HomeMy WebLinkAboutOB 1 WTR WELL LOCATION 1-3-84AGENDA
DATE:
DECEMBER 22, 1983
OLD BUSINESS
NO. I
1-3-84
Inter-Corn
TO:
FROH:
SUBJECT:
WILLIAM HUSTON, CITY MANAGER
BOB LEDENDECKER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUPPLEMENTAL REPORT TO WATER WELL LOCATION STUDY
The City Council, at their December 19th meeting, requested additional information
regarding any potential savings that could be realized by the drilling of two
water wells under one contract in lieu of two separate contracts.
Contact was made with three contractors to determine what the cash saving might be
with respect to including two wells under one contract in lieu of just one well.
Two contractors indicated a saving of move-in/mobilization cost, which was
estimated at about $5,000.00. The third contractor would indicate a potential
saving of about 10%'of one well cost or about $30,000.00.
The City's consultant and staff estimates the total cost saving to be between
$5,000 and $10,O00, Which would include constrUction and plan/specification
preparation. The City's in-house contract administration cost would result in a
saving of about $1,000 for the two combined projects in lieu of two separate
contracts.
-Bob Ledendecker
Director of Public Works/City Engineer
BLijr
cc: Earl Rowenhorst