of any structure. C. Construction program which will insure the health, safety and comfort of those residents occupying the initial phases and adjoining property owners while construction work continues on the site. 22. All required public improvements and Newport Avenue setback landscaping §hall be completed prior to the release for occupancy of phase one. 23. During all phases of construction, the project shall institute accepted grading measures to control sedimentation runoff into the upper Newport Bay drainage area. 24. The trash receptacle locations appear to provide adequate maneuverability for the refuse disposal truck. The developer shall provide the City a letter from S.C.A Disposal Service approving the locations and.their ability to service the development. 25. Tentative and final tract maps must be submitted for review and approval. 26. Dedication of all street right-of-way along Newpori Avenue as required by the City Engineer. 27. Dedication of all access rights to Newport Avenue to the City except at driveway openings per the approved site plan or temporary access during construction. 28. Preparation of a final grading plan for review and approval by the City.' 29. Annexation of the entire parcel to the Orange County Street Lighting and Maintenance District. Subject annexation papers must be provided to the City prior to final approval of final tract map. 30.¸ Installation of marbelite street lights with underground conduit along Newport Avenue as required by the City Engineer along with the payment of the installation charges to the City of Tustin. 31. Grading plans and soils report by state registered civil engineer are required. 32. Indicate the building data on the plans to be as follows: Use or occupancy - R-1 Type of construction - Type V-1HR Community Developmen! Department /"-Use Permit 84-5 Exhibit "A" Page $ 33. 34. 35. 36. 37. Check and show allowable areas of the buildings per Chapter 5 of the UBC and the protection of openings between buildings. Revise plans to show floors above the second story shall have no less than two exits pursuant to Section 3302 of UBC. Prior to the completion of an application for building permits for combustible construction, evidence that a water supply for fire protection is available shall be submitted to the County Fire Marshal. Entrance shall be designed to permit emergency vehicle operators to negotiate turn for entering and exiting in one motion. To facilitate adequate maneuvering area for the five visitor spaces at the main entrance, the driveways shall be enlarged to 25' by reduction of the width of the median planter. Community Development Department I [ I